Sign In
  
  
  
  
  
  
  
  
  
  
02000201.tif
  
022002EarthworkMethod of Clearing - Method IIEnglish
02000301.tif
  
022002EarthworkMethod of Clearing - Method IIIEnglish
02250101.tif
  
022002EarthworkGuide for Grading Subgrade - Interstate and FreewayEnglish
02250201.tif
  
022002EarthworkGuide for Grading Subgrade - Secondary and LocalEnglish
02250301.tif
  
022002EarthworkDeceleration and Acceleration Lanes - Sheet 1 of 6English
02250302.tif
  
022002EarthworkDeceleration and Acceleration Lanes - Sheet 2 of 6English
02250303.tif
  
022002EarthworkDeceleration and Acceleration Lanes - Sheet 3 of 6English
02250304.tif
  
022002EarthworkDeceleration and Acceleration Lanes - Sheet 4 of 6English
02250305.tif
  
022002EarthworkDeceleration and Acceleration Lanes - Sheet 5 of 6English
02250306.tif
  
022002EarthworkDeceleration and Acceleration Lanes - Sheet 6 of 6English
02250401.tif
  
022002EarthworkMethod of Obtaining Superelevation - Two Lane PavementEnglish
02250501.tif
  
022002EarthworkMethod of Obtaining Superelevation - Divided HighwaysEnglish
02250601.tif
  
022002EarthworkMethod of Grading Sight Distance at IntersectionsEnglish
02250701.tif
  
022002EarthworkGrading for False Cut at Grade SeparationsEnglish
02250801.tif
  
022002EarthworkEarth Berm Median Pier Protection - Sheet 1 of 2English
02250802.tif
  
022002EarthworkEarth Berm Median Pier Protection - Sheet 2 of 2English
02250901.tif
  
022002EarthworkGuide for Shoulder and Ditch Transition at Grade SeparationsEnglish
0225d01.tif
  
2002Guide for Grading Subgrade - Interstate and Freeway - Sheet 1 of 1DetailIndividual Detail Sheets for viewing and printing (Do Not Insert these sheets into the Roadway Plans).225D01 - Guide for Grading Subgrade - Interstate and Freeway  (August 2003 Letting)
0225d0101.tif
  
2002225D01 - Guide for Grading Subgrade - Interstate and Freeway  (August 2003 Letting)  -  Guide for Grading Subgrade - Interstate and Freeway - Sheet 1 of 2DetailFor Insertion into the Roadway Plans (34" x 22" plan sheets) - If any part of the "Detail Drawings" are required insert ALL drawings in the Roadway Plans. DO NOT cross-out any drawings in the set.225D01 - Guide for Grading Subgrade - Interstate and Freeway  (August 2003 Letting)
02400101.tif
  
022002EarthworkGuide for Berm Ditch ConstructionEnglish
03000101.tif
  
032002Pipe CulvertsMethod of Pipe Installation - Method `A'English
03000201.tif
  
032002Pipe CulvertsMethod of Pipe Installation - Method `B'English
03000301.tif
  
032002Pipe CulvertsMethod of Structural Plate Pipe and Pipe Arch Installation - Method `A'English
03000401.tif
  
032002Pipe CulvertsMethod of Structural Plate Pipe and Pipe Arch Installation - Method `B'English
03100201.tif
  
032002Pipe CulvertsParallel Pipe End Section - Precast Concrete Section for 15" to 24" PipeEnglish
03100301.tif
  
032002Pipe CulvertsCross Pipe End Section - Precast Concrete Section for 18" to 30" PipeEnglish
03100401.tif
  
032002Pipe CulvertsParallel Pipe End Section - Prefabricated Steel Section for 15" to 24" PipeEnglish
03100501.tif
  
032002Pipe CulvertsCross Pipe End Section - Prefabricated Steel Section for 18" to 30" PipeEnglish
03101001.tif
  
032002Pipe CulvertsDriveway Pipe ConstructionEnglish
04221001.tif
  
042002Major StructuresReinforced Bridge Approach Fills - Sheet 1 of 4English
1 - 30Next