expand Division : 00 FORWARD ‎(1)
expand Division : 01 GENERAL REQUIREMENTS ‎(10)
expand Division : 02 EARTHWORK ‎(15)
expand Division : 03 PIPE CULVERTS ‎(6)
expand Division : 04 MAJOR STRUCTURES ‎(18)
expand Division : 05 SUBGRADE, BASES AND SHOULDERS ‎(11)
expand Division : 06 ASPHALT PAVEMENTS ‎(14)
expand Division : 07 CONCRETE PAVEMENTS AND SHOULDERS ‎(4)
expand Division : 08 INCIDENTALS ‎(32)
expand Division : 09 SIGNING ‎(6)
expand Division : 10 MATERIALS ‎(50)
expand Division : 11 WORK ZONE TRAFFIC CONTROL ‎(13)
expand Division : 12 PAVEMENT MARKINGS, MARKERS AND DELINEATION ‎(7)
expand Division : 14 LIGHTING ‎(13)
expand Division : 15 UTILITY CONSTRUCTION ‎(9)
expand Division : 16 EROSION CONTROL AND ROADSIDE DEVELOPMENT ‎(27)
expand Division : 17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS ‎(28)

 ‭(Hidden)‬ 2012 Standard Specifications

 ‭(Hidden)‬ Resources

No content found

 2012 Specifications Manual

 

 

06 ASPHALT PAVEMENTS51669410/15/2015 5:42:38 PM166https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 660 ASPHALT SURFACE TREATMENTSM-06-660System Account
08 INCIDENTALS51628610/22/2015 7:37:39 PM10https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 834 BLOCK MASONRY CONSTRUCTIONSM-08-834System Account
05 SUBGRADE, BASES AND SHOULDERS51590110/6/2015 6:18:21 PM28https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 520 AGGREGATE BASE COURSESM-05-520System Account
03 PIPE CULVERTS51620910/1/2015 12:35:23 PM241https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 310 PIPE CULVERTSSM-03-310System Account
04 MAJOR STRUCTURES51611910/5/2015 2:47:58 PM3https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 440 STEEL STRUCTURESSM-04-440System Account
10 MATERIALS51586710/29/2015 8:26:57 PM30https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1016 SELECT MATERIALSSM-10-1016System Account
14 LIGHTING51618510/20/2015 8:02:34 PM3https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1404 LIGHT STANDARDSSM-14-1404System Account
17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS51619611/2/2015 7:38:18 PM7https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1710 MESSENGER CABLESM-17-1710System Account
10 MATERIALS51652910/26/2015 8:09:22 PM3https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1084 PILESSM-10-1084System Account
10 MATERIALS51653610/22/2015 8:37:31 PM3https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1094 GROUND MOUNTED SIGNSSM-10-1094System Account

 Related Documents

 

 

Policy on Street and Driveway Access9841518/22/2003 9:45:41 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44318/22/2003 9:45:41 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
Roadway Design Consultant Coordination Guidelines98398010/7/2015 7:13:53 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443110/7/2015 7:13:53 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
Let Plans /e-signatures overview9841274/2/2014 8:20:29 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx Let Plans /e-signatures overview ; Goals ;Benefits ;DocuSign tool ;E-signatures Pilots underway ;Additional Pilots to aid in training ;Design Unit Changes ;FINAL PLANS structure & contents ;Contract Stds and Devt Changes ; Creating Let Plan sections example: B-4475 ;Example Results ;Example Construction Revision flow ;Design Consultant Guidelines ;PDF Formatting Rules ;Next Steps: Central Design-Bid-Build ;Division Let Projects ;Division Let Projects ;Background info ;Q&A for Design Units ;Q&A for Design Units… 1;2;3;4;5;6;7;8;9;10;11;12;13;14;15;16;17;19;20;210https://dot-spsappp04.dot.nc.net:44314/2/2014 8:20:29 AMpptxFalsepptx22~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PowerPoint.js
Functional and Preliminary Design Guidelines9839604/20/2016 11:49:00 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspxFUNCTIONAL DESIGN GUIDELINES0https://dot-spsappp04.dot.nc.net:44314/20/2016 11:49:00 AMdocxFalsedocx11~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js
QMS Asphalt Pavement Maintenance Version 2006-079841063/1/2010 4:06:45 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/Documents/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44313/1/2010 4:06:45 PMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
06. Typical Sections9826974/4/2017 9:56:31 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/Roadway Design Manual/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44314/4/2017 9:56:31 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
2010 Bid Averages92753810/15/2012 2:44:16 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/municipalities/State-Airport-Aid/Documents/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443110/15/2012 2:44:16 PMzipFalsezip1717~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js
Subcontract Approval Form Revised 11/201298456411/1/2012 7:01:45 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/Construction Forms/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443111/1/2012 7:01:45 PMzipFalsezip1717~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js
Creating Sealed Plans for Construction.984216FP Submittal Phase Type added9/22/2015 12:16:00 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspxCreating Sealed Plans for Construction.;Section I Creating Files for Signatures;Section II Signing and Naming Files;Section III Highway Letting Preparation0https://dot-spsappp04.dot.nc.net:44319/22/2015 12:16:00 PMdocxFalsedocx11~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js
Information needed for CEI HiCAMS access9862291/26/2015 8:39:00 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/HiCams/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44311/26/2015 8:39:00 PMdocFalsedoc11~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js

Was this page helpful?