expand Division : 00 FORWARD ‎(1)
expand Division : 01 GENERAL REQUIREMENTS ‎(10)
expand Division : 02 EARTHWORK ‎(15)
expand Division : 03 PIPE CULVERTS ‎(6)
expand Division : 04 MAJOR STRUCTURES ‎(18)
expand Division : 05 SUBGRADE, BASES AND SHOULDERS ‎(11)
expand Division : 06 ASPHALT PAVEMENTS ‎(14)
expand Division : 07 CONCRETE PAVEMENTS AND SHOULDERS ‎(4)
expand Division : 08 INCIDENTALS ‎(32)
expand Division : 09 SIGNING ‎(6)
expand Division : 10 MATERIALS ‎(50)
expand Division : 11 WORK ZONE TRAFFIC CONTROL ‎(13)
expand Division : 12 PAVEMENT MARKINGS, MARKERS AND DELINEATION ‎(7)
expand Division : 14 LIGHTING ‎(13)
expand Division : 15 UTILITY CONSTRUCTION ‎(9)
expand Division : 16 EROSION CONTROL AND ROADSIDE DEVELOPMENT ‎(27)
expand Division : 17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS ‎(28)
No content found

 ‭(Hidden)‬ 2012 Standard Specifications

 ‭(Hidden)‬ Resources

No content found

 2012 Specifications Manual

 

 

10 MATERIALS1017948310/27/2015 3:26:45 PMIt requires aggregate producers to perform quality control sampling, testing and record keeping on aggregates they ship for use by the Department The program is described in the https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1006 AGGREGATE QUALITY CONTROL/QUALITY ASSURANCEFiller, Alfred L;service-spsnapmgr
10 MATERIALS1017948410/29/2015 7:14:12 PMContents 1010-1 - AGGREGATE BASE COURSE 1. General Requirements 2. Sampling and Acceptance Sources will not be approved unless https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1010 AGGREGATE FOR NON-ASPHALT TYPE BASESFiller, Alfred L
10 MATERIALS1017948610/29/2015 8:08:35 PMContents 1014-1 - FINE AGGREGATE 1. General 2. Soundness 3. Deleterious Substances 4 https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1014 AGGREGATE FOR PORTLAND CEMENT CONCRETEFiller, Alfred L
10 MATERIALS1017948710/29/2015 8:26:57 PMContents 1016-1 - DESCRIPTION 1016-2 - USES 1016-3 - CLASSIFICATIONS CLASS I CLASS II https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1016 SELECT MATERIALSFiller, Alfred L
10 MATERIALS1017948910/27/2015 6:52:15 PMContents 1019-1 - GENERAL 1019-2 - SHOULDER AND SLOPE BORROW 1019-3 - AGGREGATE SHOULDER BORROW Material that contains roots, root mats, stumps or other https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1019 SHOULDER AND SLOPE MATERIAL Filler, Alfred L;service-spsnapmgr
10 MATERIALS1017949010/30/2015 2:47:17 PMContents 1020-1 - DELIVERY AND ACCEPTANCE OF ASPHALT MATERIALS 1020-2 - ASPHALT BINDER 1020-3 - ASPHALT EMULSION https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1020 ASPHALT MATERIALSFiller, Alfred L
16 EROSION CONTROL AND ROADSIDE DEVELOPMENT1017949510/19/2015 8:08:23 PMContents 1605-1 - DESCRIPTION 1605-2 - MATERIALS 1. Posts 2. Woven Wire Fence https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1605 TEMPORARY SILT FENCEFiller, Alfred L
16 EROSION CONTROL AND ROADSIDE DEVELOPMENT1017949810/19/2015 7:46:28 PMThe work includes, but is not limited to, furnishing, weighing, stockpiling, re-handling, placing and maintaining stone; and disposal of any stone not incorporated into the https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1610 STONE FOR EROSION CONTROLFiller, Alfred L
09 SIGNING1017950611/2/2015 3:54:48 PM[top of page ] 902 -2 MATERIALS Refer to Division 10 Item Section Joint Sealer 1028-2 Organic https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 902 FOUNDATIONS FOR GROUND MOUNTED SIGNSFiller, Alfred L
09 SIGNING1017950811/2/2015 4:48:14 PMContents 904-1 - DESCRIPTION 904-2 - MATERIALS 904-3 - CONSTRUCTION METHODS 1. General 2. Type A , B and C 3. Type D https://connect.ncdot.gov/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 904 SIGN ERECTIONFiller, Alfred L

 Related Documents

 

 

ACRF-1 Claims Resolution Form Fillable125295907/24/2018 2:04:41 AM7/24/2018 2:04:41 AMNorth Carolina Depart ment of Transportation Active Claim Resolution Form Use this form for Contracto r Clai ms up t o $100,000 and/or up to 30 days STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx910https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{82CF8B4C-D887-4EE9-A6D4-33228DF427D8}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Asphalt Roadway Inspector Daily Report125295936/9/2008 7:09:49 PM6/9/2008 7:09:49 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/Construction Forms/Forms/AllItems.aspx310https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{5C0E3AEB-59F5-4D5F-BC98-8E759A990796}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
SECTION 450 - PILE DRIVING EQUIPMENT DATA FORM EXAMPLE125336175/20/2015 7:07:03 PM5/20/2015 7:07:03 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/ConstManRefDocs/Forms/AllItems.aspx000https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{25613EBC-199D-4C0C-BD13-98F33FE9DD40}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
SECTION 450 - PILE DRIVING EQUIPMENT DATA FORM125336195/20/2015 2:12:05 PM5/20/2015 2:12:05 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/ConstManRefDocs/Forms/AllItems.aspx000https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{A8264090-6320-4AEB-9DC8-36F889CB4E27}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
NCDOT Adoption Memo of the 2018 Green Book125478331/30/2020 5:06:14 PM1/30/2020 5:06:14 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx1510https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/Roadway{4BE3B647-38C9-4E93-A54B-9556AC652C9F}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Policy on Street and Driveway Access125480418/22/2003 1:45:41 PM8/22/2003 1:45:41 PMNorth Carolina Department of Transportation July 2003POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS Published by the North Carolina Department of Transportation STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx1410https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/Roadway{80D2839B-833D-4530-876A-7883E4607296}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Public Records Request - 'File Copy' Site Upload Instructions125480525/4/2020 9:44:40 PM5/4/2020 9:44:40 PMPublic Records Request Page 1 of 4 Add and Approve file(s) for Public Records Request (PRR) Add PRR file(s) 1. Access Preconstruction Project Site 2. Select the desired library STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx310https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/Roadway{5B3B2DCB-C9AC-457D-AD37-91BF81C17179}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Signed_Memo_for_Interstate_Controlling_Criteria_Tool4047005/18/2021 6:38:10 PM5/18/2021 6:38:10 PMSTATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION ROADWAY DESIGN UNIT 1582 STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/Roadway{5EE87F22-C0AF-41B2-836B-F10E8013E5D0}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
HiCAMs and DOH Vendor Release Notes V8.6.4 4310515/24/2021 6:39:03 PM5/24/2021 6:39:03 PMApplication Modifications and Enhancements HiCAMS & DOH Vendor Version 8.6.4 were released Friday, 05/21/2021. OVERVIEW OF THE RELEASE • Application enhancements in various STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/HiCams/Forms/AllItems.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{26FB2029-6712-4695-8CEE-0108939FBD72}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
HiCAMs and DOH Vendor Release Notes V8.6.34321331/22/2021 9:49:05 PM1/22/2021 9:49:05 PMApplication Modifications and Enhancements HiCAMS & DOH Vendor Version 8.6.3 were released Friday, 01/22/2021. OVERVIEW OF THE RELEASE • Application enhancements in various STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/projects/construction/HiCams/Forms/AllItems.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/projects/construction{BE12A00F-C9E0-4259-8901-D9B4C6453542}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?