expand Division : 00 FORWARD ‎(1)
expand Division : 01 GENERAL REQUIREMENTS ‎(10)
expand Division : 02 EARTHWORK ‎(15)
expand Division : 03 PIPE CULVERTS ‎(6)
expand Division : 04 MAJOR STRUCTURES ‎(18)
expand Division : 05 SUBGRADE, BASES AND SHOULDERS ‎(11)
expand Division : 06 ASPHALT PAVEMENTS ‎(14)
expand Division : 07 CONCRETE PAVEMENTS AND SHOULDERS ‎(4)
expand Division : 08 INCIDENTALS ‎(32)
expand Division : 09 SIGNING ‎(6)
expand Division : 10 MATERIALS ‎(50)
expand Division : 11 WORK ZONE TRAFFIC CONTROL ‎(13)
expand Division : 12 PAVEMENT MARKINGS, MARKERS AND DELINEATION ‎(7)
expand Division : 14 LIGHTING ‎(13)
expand Division : 15 UTILITY CONSTRUCTION ‎(9)
expand Division : 16 EROSION CONTROL AND ROADSIDE DEVELOPMENT ‎(27)
expand Division : 17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS ‎(28)
No content found

 ‭(Hidden)‬ 2012 Standard Specifications

 ‭(Hidden)‬ Resources

No content found

 2012 Specifications Manual

 

 

10 MATERIALS1017948310/27/2015 3:26:45 PMIt requires aggregate producers to perform quality control sampling, testing and record keeping on aggregates they ship for use by the Department The program is described in the https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1006 AGGREGATE QUALITY CONTROL/QUALITY ASSURANCEFiller, Alfred L;service-spsnapmgr
10 MATERIALS1017948410/29/2015 7:14:12 PMContents 1010-1 - AGGREGATE BASE COURSE 1. General Requirements 2. Sampling and Acceptance Sources will not be approved unless https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1010 AGGREGATE FOR NON-ASPHALT TYPE BASESFiller, Alfred L
10 MATERIALS1017948610/29/2015 8:08:35 PMContents 1014-1 - FINE AGGREGATE 1. General 2. Soundness 3. Deleterious Substances 4 https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1014 AGGREGATE FOR PORTLAND CEMENT CONCRETEFiller, Alfred L
10 MATERIALS1017948710/29/2015 8:26:57 PMContents 1016-1 - DESCRIPTION 1016-2 - USES 1016-3 - CLASSIFICATIONS CLASS I CLASS II https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1016 SELECT MATERIALSFiller, Alfred L
10 MATERIALS1017948910/27/2015 6:52:15 PMContents 1019-1 - GENERAL 1019-2 - SHOULDER AND SLOPE BORROW 1019-3 - AGGREGATE SHOULDER BORROW Material that contains roots, root mats, stumps or other https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1019 SHOULDER AND SLOPE MATERIAL Filler, Alfred L;service-spsnapmgr
10 MATERIALS1017949010/30/2015 2:47:17 PMContents 1020-1 - DELIVERY AND ACCEPTANCE OF ASPHALT MATERIALS 1020-2 - ASPHALT BINDER 1020-3 - ASPHALT EMULSION https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1020 ASPHALT MATERIALSFiller, Alfred L
16 EROSION CONTROL AND ROADSIDE DEVELOPMENT1017949510/19/2015 8:08:23 PMContents 1605-1 - DESCRIPTION 1605-2 - MATERIALS 1. Posts 2. Woven Wire Fence https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1605 TEMPORARY SILT FENCEFiller, Alfred L
16 EROSION CONTROL AND ROADSIDE DEVELOPMENT1017949810/19/2015 7:46:28 PMThe work includes, but is not limited to, furnishing, weighing, stockpiling, re-handling, placing and maintaining stone; and disposal of any stone not incorporated into the https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1610 STONE FOR EROSION CONTROLFiller, Alfred L
09 SIGNING1017950611/2/2015 3:54:48 PM[top of page ] 902 -2 MATERIALS Refer to Division 10 Item Section Joint Sealer 1028-2 Organic https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 902 FOUNDATIONS FOR GROUND MOUNTED SIGNSFiller, Alfred L
09 SIGNING1017950811/2/2015 4:48:14 PMContents 904-1 - DESCRIPTION 904-2 - MATERIALS 904-3 - CONSTRUCTION METHODS 1. General 2. Type A , B and C 3. Type D https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 904 SIGN ERECTIONFiller, Alfred L

 Related Documents

 

 

Roadway Design Manual Rewrite Release 11-1-2021635893511/1/2021 3:00:57 PM11/1/2021 3:00:57 PM STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION ROADWAY DESIGN UNIT 1582 STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx710https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/Roadway{A61E9C74-0638-46E6-A3CC-ABDAFF437D82}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
SUBMITTAL TRACKING (Form ST-1)125337176/25/2015 3:04:26 PM6/25/2015 3:04:26 PMTHIS SUBMITTAL HAS A TURNAROUND TIME OF _______ DAYS IN ORDER TO MEET THIS DEADLINE, THE RESIDENT ENGINEER MUST RECEIVE THE REVIEWED SUBMITTAL BY STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/ConstManRefDocs/Forms/AllItems.aspx000https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{A40E7CD9-56C7-442A-B1B7-102045D66344}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Wage Interview Form Spanish125337574/27/2015 5:52:06 PM4/27/2015 5:52:06 PMUsted autorizo o está de acuerdo con esta lista de deducciones Have you authorized or are you in agreement with the deductions listed?) Mi empleador tiene permison para STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/ConstManRefDocs/Forms/AllItems.aspx100https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{7B7BCD13-FC5E-4BB0-8A26-E0F1F28A5A8E}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Wage Interview Form125337604/27/2015 5:51:24 PM4/27/2015 5:51:24 PMAre taxes deducted from your pay Do you work more than 40 hours per week Do you receive over-time pay for working more than 40 hours How many hours did you work last week STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/ConstManRefDocs/Forms/AllItems.aspx100https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{48CC8F8E-83FB-4E36-ADB2-DA0AF21045B2}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Construction Cost Estimate Form202992159/14/2023 4:23:13 PM9/14/2023 4:23:13 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx6540https://connect.ncdot.govaspxFalseaspxhttps://connect.ncdot.gov/projects/Roadway{9E269871-7ED1-49EB-B4A1-74604E75CCF5}SharePoint.Link~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js00
Asphalt Plant Scale Verification125295929/21/2015 8:55:15 PM9/21/2015 8:55:15 PMPlant Scale Verification.xls STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx110https://connect.ncdot.govzipFalseziphttps://connect.ncdot.gov/projects/construction{F8960A3A-4621-4520-8194-AF4CE66D0E8A}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js1717
Federal Hwy Admin 1022 Form1252959910/14/2010 3:25:58 PM10/14/2010 3:25:58 PMU.S. Department of Transportation Federal Highway Administration NOTICE The highway construction underway at this location is a Federal or Federal-aid project and is subject to STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{C6A60BA8-EE0B-4113-BB7B-EE54B323B63D}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Form 253 Daily Report Portland Cement Concrete Pavement125296013/1/2007 7:04:43 PM3/1/2007 7:04:43 PMNORTH CAROLINA DEPARTMENT OF TRANSPORTATION DAILY REPORT ON PORTLAND CEMENT CONCRETE PAVEMENT ROADWAY INSPECTOR’S REPORT CONTRACT NO.: COUNTY: DATE: WEATHER: TEMPERATURE– HIGH STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{6E8FA9A7-A331-491F-813E-4E5B343CD0B9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Guideline for Unloading, Handling, and Stockpiling Reinforced Concrete Pipe (RCP)125296055/16/2019 6:38:46 PM5/16/2019 6:38:46 PMUnloading of pipe should be coordinated with the construction schedule and installation sequence to avoid re-handling and unnecessary equipment movement If a pipe is damaged during STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{C78EB404-4CF8-4FC3-BE4C-B575AA69ED7A}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
HiCAMs and DOH Vendor Release Notes V8.6.4 4310515/24/2021 6:39:03 PM5/24/2021 6:39:03 PMApplication Modifications and Enhancements HiCAMS & DOH Vendor Version 8.6.4 were released Friday, 05/21/2021. OVERVIEW OF THE RELEASE • Application enhancements in various STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/HiCams/Forms/AllItems.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{26FB2029-6712-4695-8CEE-0108939FBD72}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?