  • 03 PROJECT DELIVERY REQUIREMENTS

  • 3.4 Coordination Requirements

  • ​Coordination with other Units within NCDOT and outside NCDOT is required for most projects and is the responsibility of the Designer or the PEF.  All coordination shall be documented and provided to NCDOT at the culmination of the project.  All coordination meetings shall be documented with meeting minute notes.  The major coordination points are tabulated here: (Link).