Spring Field Review Site 10 2005Washington, Bridge on US 64 over the Scuppernong River
 
~ Concrete footings were unusually large - appeared to be overdesigned.
~ Sidewalk cover plates had large gaps - a tripping hazard.
~ A Veterans memorial park is to be created adjacent to bridge.
~ Electrical wiring not in conduit was detailed in the plans.
 ~~ There were concerns over the long-term implication of not placing wiring in conduit. 
Pedestrian crossing was recently completed at this site. Many other unique items on this structure, which include concrete flowable fill, metallized pipe piles, and wick drains.