Sign In
  
  
  
  
  
  
  
  
Misc1.pdf
  
AWARD LIMITS2006 SpecificationsGeneralMunicipal
MISC2.pdf
  
LISTING DBE SUBCONTRACTORS (Federal Aid Projects)2006 SpecificationsGeneralMunicipal
Misc3.pdf
  
LISTING MBE/WBE SUBCONTRACTORS (State Funded Projects)2006 SpecificationsGeneralMunicipal
Misc4.pdf
  
EXECUTION OF BID, NON-COLLUSION, DEBARMENT & GIFT BAN CERTIFICATIONApr 112006 SpecificationsGeneralMunicipal
MISC5.pdf
  
BID BONDSApr 112006 SpecificationsGeneralMunicipal
MISC6M.aspx
  
MUNICIPAL-PAYMENT/PERFORMANCE BONDS2006 SpecificationsMunicipal
Misc7.pdf
  
EXECUTION OF CONTRACT SIGNATURE SHEET (example only)Jun 102006 SpecificationsGeneralMunicipal
R10R13.pdf
  
VOLUMETRIC CONCRETE SPECMay 10Roadway ProvisionsMunicipal
s1e.pdf
  
SEED MIX EAST2006 SpecificationsGeneralMunicipal
s2.pdf
  
SEED MIX EAST CRIMP2006 SpecificationsGeneralMunicipal
s2A.pdf
  
SEED MIX DIV 3 CRIMP2006 SpecificationsGeneralMunicipal
s3.pdf
  
SEED MIX WESTFeb 102006 SpecificationsGeneralMunicipal
s4.pdf
  
SEED MIX West EDFeb 102006 SpecificationsGeneralMunicipal
s5.pdf
  
SEED MIX WEST CRIMPFeb 102006 SpecificationsGeneralMunicipal
SP10R01.pdf
  
HIGH STRENGTH CONCRETE FOR DRIVEWAYSRoadway ProvisionsGeneralMunicipal
SP10R02.pdf
  
GALVANIZED HIGH STRENGTH BOLTS, NUTS, AND WASHERSRoadway ProvisionsGeneralMunicipal
SP10R03.pdf
  
GALVANIZINGAug 10Roadway ProvisionsGeneralMunicipal
SP10R05.pdf
  
AGGREGATE PRODUCTIONRoadway ProvisionsGeneralMunicipal
SP10R10.pdf
  
CONCRETE BRICK AND BLOCK PRODUCTIONRoadway ProvisionsGeneralMunicipal
SP10R16.pdf
  
PORTLAND CEMENT CONCRETE (Alkali-Silica Reaction)Roadway ProvisionsGeneralMunicipal
SP10R17.pdf
  
WATER FOR CONCRETEOct 10Roadway ProvisionsGeneralMunicipal
SP10R32.pdf
  
CULVERT PIPEJan 10Roadway ProvisionsGeneralMunicipal
SP10R35.pdf
  
GLASS BEADS (Use on projects w/Pavement Markings)Oct 10Roadway ProvisionsGeneralMunicipal
SP10R40.pdf
  
ENGINEERING FABRICS (Projects w/Fabric)Oct 10Roadway ProvisionsGeneralMunicipal
SP10R42.pdf
  
PRECAST DRAINAGE STRUCTURES-MACRO-SYNTHETIC FIBERSRoadway ProvisionsGeneralMunicipal
SP10R43.pdf
  
QUALIFICATION OF WELDS AND PROCEDURESRoadway ProvisionsGeneralMunicipal
SP10R45.pdf
  
PAINT SAMPLING AND TESTINGRoadway ProvisionsGeneralMunicipal
SP10R50.pdf
  
TEMPORARY PORTABLE CONCRETE BARRIERRoadway ProvisionsGeneralMunicipal
SP10R60.pdf
  
CHANNELIZING DEVICESJuly 10Roadway ProvisionsGeneralMunicipal
SP11R02.pdf
  
TEMPORARY SHORINGRoadway ProvisionsGeneralMunicipal
SP11R11.pdf
  
CHANGEABLE MESSAGE SIGNSRoadway ProvisionsGeneralMunicipal
SP11R20.pdf
  
WORK ZONE TRAFFIC CONTROLAug 11Roadway ProvisionsGeneralMunicipal
SP14R01.pdf
  
COORDINATION OF LIGHTING WORK (Existing & New)Roadway ProvisionsGeneralMunicipal
SP15R01.pdf
  
EXCAVATION, TRENCHING, PIPE LAYING, AND BACKFILLING FOR UTILITIESRoadway ProvisionsGeneralMunicipal
SP16R01.pdf
  
PERMANENT SEEDING AND MULCHING (incentive payment)Roadway ProvisionsGeneralMunicipal
SP16R02.pdf
  
EROSION AND STORMWATER CONTROL FOR SHOULDER CONSTRUCTION AND RECONSTRUCTIONNov 10Roadway ProvisionsGeneral
SP1G03.pdf02
  
NOTICE TO BIDDERS  (Cluster Projects Only)General ProvisionsGeneralMunicipal
SP1G03A.pdf03
  
NOTICE TO BIDDERS  (Cluster Projects Only) A - (2 Projects)General ProvisionsGeneralMunicipal
SP1G03B.pdf04
  
NOTICE TO BIDDERS  (Cluster Projects Only) B - (3 Projects)General ProvisionsGeneralMunicipal
SP1G04.pdf05
  
CONTRACT TIME AND LIQUIDATED DAMAGES Date of availability ______________________ Completion date _________________________ Liquidated damages $________________General ProvisionsGeneralMunicipal
SP1G05.pdf06
  
CONTRACT TIME AND LIQUIDATED DAMAGES - (Floating Dates of Availability) Date not before ________________or later than____________________ Completion date _________________________ Liquidated damages $________________ A - (Permits)    B - (No Permits)General ProvisionsGeneralMunicipal
SP1G05a.pdf07
  
CONTRACT TIME AND LIQUIDATED DAMAGES - (Floating Dates of Availability) Date not before ________________or later than____________________ Completion date _________________________ Liquidated damages $________________ A - (Permits)General ProvisionsGeneralMunicipal
SP1G05b.pdf08
  
CONTRACT TIME AND LIQUIDATED DAMAGES - (Floating Dates of Availability) Date not before ________________or later than____________________ Completion date _________________________ Liquidated damages $_______________ B - (No Permits)General ProvisionsGeneralMunicipal
SP1G07a.pdf09
  
CONTRACT TIME AND LIQUIDATED DAMAGES - Permits & ICT for Reforestation Date of availability ___________ Completion date ____________Liquidated damages are already set for $200 dollars in the provision A  General ProvisionsGeneralMunicipal
SP1G07b.pdf10
  
CONTRACT TIME AND LIQUIDATED DAMAGES - Permits & ICT for Reforestation Date of availability _______________ Completion date ________________Liquidated damages are already set for $200 dollars in the provision B  - (Floating dates of availability)General ProvisionsGeneralMunicipal
SP1G086.pdf
  
REQUIRED CONTRACT PROVISIONS FOR ARRAGeneral ProvisionsGeneral
SP1G10.pdf
  
CONTRACT TIME AND LIQUIDATED DAMAGES -NO permits Date of availability _______________ Completion date __________________ Liquidated damages $________________ General ProvisionsGeneralMunicipal
SP1G100.pdf
  
U.S. DEPARTMENT OF TRANSPORTATION HOTLINE (F.A. Only)General ProvisionsGeneralMunicipal
SP1G103.pdf
  
SUBMISSION OF RECORDS - FEDERAL-AID PROJECTS (BRZ Projects only)General ProvisionsGeneralMunicipal
SP1G112.pdf
  
SUBSURFACE INFORMATION (Is not available)General ProvisionsGeneralNot Muni
SP1G112A.pdf
  
SUBSURFACE INFORMATIONGeneral ProvisionsMunicipal
SP1G112B.pdf
  
SUBSURFACE INFORMATION (Roadway only)General ProvisionsMunicipal
SP1G112C.pdf
  
SUBSURFACE INFORMATION (Structures only)General ProvisionsMunicipal
SP1G112D.pdf
  
SUBSURFACE INFORMATION (Roadway & Structures)General ProvisionsMunicipal
SP1G113.pdf
  
DIGITAL TERRAIN MODEL (DTM) FILESJun 11General ProvisionsGeneralMunicipal
SP1G115.pdf
  
SUBSURFACE INFORMATION (Roadway only)General ProvisionsGeneral
SP1G118.pdf
  
SUBSURFACE INFORMATION (Structures only)General ProvisionsGeneral
SP1G119.pdf
  
SUBSURFACE INFORMATION (Roadway & Structures)General ProvisionsGeneral
SP1G121.pdf
  
PAYMENTS FOR MATERIALS - PORTABLE CONCRETE BARRIERAug 11General ProvisionsGeneralMunicipal
SP1G124.pdf
  
PAYMENTS FOR MATERIALS - REMOVABLE PAVEMENT MARKING MATERIALAug 11General ProvisionsGeneralMunicipal
SP1G125.pdf
  
MAINTENANCE OF THE PROJECT - All ProjectsGeneral ProvisionsGeneralMunicipal
SP1G133.pdf
  
COOPERATION BETWEEN CONTRACTORSGeneral ProvisionsGeneralMunicipal
SP1G13B.pdf11
  
INTERMEDIATE CONTRACT TIME #1 AND LIQUIDATED DAMAGES Date of availability ______________ All work, except Reforestation completed by _________________Liquidated damages ___________ B - (Floating dates of availability)General ProvisionsGeneralMunicipal
SP1G140.pdf
  
CONTRACTOR CLAIM SUBMITTAL FORMGeneral ProvisionsGeneralMunicipal
SP1G142.pdf
  
BID DOCUMENTATIONOct 10General ProvisionsGeneralMunicipal
SP1G145.pdf
  
TWELVE MONTH GUARANTEE - TIP Projects ONLYGeneral ProvisionsGeneralMunicipal
SP1G14A.pdf
  
COMBINED ICT --- INTERMEDIATE CONTRACT TIMESGeneral ProvisionsGeneralMunicipal
SP1G14B.pdf
  
HOLIDAY LANE CLOSURE --- INTERMEDIATE CONTRACT TIMESGeneral ProvisionsGeneralMunicipal
SP1G14C.pdf
  
LANE CLOSURE TIME RESTRICTIONGeneral ProvisionsGeneralMunicipal
SP1G14D.pdf
  
ROAD CLOSURE HOUR --- INTERMEDIATE CONTRACT TIMESGeneral ProvisionsGeneralMunicipal
SP1G14E.pdf
  
ROAD CLOSURE MINUTE --- INTERMEDIATE CONTRACT TIMESGeneral ProvisionsGeneralMunicipal
SP1G14F.pdf
  
FROM_TO ICT --- INTERMEDIATE CONTRACT TIMESGeneral ProvisionsGeneralMunicipal
SP1G14G.pdf
  
CONSECUTIVE HOURS ICT --- INTERMEDIATE CONTRACT TIMESGeneral ProvisionsGeneralMunicipal
SP1G14H.pdf
  
CONSECUTIVE DAYS ICT --- INTERMEDIATE CONTRACT TIMESGeneral ProvisionsGeneralMunicipal
SP1G150.pdf
  
OUTSOURCING OUTSIDE THE USA (State Funded Projects only)General ProvisionsGeneralMunicipal
SP1G151.pdf
  
LEGAL RELATIONS AND RESPONSIBILITYMar 10General ProvisionsGeneralMunicipal
SP1G152.pdf
  
GIFTS BY VENDORS AND CONTRACTORSGeneral ProvisionsGeneralMunicipal
SP1G16.pdf
  
PERMANENT VEGETATION ESTABLISHMENTFeb 12General ProvisionsGeneral
SP1G180.pdf
  
EROSION & SEDIMENT CONTROL STORMWATER CERTIFICATION (without LDs)Nov 10General ProvisionsGeneralMunicipal
SP1G181.pdf
  
PROCEDURE FOR MONITORING BORROW PIT DISCHARGEGeneral ProvisionsGeneralMunicipal
SP1G184.pdf
  
EMPLOYMENTNov 11General ProvisionsGeneralMunicipal
SP1G185.pdf
  
PAYOUT SCHEDULEJan 10General ProvisionsGeneralMunicipal
SP1G22A.pdf
  
DELAY IN RIGHT OF ENTRYGeneral ProvisionsGeneralMunicipal
SP1G22B.pdf
  
DELAY IN RIGHT OF ENTRY (MULTIPLE DATES)General ProvisionsGeneralMunicipal
SP1G28.pdf
  
MAJOR CONTRACT ITEMSGeneral ProvisionsGeneralMunicipal
SP1G31.pdf
  
NO MAJOR CONTRACT ITEMSGeneral ProvisionsGeneralMunicipal
SP1G34.pdf
  
NO SPECIALITY ITEMSGeneral ProvisionsGeneralMunicipal
SP1G37.pdf
  
SPECIALITY ITEMSGeneral ProvisionsGeneralMunicipal
SP1G40.pdf
  
SPECIAL REQUIREMENTS FOR WORK IN NATIONAL FORESTGeneral ProvisionsGeneralMunicipal
SP1G43.pdf
  
FUEL PRICE ADJUSTMENTAug 11General ProvisionsGeneralMunicipal
SP1G49.pdf
  
PARTNERINGGeneral ProvisionsGeneral
SP1G58.pdf
  
SCHEDULE OF ESTIMATED COMPLETION PROGRESSGeneral ProvisionsGeneralMunicipal
SP1G59.pdf
  
REVISION TO FHWA 1273General ProvisionsGeneralMunicipal
SP1G61.pdf
  
DISADVANTAGE BUSINESS ENTERPRISENov 11General ProvisionsGeneral
SP1G62.pdf
  
DISADVANTAGED BUSINESS ENTERPRISES (MUNICIPALITIES-FEDERAL AID)General ProvisionsMunicipal
SP1G67.pdf
  
MINORITY AND WOMEN BUSINESSESNov 11General ProvisionsGeneral
SP1G70.pdf
  
PROGRESS SCHEDULE - All ProjectsGeneral ProvisionsGeneralMunicipal
SP1G75.pdf
  
MENTOR-PROTÉGÉ PROGRAM   (When requested by the Proposals and Contract Engineer)General ProvisionsGeneral
SP1G80.pdf
  
LIABILITY INSURANCE (ALL RALEIGH-LET AND POC'S)General ProvisionsGeneralMunicipal
SP1G85.pdf
  
CERTIFICATION FOR FEDERAL-AID CONTRACTS (F.A. Only)General ProvisionsGeneralMunicipal
SP1G88.pdf
  
CONTRACTOR'S LICENSES REQUIREMENTSGeneral ProvisionsGeneralMunicipal
SP1G91.pdf
  
SUBMISSION OF BIDS - Alternates (Use with SP3R36)General ProvisionsGeneralMunicipal
SP1G97.pdf
  
DOMESTIC STEEL AND IRON PRODUCTS (BUY AMERICA)July 10General ProvisionsMunicipal
SP1R01.pdf
  
PROJECT SPECIAL PROVISONS - Roadway (Heading only)Roadway ProvisionsGeneralMunicipal
SP2R01.pdf
  
CLEARING AND GRUBBING - Method "II"Roadway ProvisionsGeneralMunicipal
SP2R02.pdf
  
CLEARING AND GRUBBING - Method "III"Roadway ProvisionsGeneralMunicipal
SP2R05.pdf
  
BURNING RESTRICTIONSRoadway ProvisionsGeneralMunicipal
SP2R10.pdf
  
DEMOLITION OF BUILDINGS AND APPURTENANCESMay 11Roadway ProvisionsGeneralMunicipal
SP2R15A.pdf
  
BUILDING AND UNDERGROUND STORAGE TANK REMOVALMay 11Roadway ProvisionsGeneralMunicipal
SP2R15B.pdf
  
BUILDING AND UNDERGROUND STORAGE TANK REMOVALMay 11Roadway ProvisionsGeneralMunicipal
SP2R15C.pdf
  
BUILDING AND UNDERGROUND STORAGE TANK REMOVALMay 11Roadway ProvisionsGeneralMunicipal
SP2R15D.pdf
  
BUILDING AND UNDERGROUND STORAGE TANK REMOVALMay 11Roadway ProvisionsGeneralMunicipal
SP2R16.pdf
  
LUMP SUM GRADING (Separate Pay Items)Aug 10Roadway ProvisionsGeneralMunicipal
SP2R18.pdf
  
EMBANKMENTSOct 10Roadway ProvisionsGeneralMunicipal
SP2R30A.pdf
  
TEMPORARY DETOURS (Onsite detours)Roadway ProvisionsGeneralMunicipal
SP2R30B.pdf
  
TEMPORARY DETOURS (Onsite detours with lump sum grading)Roadway ProvisionsGeneralMunicipal
SP2R35.pdf
  
AGGREGATE SUBGRADEMar 10Roadway ProvisionsGeneralMunicipal
SP2R40.pdf
  
FALSE SUMPS (Need plan detail)Roadway ProvisionsGeneralMunicipal
SP2R45A.pdf
  
SHOULDER AND FILL SLOPE MATERIAL  A -(With lump sum grading)Roadway ProvisionsGeneralMunicipal
SP2R45B.pdf
  
SHOULDER AND FILL SLOPE MATERIAL  B -(With lump sum grading and borrow excavation)Roadway ProvisionsGeneralMunicipal
SP2R45C.pdf
  
SHOULDER AND FILL SLOPE MATERIAL C -(No lump sum grading)Roadway ProvisionsGeneralMunicipal
SP2R57.pdf
  
BORROW EXCAVATION (TRUCK MEASURMENT)Roadway ProvisionsGeneralMunicipal
SP2R58.pdf
  
BORROW EXCAVATION (IN PLACE OR TRUCK MEASURMENT)Roadway ProvisionsGeneralMunicipal
SP2R65.pdf
  
RESTRICTIONS ON CONSTRUCTION OF EMBANKMENTSRoadway ProvisionsGeneralMunicipal
SP2R70.pdf
  
COAL FLY ASH IN EMBANKMENTSRoadway ProvisionsGeneral
SP2R75.pdf
  
EMBANKMENT MONITORINGRoadway ProvisionsGeneralMunicipal
SP2R80.pdf
  
SELECT GRANULAR MATERIALMar 10Roadway ProvisionsGeneralMunicipal
SP2R85.pdf
  
ROCK PLATINGOct 10Roadway ProvisionsGeneralMunicipal
SP3R01.pdf
  
REINFORCED CONCRETE TAPERED INLETRoadway ProvisionsGeneralMunicipal
SP3R05.pdf
  
SADDLE BRANCH CONNECTORRoadway ProvisionsGeneral
SP3R10.pdf
  
C.S.SLOTTED DRAINRoadway ProvisionsGeneral
SP3R15.pdf
  
15" R. C. PIPE TEE DROP INLETRoadway ProvisionsGeneral
SP3R20.pdf
  
SEEPSRoadway ProvisionsGeneral
SP3R25.pdf
  
WELDED STEEL PIPERoadway ProvisionsGeneralMunicipal
SP3R30.pdf
  
FLOWABLE FILLRoadway ProvisionsGeneralMunicipal
SP3R36.pdf
  
PIPE ALTERNATES (Use with SP1G91)Roadway ProvisionsGeneralMunicipal
SP3R37.pdf
  
DRAINAGE PIPEMar 10Roadway ProvisionsGeneralMunicipal
SP3R40B.pdf
  
PIPE INSTALLATION AND PIPE CULVERTJan 11Roadway ProvisionsGeneralMunicipal
SP4R01.pdf
  
BRIDGE APPROACH FILLSOct 10Roadway ProvisionsGeneralMunicipal
SP5R01.pdf
  
FINE GRADING SUBGRADE, SHOULDERS AND DITCHESRoadway ProvisionsGeneralMunicipal
SP5R03.pdf
  
AGGREGATE BASE COURSERoadway ProvisionsGeneralMunicipal
SP5R05.pdf
  
PREPARATION OF SUBGRADE AND BASE (Use with SP6R45)Roadway ProvisionsGeneralMunicipal
SP5R15.pdf
  
AGGREGATE FOR SOIL-CEMENT BASERoadway ProvisionsGeneralMunicipal
SP6R01.pdf
  
ASPHALT PAVEMENTS SUPERPAVE<>Oct 11Roadway ProvisionsGeneralMunicipal
SP6R02A.pdf
  
ASPHALT PAVEMENTS-WARM MIX ASPHALT (At the Contractor's Option)<><>Feb 11Roadway ProvisionsGeneralMunicipal
SP6R02B.pdf
  
ASPHALT PAVEMENTS-WARM MIX ASPHALT (Required)<><>Feb 11Roadway ProvisionsGeneralMunicipal
SP6R06.pdf
  
ASPHALT PAVER - FIXED STRING LINERoadway ProvisionsGeneral
SP6R06A.pdf
  
ASPHALT PAVER - FIXED STRING LINEFeb 11Roadway ProvisionsMunicipal
SP6R06B.pdf
  
ASPHALT PAVER - FIXED AND MOBILE STRING LINERoadway ProvisionsMunicipal
SP6R07.pdf
  
ASPHALT PAVER - FIXED AND MOBILE STRING LINERoadway ProvisionsGeneral
SP6R15.pdf
  
ASPHALT BINDER CONTENT OF ASPHALT PLANT MIXESJuly 11Roadway ProvisionsGeneralMunicipal
SP6R20.pdf
  
ASPHALT PLANT MIXTURESRoadway ProvisionsGeneralMunicipal
SP6R25.pdf
  
PRICE ADJUSTMENT - ASPHALT BINDER FOR PLANT MIXRoadway ProvisionsGeneralMunicipal
SP6R45.pdf
  
FINAL SURFACE TESTING - ASPHALT PAVEMENTS RIDEABILITY (use with SP5R05)Roadway ProvisionsGeneralMunicipal
SP6R50.pdf
  
SEALING EXISTING PAVEMENT CRACKSRoadway ProvisionsGeneralMunicipal
SP7R05.pdf
  
TYING PROPOSED CONCRETE PVMT. TO EXISTING CONCRETE PVMT.Roadway ProvisionsGeneralMunicipal
SP7R10.pdf
  
TYING PROPOSED CONCRETE PVMT. TO PROPOSED ASPHALT PVMT.Roadway ProvisionsGeneralMunicipal
1 - 157Next