collapse Title : 01 INTRODUCTION ‎(5)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-01'>1.1 Purpose</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-02'>1.2 How to Use the SDU Procedures Manual</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-03'>1.3 Definitions and Acronyms</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-04'>1.4 References</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-05'>1.5 Contacts</a>
collapse Title : 02 PRINCIPALS ‎(7)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-01'>2.1 Introduction </a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-02'>2.2 Purpose of Signing and Delineation</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-03'>2.3 Regulatory Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-04'>2.4 Warning Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-05'>2.5 Numbered Routes</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-06'>2.6 Sign Messaging</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-07'>2.7 Lane Continuity</a>
collapse Title : 03 PROJECT DELIVERY REQUIREMENTS ‎(9)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-01'>3.1 Introduction </a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-02'>3.2 PEF Prequalification Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-03'>3.3 Project Timeline</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-04'>3.4 Coordination Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-05'>3.5 Quality Control Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-06'>3.6 Submittal Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-07'>3.7 Division Design Projects and SDU Coordination</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-08'>3.8 SharePoint Application</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-09'>3.9 NCDOT eSignature Procedures</a>
collapse Title : 04 SIGNING PLANS ‎(20)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-01'>4.1 Introduction</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-02'>4.2 NCDOT Sign Types</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-03'>4.3 Plan Elements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-04'>4.4 Title Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-05'>4.5 Key Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-06'>4.6 Ground Mounted Support Design</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-07'>4.7 Overhead Sign Structure Drawings</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-08'>4.8 Sign Designs, General</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-09'>4.9 Type A and B Sign Panel Designs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-10'>4.10 Type D Panel Designs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-11'>4.11 Type E Signs (Regulatory and Warning Signs)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-12'>4.12 Type F Signs (Route Marker Assemblies)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-13'>4.13 Milemarkers (Reference Location Signs)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-14'>4.14 Overlay Designs and Placement Details</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-15'>4.15 Supports for Types D, E and F Signs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-16'>4.16 Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-17'>4.17 Existing Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-18'>4.18 Proposed Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-19'>4.19 Three-Person Check</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-20'>4.20 Submittals</a>
collapse Title : 05 PAVEMENT MARKING AND DELINEATION PLANS ‎(21)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-01'>5.1 Introduction</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-02'>5.2 Plan Elements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-03'>5.3 Title Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-04'>5.4 Key Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-05'>5.5 Pavement Marking Schedule, Legend and Symbols Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-06'>5.6 Pavement Marking Details</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-07'>5.7 Pavement Marking Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-08'>5.8 Field Investigations</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-09'>5.9 Pavement Marking Design (Linework)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-10'>5.10 Pavement Marking Types</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-11'>5.11 Stop Bars (Lines)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-12'>5.12 Yield Bars (Lines)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-13'>5.13 Curb Ramps and Crosswalks</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-14'>5.14 Balloon Symbol Callouts</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-15'>5.15 Stationing</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-16'>5.16 Lane and Paved Shoulder Widths</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-17'>5.17 Raised Pavement Markers</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-18'>5.18 Delineators</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-19'>5.19 Object Markers</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-20'>5.20 Permanent Work Zone Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-21'>5.21 Submittals</a>
collapse Title : 06 REVISIONS ‎(5)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-01'>6.1 Revisions</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-02'>6.2 Time Frames</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-03'>6.3 Ground Mounted ‘S’ Dimension Field Verification</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-04'>6.4 Overhead ‘S’ Dimension And Slope Field Verification</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-05'>6.5 Correction Procedure For All Revisions</a>
  • 04 SIGNING PLANS

  • 4.14 Overlay Designs and Placement Details

  • ​Overlays shall match the background and legend colors and sheeting type of the sign being overlaid.

    The proposed overlay width and height shall cover the existing legend (accounting for the underhang lowercase letters) and not overlap any adjacent existing legend to be retained.  Provide a minimum of 1"-2" edge spacing surrounding all text such that the installation rivets will not have to be placed through the text.  The vertical and horizontal dimensions of overlays do not need to be in 6" increments.

    If the existing sign panel layout is available or field measured, show overlay placement details that dimension the horizontal and vertical placement of the overlay to the nearest sign edge.  If the existing sign panel layout is not known or unable to be measured in the field, provide notes describing the horizontal and vertical placement relative to existing sign legend(s) being retained.

    • Regarding overlays, we recommend a degree of engineering judgement when it comes to the use of overlays. We do not recommend the complete overlay of a sign panel. We also do not recommend replacing an overlay with an overlay. Sign age should be taken into consideration when determining whether an overlay is an option.

    Applicable Standard Specifications

    SECTION 901 SIGN FABRICATION
    SECTION 904 SIGN ERECTION

    Applicable Standards Drawings

    901.60 RIVET SPACING FOR OVERLAYED SIGNS

Was this page helpful?