Spring Field Review Site 09B 2005Tyrrell, Washington, Add-on Long Cored Slab Bridge with Low Bent
~ Contractor survey error resulted in low bent.
 
 ~ Up to 4" of lightweight concrete overlay were used to build up to required grade.
Was this page helpful?