Structures Field Review Site 04 2010Brunswick, New location bridge on SR1105 (Middleton Ave.) over the intracoastal waterway to Oak Island
Bridge construction appeared to be in progress. (Heavy rain prevented a closer review of the site.) 
~ 5 span bridge incorporating splice prestressed girders over the Intercoastal Waterway and a 3 span cored slab bridge with a concrete overlay over Davis Canal.
 
 ~ Contractor had trouble placing the concrete overlay on Davis Canal and the anchor bolts and nuts are showing rust on the rail.
 
 ~ Some of the girder segments were recast due to cold joints.