collapse Title : 01 INTRODUCTION ‎(5)
collapse Title : 02 PRINCIPALS ‎(7)
collapse Title : 03 PROJECT DELIVERY REQUIREMENTS ‎(9)
collapse Title : 04 SIGNING PLANS ‎(20)
collapse Title : 05 PAVEMENT MARKING AND DELINEATION PLANS ‎(21)
collapse Title : 06 REVISIONS ‎(5)
  • 06 REVISIONS

  • 6.4 Overhead ‘S’ Dimension And Slope Field Verification

  • ​Overhead structural line drawing 'S' dimensions are verified on every project. Follow the correction procedure outlined below.  If there are no changes made on the Overheads, the sheets must still be sent out with a note on the plan sheet saying, “FIELD VERIFIED" without using the word “REVISED". Follow link to Determination of "S" Dimensions