• 03 PROJECT DELIVERY REQUIREMENTS

  • 3.7 Division Design Projects and SDU Coordination

  • ​Some Division Design TIP projects will require Signing and Delineation review and/or coordination.  The level and type of coordination is based upon several factors such as the location (i.e. interstate projects or freeways), complexity of the project (i.e. CFIs or multi-lane roundabouts), or design elements (overhead structures).  Refer to the NCDOT Division Design Projects Signing and Delineation Unit Coordination Requirements for more details (Link).

Was this page helpful?