Structures Field Review Site 08 2010Pamlico, Replacement bridges #24, #31, #35, #40, #42, and #44 on NC 304
~ Construction proceeded smoothly.
 
 ~ Discussed introducing a saw cut in the asphalt overlay over the bents in an effort to minimize the reflective cracking
~ 6 Bridges using all precast components.