  • 03 PROJECT DELIVERY REQUIREMENTS

  • 3.8 SharePoint Application

  • ​All NCDOT TIP Design Bid Build projects are to utilize the SharePoint Application to store all non-confidential project related materials.  The site is to be used for Signing and Delineation consultant plan submittals.

    Additional Resource

    Preconstruction SharePoint Application Memo (Link)