expand Chapter : 01 Quality Management System (QMS) for Asphalt Pavements ‎(5)
expand Chapter : 02 Materials Used in Asphalt Paving ‎(4)
expand Chapter : 03 Asphalt Pavement Design ‎(6)
expand Chapter : 04 Asphalt Mix Design and Job Mix Formulas ‎(14)
expand Chapter : 05 Asphalt Plant Equipment and Requirements ‎(10)
expand Chapter : 06 Asphalt Plant Operations ‎(12)
expand Chapter : 07 Asphalt Mixture Sampling and Testing ‎(21)
expand Chapter : 08 Recycling of Asphalt Pavements ‎(7)
expand Chapter : 09 Roadway Paving Operations ‎(11)
expand Chapter : 10 Roadway Inspection and Testing of Asphalt Pavements ‎(10)
expand Chapter : 11 Pavement Smoothness / Rideability ‎(1)
expand Chapter : 12 Records and Reports ‎(5)
expand Chapter : Appendices ‎(2)

 Asphalt QMS Manual Search Results

 

 

10 Roadway Inspection and Testing of Asphalt Pavements141653391/26/2018 3:34:50 AMDepartment personnel shall review the previous day’s roadway paving operations with Contractor personnel Any pavement mat problems resulting from unsatisfactory workmanship such as 52https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-10-02
04 Asphalt Mix Design and Job Mix Formulas141654691/26/2018 2:37:50 AMOnce a mix design for a specified mix type has been approved, and if the Asphalt Design Engineer is in concurrence with the design and proposed target values, the JMF data will be 92https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-04-10
07 Asphalt Mixture Sampling and Testing141653891/26/2018 3:03:44 AMSampling and testing of asphalt mix are two of the most important functions performed by QC/QA technicians to assure that a quality product is obtained Once the job mix formula is 32https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-07-01
07 Asphalt Mixture Sampling and Testing141653581/26/2018 2:51:23 AMContents 7.18.1 SIGNIFICANT DECIMALS 7.18.2 VOIDS IN TOTAL MIX (VTM) CALCULATION 7.18.3 AGGREGATE EFFECTIVE SPECIFIC 211https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-07-18
04 Asphalt Mix Design and Job Mix Formulas141654731/26/2018 2:39:40 AM(from Asphalt Institute’s, SP-2, 3rd ed top of page ] Previous Page | Next Page string;#<a style='float:left;text-align:left;margin-left:20px;' href 356https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-04-16
04 Asphalt Mix Design and Job Mix Formulas141656921/26/2018 2:34:07 AMContents 4.3.1 PERMANENT DEFORMATION (RUT RESISTANCE) 4.3.2 DURABILITY 4.3.3 FLEXABILITY 185https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-04-03
06 Asphalt Plant Operations141653791/26/2018 2:45:47 AMThe production and construction of a high quality asphalt pavement meeting the mix design requirements and with the required density begins with the cold feeders at the asphalt 49https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-06-05
07 Asphalt Mixture Sampling and Testing141653561/26/2018 3:08:14 AMAll test procedures utilized by the Department are generally in accordance with AASHTO or ASTM standards Any modifications to these procedures are covered in detail in the 28https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-07-06
12 Records and Reports141653025/15/2017 2:13:25 PMThe Contractor shall document all observations, records of inspection, samples taken, adjustments to the mix, and test results on a daily basis Entries that have been made in error 52https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-12-02
07 Asphalt Mixture Sampling and Testing141653551/26/2018 3:09:49 AMContents 7.5.1 AGGREGATE, RAP, AND RAS SAMPLING 7.5.2 NUMBERING OF MIX SAMPLES 7.5.3 SAMPLING MIX FROM TRUCK 88https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-07-05

 Related Documents

 

 

QAP Login Access141680406/6/2012 1:36:22 PM6/6/2012 1:36:22 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx0https://dot-spsappp11.dot.nc.net:4431aspxFalseaspxhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{09D60E91-4229-402A-9734-128D354BAB3C}SharePoint.Link~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js00
2020 QMS Asphalt Manual43506164/10/2020 4:26:23 PM4/10/2020 4:26:23 PMNorth Carolina Department of Transportation Materials and Tests Unit Asphalt QMS Manual Table of Contents Asphalt QMS - 2020 i PREFACE This manual has been prepared as a STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx24381060https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{4A01E542-C69B-4512-8891-8BD9FB2A4BC9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
DOCUMENTATION ON PURCHASE OF SAFETY TOE SHOES (PR05)9011995Revised 6/2006 to allow for tracking both retail and shoe truck purchases6/7/2018 3:13:00 PM6/7/2018 3:13:00 PM(Rev. 01/2014) North Carolina Department of Transportation I. I request reimbursement or payment for the purchase of safety toe shoes required for use on my job with the N. C STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx140170https://dot-spsappp11.dot.nc.net:4431docFalsedochttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{802B0074-6E6C-41F2-951E-D1A99063AABF}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js11
Form 251R - Material Received Report (Example)1416789011/30/2011 1:09:00 PM11/30/2011 1:09:00 PMThe Materials Received Report (MRR) (M&T Form 251) should be completed when any material is received on the project that is to be incorporated into the construction on a temporary STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx1569270https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{AF0206D6-F7B2-4567-8D9D-36CC666F3441}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
ABC Sampling Manual141679822/24/2020 4:37:59 PM2/24/2020 4:37:59 PMMaterials and Tests Unit - Field Operations Section Section 5 – Sampling Identification and Numbering Section 7 – Check Sample Identification and Numbering A sample is defined as a STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx1814530https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{8E8B919D-E7C7-4F28-9C42-0AEA33261551}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Project Materials Certification Guide for LGA Administrators141680356/19/2019 3:39:49 PM6/19/2019 3:39:49 PMThis guide is designed to be a resource to a Local Government Agency (LGA) when administering a project with Federal funds This guide provides explanation and resource links for STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx670190https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{C5EB1A48-B3CF-4EDC-8DA9-16FD6A7E59A9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Pavement Design Manual150622692/6/2019 2:30:54 PM2/6/2019 2:30:54 PMMaterials and Tests Unit – Pavement Section The pavement design guidelines included herein are to be used for the design of all new and rehabilitated projects in North Carolina STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx3197770https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{1AA684DF-7F93-4222-A78D-7C5B2B1DDCE1}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Conventional_Density OJT_MT520141678519/14/2017 1:19:46 PM9/14/2017 1:19:46 PMMaterials and Tests Unit – GeoMaterials Laboratory Conventional Density - On-the-Job Training (OJT) Checklist As a minimum, technician must complete the following tasks to begin the STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx703160https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{FEE99A92-6FBC-42F6-8C27-430EF6E1DD76}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Borrow Pit Sampling Manual141678282/24/2020 4:30:35 PM2/24/2020 4:30:35 PMMaterials and Tests Unit – Field Operations Section Section 2 – Importance of Proper Sampling Appendix B - Product Summary of Select Material and Shoulder / ……………16 STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx2530540https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{B3178FB3-B6E9-4B8E-A560-FCEE333403B6}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Approved Vendor-Producer Supplier List141677988/27/2012 7:50:42 PM8/27/2012 7:50:42 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx0https://dot-spsappp11.dot.nc.net:4431aspxFalseaspxhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{684E9FC4-E2F3-4F32-AB5F-743C252EA096}SharePoint.Link~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js00

Was this page helpful?