expand Chapter : 01 Quality Management System (QMS) for Asphalt Pavements ‎(5)
expand Chapter : 02 Materials Used in Asphalt Paving ‎(4)
expand Chapter : 03 Asphalt Pavement Design ‎(6)
expand Chapter : 04 Asphalt Mix Design and Job Mix Formulas ‎(14)
expand Chapter : 05 Asphalt Plant Equipment and Requirements ‎(10)
expand Chapter : 06 Asphalt Plant Operations ‎(12)
expand Chapter : 07 Asphalt Mixture Sampling and Testing ‎(21)
expand Chapter : 08 Recycling of Asphalt Pavements ‎(7)
expand Chapter : 09 Roadway Paving Operations ‎(11)
expand Chapter : 10 Roadway Inspection and Testing of Asphalt Pavements ‎(10)
expand Chapter : 11 Pavement Smoothness / Rideability ‎(1)
expand Chapter : 12 Records and Reports ‎(5)
expand Chapter : Appendices ‎(2)

 Asphalt QMS Manual Search Results

 

 

10 Roadway Inspection and Testing of Asphalt Pavements141653411/26/2018 3:29:16 AMContents 10.4.1 DENSITY GAUGE QC PROCEDURES 10.4.2 LOCATION OF QC DENSITY GAUGE CONTROL STRIPS 10.4.3 FREQUENCY OF 463https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-10-04
05 Asphalt Plant Equipment and Requirements141654771/26/2018 2:40:53 AMContents 1. ALL PLANTS 2. BATCH PLANTS 3. DRUM PLANTS The following inspection 36https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-05-04
06 Asphalt Plant Operations141654262/7/2018 9:07:07 PMContents 6.1.1 ASPHALT BINDER STORAGE AND HANDLING 6.1.2 ASPHALT MIX TEMPERATURE REQUIREMENTS For asphalt mix production, it is 17https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-06-01
10 Roadway Inspection and Testing of Asphalt Pavements141652962/4/2018 7:45:10 PMContents 10.8 ACCEPTANCE OF DENSITY (DENSITY GAUGE AND/OR CORE SAMPLE CONTROL) 10.8.1 PAY FACTOR FOR DENSITY 10.8 90https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-10-08
07 Asphalt Mixture Sampling and Testing141656771/26/2018 3:36:25 AMContents 7.10.1 GENERAL 7.10.2 EQUIPMENT 7.10.3 SAMPLE 7.10.4 PROCEDURE 39https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-07-10
10 Roadway Inspection and Testing of Asphalt Pavements141653432/4/2018 6:55:56 PMContents 10.6.1 CORE SAMPLE DENSITY CONTROL - GENERAL 10.6.2 CORE SAMPLE QC CONTROL STRIP REQUIREMENTS AND PROCEDURES 39https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-10-06
04 Asphalt Mix Design and Job Mix Formulas1416568612/12/2017 3:32:46 PMTABLE 610-5 ​ BINDER GRADE REQUIREMENTS (BASED ON RBR%) ​Mix Type ​ %RBR ≤ 20% ​ 21% ≤ %RBR ≤ 30% ​ %RBR > 30% ​S4.75A, S9.5B, S9.5C 14https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-04-09
12 Records and Reports141653035/15/2017 2:50:33 PMAll QMS forms and reports shall be completed and distributed in accordance with the following detailed instructions for each form The Contractor's QC forms, with required 17https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-12-03
02 Materials Used in Asphalt Paving141653575/12/2017 1:53:00 PMAsphalt pavements are composed of three basic components - 1) asphalt binder, 2) aggregates, and 3) air voids Aggregates are generally classified into two groups - coarse and fine 102https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-02-01
07 Asphalt Mixture Sampling and Testing141656765/12/2017 7:05:54 PMContents 7.9.1 GENERAL 7.9.2 EQUIPMENT 7.9.3 SAMPLE 7.9.4 PROCEDURE 7.9.5 19https://dot-spsappp11.dot.nc.net:4431/resources/Materials/Lists/AsphaltQMSManual/AllItems.aspxFalseAQMSM-07-09

 Related Documents

 

 

North Carolina- Correction Enterprise- Safety Glasses141678666/9/2015 5:12:00 PM6/9/2015 5:12:00 PMCorrection Enterprises is pleased to be a contract provider of prescription safety eyewear through the North Carolina Division of Purchase and Contract Appoints are Made for Tue or STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx37520https://dot-spsappp11.dot.nc.net:4431docFalsedochttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{8D80A473-6EC2-478B-BD98-27EEB28B3511}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js11
2020 QMS Asphalt Manual435061612/12/2019 6:43:07 PM12/12/2019 6:43:07 PMNorth Carolina Department of Transportation Materials and Tests Unit Asphalt QMS Manual Table of Contents Asphalt QMS - 2020 i PREFACE This manual has been prepared as a STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx551790https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{4A01E542-C69B-4512-8891-8BD9FB2A4BC9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Project Materials Certification Guide for LGA Administrators141680356/19/2019 3:39:49 PM6/19/2019 3:39:49 PMThis guide is designed to be a resource to a Local Government Agency (LGA) when administering a project with Federal funds This guide provides explanation and resource links for STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx229130https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{C5EB1A48-B3CF-4EDC-8DA9-16FD6A7E59A9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
MEMORANDUM1416794411/25/2015 6:22:00 PM11/25/2015 6:22:00 PMA Google gmail account is required to download Citrix.If you have not done so already, create a google gmail account The default account to use is ncdotfield@gmail.com. The STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx22580https://dot-spsappp11.dot.nc.net:4431docxFalsedocxhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{99D29F32-DB36-4D3D-ADA6-EC6EEE4E2C25}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js11
Borrow Pit Sampling Manual141678282/24/2020 4:30:35 PM2/24/2020 4:30:35 PMMaterials and Tests Unit – Field Operations Section Section 2 – Importance of Proper Sampling Appendix B - Product Summary of Select Material and Shoulder / ……………16 STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx1600490https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{B3178FB3-B6E9-4B8E-A560-FCEE333403B6}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Pavement Design Manual150622692/6/2019 2:30:54 PM2/6/2019 2:30:54 PMMaterials and Tests Unit – Pavement Section The pavement design guidelines included herein are to be used for the design of all new and rehabilitated projects in North Carolina STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx1387660https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{1AA684DF-7F93-4222-A78D-7C5B2B1DDCE1}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Form 251R - Report of Materials Received141678914/4/2012 7:37:23 PM4/4/2012 7:37:23 PMM & T FORM 251R STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MATERIALS AND TESTS UNIT RALEIGH, NORTH CAROLINA 27607 REPORT OF MATERIAL RECEIVED Project No. Report No STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx55450https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{00614D79-7D95-4311-815A-E5358A2ED62C}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Nuclear Density Testing - Base, FDR and Select Materials141680672/6/2017 4:36:32 PM2/6/2017 4:36:32 PMNuclear Density Testing Manual – Base Course, FDR and Select Materials Materials and Tests Unit – GeoMaterials Laboratory Section 2 – Determining Target Density - Base Course/Select STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx1725500https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{A60F2C63-FF57-4481-A932-9E34E3B972A9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Form 251R - Material Received Report (Example)1416789011/30/2011 1:09:00 PM11/30/2011 1:09:00 PMThe Materials Received Report (MRR) (M&T Form 251) should be completed when any material is received on the project that is to be incorporated into the construction on a temporary STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx995190https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{AF0206D6-F7B2-4567-8D9D-36CC666F3441}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Conventional_Density_Manual_201745939544/9/2018 3:17:05 PM4/9/2018 3:17:05 PMMaterials and Tests Unit – Field Operations Section Section 4 – Determination of Optimum Moisture Section 11 – Documentation Instructions at Project Level In a given amount of soil STS_ListItem_DocumentLibraryhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials/MaterialsResources/Forms/Default.aspx3080https://dot-spsappp11.dot.nc.net:4431pdfFalsepdfhttps://dot-spsappp11.dot.nc.net:4431/resources/Materials{4239C83C-B8D2-4242-B377-0E27880DEEF6}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?