collapse Title : 01 INTRODUCTION ‎(5)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-01'>1.1 Purpose</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-02'>1.2 How to Use the SDU Procedures Manual</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-03'>1.3 Definitions and Acronyms</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-04'>1.4 References</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-05'>1.5 Contacts</a>
collapse Title : 02 PRINCIPALS ‎(7)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-01'>2.1 Introduction </a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-02'>2.2 Purpose of Signing and Delineation</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-03'>2.3 Regulatory Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-04'>2.4 Warning Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-05'>2.5 Numbered Routes</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-06'>2.6 Sign Messaging</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-07'>2.7 Lane Continuity</a>
collapse Title : 03 PROJECT DELIVERY REQUIREMENTS ‎(9)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-01'>3.1 Introduction </a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-02'>3.2 PEF Prequalification Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-03'>3.3 Project Timeline</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-04'>3.4 Coordination Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-05'>3.5 Quality Control Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-06'>3.6 Submittal Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-07'>3.7 Division Design Projects and SDU Coordination</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-08'>3.8 SharePoint Application</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-09'>3.9 NCDOT eSignature Procedures</a>
collapse Title : 04 SIGNING PLANS ‎(20)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-01'>4.1 Introduction</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-02'>4.2 NCDOT Sign Types</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-03'>4.3 Plan Elements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-04'>4.4 Title Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-05'>4.5 Key Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-06'>4.6 Ground Mounted Support Design</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-07'>4.7 Overhead Sign Structure Drawings</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-08'>4.8 Sign Designs, General</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-09'>4.9 Type A and B Sign Panel Designs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-10'>4.10 Type D Panel Designs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-11'>4.11 Type E Signs (Regulatory and Warning Signs)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-12'>4.12 Type F Signs (Route Marker Assemblies)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-13'>4.13 Milemarkers (Reference Location Signs)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-14'>4.14 Overlay Designs and Placement Details</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-15'>4.15 Supports for Types D, E and F Signs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-16'>4.16 Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-17'>4.17 Existing Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-18'>4.18 Proposed Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-19'>4.19 Three-Person Check</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-20'>4.20 Submittals</a>
collapse Title : 05 PAVEMENT MARKING AND DELINEATION PLANS ‎(21)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-01'>5.1 Introduction</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-02'>5.2 Plan Elements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-03'>5.3 Title Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-04'>5.4 Key Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-05'>5.5 Pavement Marking Schedule, Legend and Symbols Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-06'>5.6 Pavement Marking Details</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-07'>5.7 Pavement Marking Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-08'>5.8 Field Investigations</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-09'>5.9 Pavement Marking Design (Linework)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-10'>5.10 Pavement Marking Types</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-11'>5.11 Stop Bars (Lines)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-12'>5.12 Yield Bars (Lines)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-13'>5.13 Curb Ramps and Crosswalks</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-14'>5.14 Balloon Symbol Callouts</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-15'>5.15 Stationing</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-16'>5.16 Lane and Paved Shoulder Widths</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-17'>5.17 Raised Pavement Markers</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-18'>5.18 Delineators</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-19'>5.19 Object Markers</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-20'>5.20 Permanent Work Zone Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-21'>5.21 Submittals</a>
collapse Title : 06 REVISIONS ‎(5)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-01'>6.1 Revisions</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-02'>6.2 Time Frames</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-03'>6.3 Ground Mounted ‘S’ Dimension Field Verification</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-04'>6.4 Overhead ‘S’ Dimension And Slope Field Verification</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-05'>6.5 Correction Procedure For All Revisions</a>
  • 04 SIGNING PLANS

  • 4.9 Type A and B Sign Panel Designs

  • Legend Design

    In urban areas where there is a combination of a street name and a destination on the guide sign, the street name shall be above the destination on the sign.

    Arrows on Overhead Signs

    Type A Arrows on overhead exit direction signs are placed to the right or left of the sign message (depending on direction of the exit) and centered vertically on the sign.  Type C arrows (downward pointing) are lane assignment arrows and shall be used for overhead guide signs to prescribe the use of specific lanes.  Lane control plaques may be used on non-freeway overhead signs to provide additional guidance to the user. (See MUTCD Section 2D.33)

    Arrows on Ground Mounted Signs

    Type A Arrows on ground mounted exit direction signs should be centered horizontally under the message.

    Support spacing

    If the proposed support spacing is not standard for the given panel width, the proposed support spacing shall be added to the panel design note as well as on the design panel (centerlines with spacing).  For proposed signs erected on existing supports, the existing support spacing shall be added to the panel design.

    EXIT ONLY panels

    Exit only panels shall be designed per MUTCD SHS E11-1 Series signs as shown in the 2012 Supplement.  Add the following note to the panel design notes, updating sizes as necessary:

    “Bottom panel shall be yellow Grade C sheeting.  Legend shall be direct applied black non-reflective sheeting.  Arrow shall be black non-reflective sheeting on 0.032" aluminum and demountable.  Yellow panel is XXX" X 36". (Border Type = Recessed, Recess = 0.5", Width = 1.5", Radii = 12")

    Attachment Method and Mounting Method

    Secondary and supplemental signs are either attached to the primary sign by additional “Z" bars or connected directly to the supports. For all secondary and supplemental sign designs, add a note specifying the attachment or mounting method as shown on the support chart. (Link to Standard Drawings​)

    Aluminum Thickness see (Table 901-2) (include for all signs, milemarkers, overlays, etc..)

    Additional Resource

    Type A Overhead Panel Design Example (Link)

    Type B Overhead Panel Design Example (Link)
    Example Type D Panel Design

    Applicable Standard Specifications

    SECTION 901 SIGN FABRICATION
    SECTION 903 GROUND MOUNTED SIGN SUPPORTS
    SECTION 904 SIGN ERECTION

    Applicable Standards

    901.10 TYPE 'A' SIGNS
    901.20 TYPE 'B' SIGNS
    901.50 ARROWS AND SHIELDS
    901.70 SIGN STRINGERS AND SUPPORT SPACING
    904.20 SECONDARY SIGN MOUNTING
    904.30 SUPPLEMENTAL SIGN MOUNTING

Was this page helpful?