collapse Title : 01 INTRODUCTION ‎(5)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-01'>1.1 Purpose</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-02'>1.2 How to Use the SDU Procedures Manual</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-03'>1.3 Definitions and Acronyms</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-04'>1.4 References</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-05'>1.5 Contacts</a>
collapse Title : 02 PRINCIPALS ‎(7)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-01'>2.1 Introduction </a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-02'>2.2 Purpose of Signing and Delineation</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-03'>2.3 Regulatory Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-04'>2.4 Warning Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-05'>2.5 Numbered Routes</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-06'>2.6 Sign Messaging</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-07'>2.7 Lane Continuity</a>
collapse Title : 03 PROJECT DELIVERY REQUIREMENTS ‎(9)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-01'>3.1 Introduction </a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-02'>3.2 PEF Prequalification Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-03'>3.3 Project Timeline</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-04'>3.4 Coordination Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-05'>3.5 Quality Control Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-06'>3.6 Submittal Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-07'>3.7 Division Design Projects and SDU Coordination</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-08'>3.8 SharePoint Application</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-09'>3.9 NCDOT eSignature Procedures</a>
collapse Title : 04 SIGNING PLANS ‎(20)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-01'>4.1 Introduction</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-02'>4.2 NCDOT Sign Types</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-03'>4.3 Plan Elements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-04'>4.4 Title Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-05'>4.5 Key Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-06'>4.6 Ground Mounted Support Design</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-07'>4.7 Overhead Sign Structure Drawings</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-08'>4.8 Sign Designs, General</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-09'>4.9 Type A and B Sign Panel Designs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-10'>4.10 Type D Panel Designs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-11'>4.11 Type E Signs (Regulatory and Warning Signs)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-12'>4.12 Type F Signs (Route Marker Assemblies)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-13'>4.13 Milemarkers (Reference Location Signs)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-14'>4.14 Overlay Designs and Placement Details</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-15'>4.15 Supports for Types D, E and F Signs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-16'>4.16 Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-17'>4.17 Existing Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-18'>4.18 Proposed Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-19'>4.19 Three-Person Check</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-20'>4.20 Submittals</a>
collapse Title : 05 PAVEMENT MARKING AND DELINEATION PLANS ‎(21)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-01'>5.1 Introduction</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-02'>5.2 Plan Elements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-03'>5.3 Title Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-04'>5.4 Key Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-05'>5.5 Pavement Marking Schedule, Legend and Symbols Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-06'>5.6 Pavement Marking Details</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-07'>5.7 Pavement Marking Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-08'>5.8 Field Investigations</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-09'>5.9 Pavement Marking Design (Linework)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-10'>5.10 Pavement Marking Types</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-11'>5.11 Stop Bars (Lines)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-12'>5.12 Yield Bars (Lines)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-13'>5.13 Curb Ramps and Crosswalks</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-14'>5.14 Balloon Symbol Callouts</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-15'>5.15 Stationing</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-16'>5.16 Lane and Paved Shoulder Widths</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-17'>5.17 Raised Pavement Markers</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-18'>5.18 Delineators</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-19'>5.19 Object Markers</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-20'>5.20 Permanent Work Zone Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-21'>5.21 Submittals</a>
collapse Title : 06 REVISIONS ‎(5)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-01'>6.1 Revisions</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-02'>6.2 Time Frames</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-03'>6.3 Ground Mounted ‘S’ Dimension Field Verification</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-04'>6.4 Overhead ‘S’ Dimension And Slope Field Verification</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-05'>6.5 Correction Procedure For All Revisions</a>
  • 04 SIGNING PLANS

  • 4.15 Supports for Types D, E and F Signs

  • ​3-pound u-channel posts are used with Types D, E and F signs and are considered breakaway.  They can be erected as a single, double or triple post system.

    Single 3-lb U-channel requirements:

    • Sign panels or sign assemblies of less than 12sf
    • Sign panels 36 inches wide or less (including 36" diamond shape)

    Double 3-lb U-channel requirements:

    • Sign assemblies of 24sf or less
    • Two posts can be used less than 7' apart

    If sign assemblies require more than two u-channel supports, the supports shall be placed a minimum of 4 ft. between posts. No more than two posts shall fall within 7 ft. path, or the sign assembly must be placed behind barrier protection.

    Back-to-back U-channel posts are not considered breakaway and must be used behind guardrail.

    2-pound u-channel posts are used with milemarkers and are considered breakaway.

    Use with square tubing in accordance with manufacture specifications.

    Additional Resource

    NCDOT U-Channel Posts for Type D, E, and F signs (Link)

    Applicable Standard Specifications

    SECTION 903 GROUND MOUNTED SIGN SUPPORTS
    SECTION 904 SIGN ERECTION

    Applicable Standards Drawings

    904.50 MOUNTING OF TYPE 'D', 'E' AND 'F' SIGNS ON 'U' CHANNEL POSTS