collapse Title : 01 INTRODUCTION ‎(5)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-01'>1.1 Purpose</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-02'>1.2 How to Use the SDU Procedures Manual</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-03'>1.3 Definitions and Acronyms</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-04'>1.4 References</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-01-05'>1.5 Contacts</a>
collapse Title : 02 PRINCIPALS ‎(7)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-01'>2.1 Introduction </a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-02'>2.2 Purpose of Signing and Delineation</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-03'>2.3 Regulatory Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-04'>2.4 Warning Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-05'>2.5 Numbered Routes</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-06'>2.6 Sign Messaging</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-02-07'>2.7 Lane Continuity</a>
collapse Title : 03 PROJECT DELIVERY REQUIREMENTS ‎(9)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-01'>3.1 Introduction </a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-02'>3.2 PEF Prequalification Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-03'>3.3 Project Timeline</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-04'>3.4 Coordination Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-05'>3.5 Quality Control Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-06'>3.6 Submittal Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-07'>3.7 Division Design Projects and SDU Coordination</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-08'>3.8 SharePoint Application</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-03-09'>3.9 NCDOT eSignature Procedures</a>
collapse Title : 04 SIGNING PLANS ‎(20)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-01'>4.1 Introduction</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-02'>4.2 NCDOT Sign Types</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-03'>4.3 Plan Elements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-04'>4.4 Title Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-05'>4.5 Key Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-06'>4.6 Ground Mounted Support Design</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-07'>4.7 Overhead Sign Structure Drawings</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-08'>4.8 Sign Designs, General</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-09'>4.9 Type A and B Sign Panel Designs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-10'>4.10 Type D Panel Designs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-11'>4.11 Type E Signs (Regulatory and Warning Signs)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-12'>4.12 Type F Signs (Route Marker Assemblies)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-13'>4.13 Milemarkers (Reference Location Signs)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-14'>4.14 Overlay Designs and Placement Details</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-15'>4.15 Supports for Types D, E and F Signs</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-16'>4.16 Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-17'>4.17 Existing Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-18'>4.18 Proposed Signing Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-19'>4.19 Three-Person Check</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-04-20'>4.20 Submittals</a>
collapse Title : 05 PAVEMENT MARKING AND DELINEATION PLANS ‎(21)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-01'>5.1 Introduction</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-02'>5.2 Plan Elements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-03'>5.3 Title Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-04'>5.4 Key Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-05'>5.5 Pavement Marking Schedule, Legend and Symbols Sheet</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-06'>5.6 Pavement Marking Details</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-07'>5.7 Pavement Marking Plan Sheets</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-08'>5.8 Field Investigations</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-09'>5.9 Pavement Marking Design (Linework)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-10'>5.10 Pavement Marking Types</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-11'>5.11 Stop Bars (Lines)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-12'>5.12 Yield Bars (Lines)</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-13'>5.13 Curb Ramps and Crosswalks</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-14'>5.14 Balloon Symbol Callouts</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-15'>5.15 Stationing</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-16'>5.16 Lane and Paved Shoulder Widths</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-17'>5.17 Raised Pavement Markers</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-18'>5.18 Delineators</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-19'>5.19 Object Markers</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-20'>5.20 Permanent Work Zone Traffic Control Devices</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-05-21'>5.21 Submittals</a>
collapse Title : 06 REVISIONS ‎(5)
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-01'>6.1 Revisions</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-02'>6.2 Time Frames</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-03'>6.3 Ground Mounted ‘S’ Dimension Field Verification</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-04'>6.4 Overhead ‘S’ Dimension And Slope Field Verification</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/safety/Pages/Signing-and-Delineation-Unit-Procedures-Manual.aspx?Method=SDU-06-05'>6.5 Correction Procedure For All Revisions</a>
  • 05 PAVEMENT MARKING AND DELINEATION PLANS

  • 5.3 Title Sheet

  • ​The Title Sheet identifies the package of sheets as a set of Pavement Marking Plan.  It is used to provide the general project information as well as project specific details to reviewers, the contractor, inspector and future designers.

    (Include pavement marking schedule on title sheet for smaller, less complex projects)

    Title Sheet Elements

    • TIP Number
    • Contract Number
    • Vicinity Map – a general map that shows the Interstate, US, Primary and Secondary Routes in a large enough area to locate the project.  Required if there is no Roadway plan set. (Not required if paired with a signing plan set that includes a vicinity map)
    • County and Location information - description taken from the Roadway cover page
    • General Notes – a list of notes that can apply to all projects; the Engineer may add or modify notes to this list as necessary as they apply to the Pavement Marking Plan as a whole (included on Seed Files)
    • Project Notes –brief descriptions of work necessary to convey specific construction details to the contractor.  Project notes are used to expand upon the Construction Method subsection of the NCDOT SSRS (Standard Specifications for Roads and Structures) of a particular pay item note.  Project notes shall not be used to delete or modify any part of the SSRS.
    • Roadway Standard Drawings – a list of all applicable pavement marking-specific Roadway Standard Drawings shall be listed on the Title Sheet. 
    • Sheet Index – a list of Pavement Marking sheets by plan element type
    • Contact Information – a list of applicable contact information such as the Signing and Delineation Regional Engineer, Signing and Delineation Project Engineer, Design-Build Squad leader, Division Traffic Engineer, Regional Traffic Engineer.  If the Signing and Delineation Unit does not review the plans, they shall not be listed on the Title Sheet.
    • Firm Information – If prepared by a PEF, the Title Sheet shall contain the PEF name, address, NCBELS License number and main office number.  A non-colored logo may be included.

    Additional Resource

    Title Sheet Example and Description (Link)

Was this page helpful?