expand Division : 00 FORWARD ‎(1)
expand Division : 01 GENERAL REQUIREMENTS ‎(10)
expand Division : 02 EARTHWORK ‎(15)
expand Division : 03 PIPE CULVERTS ‎(6)
expand Division : 04 MAJOR STRUCTURES ‎(18)
expand Division : 05 SUBGRADE, BASES AND SHOULDERS ‎(11)
expand Division : 06 ASPHALT PAVEMENTS ‎(14)
expand Division : 07 CONCRETE PAVEMENTS AND SHOULDERS ‎(4)
expand Division : 08 INCIDENTALS ‎(32)
expand Division : 09 SIGNING ‎(6)
expand Division : 10 MATERIALS ‎(50)
expand Division : 11 WORK ZONE TRAFFIC CONTROL ‎(13)
expand Division : 12 PAVEMENT MARKINGS, MARKERS AND DELINEATION ‎(7)
expand Division : 14 LIGHTING ‎(13)
expand Division : 15 UTILITY CONSTRUCTION ‎(9)
expand Division : 16 EROSION CONTROL AND ROADSIDE DEVELOPMENT ‎(27)
expand Division : 17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS ‎(28)

 ‭(Hidden)‬ 2012 Standard Specifications

 ‭(Hidden)‬ Resources

No content found

 2012 Specifications Manual

 

 

02 EARTHWORK5164399/25/2015 3:54:51 PM31https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 226 COMPREHENSIVE GRADINGSM-02-226System Account
06 ASPHALT PAVEMENTS51668910/14/2015 7:45:06 PM6https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 620 ASPHALT BINDER FOR PLANT MIXSM-06-620System Account
02 EARTHWORK5164409/25/2015 4:03:12 PM9https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 230 BORROW EXCAVATIONSM-02-230System Account
01 GENERAL REQUIREMENTS5159999/24/2015 6:39:04 PM10https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 109 MEASUREMENT AND PAYMENTSM-01-109System Account
03 PIPE CULVERTS51620910/1/2015 12:35:23 PM67https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 310 PIPE CULVERTSSM-03-310System Account
10 MATERIALS51667410/30/2015 3:44:54 PM4https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1028 JOINT MATERIALSSM-10-1028System Account
08 INCIDENTALS51617610/26/2015 5:58:07 PM3https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 858 ADJUSTMENT OF CATCH BASINS, MANHOLES, DROP INLETS, METER BOXES AND VALVE BOXESSM-08-858System Account
14 LIGHTING51618510/20/2015 8:02:34 PM3https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1404 LIGHT STANDARDSSM-14-1404System Account
17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS51619611/2/2015 7:38:18 PM7https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1710 MESSENGER CABLESM-17-1710System Account
10 MATERIALS51652310/27/2015 7:26:22 PM4https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1077 PRECAST CONCRETE UNITSSM-10-1077System Account

 Related Documents

 

 

Let Plans /e-signatures overview9841274/2/2014 8:20:29 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx Let Plans /e-signatures overview ; Goals ;Benefits ;DocuSign tool ;E-signatures Pilots underway ;Additional Pilots to aid in training ;Design Unit Changes ;FINAL PLANS structure & contents ;Contract Stds and Devt Changes ; Creating Let Plan sections example: B-4475 ;Example Results ;Example Construction Revision flow ;Design Consultant Guidelines ;PDF Formatting Rules ;Next Steps: Central Design-Bid-Build ;Division Let Projects ;Division Let Projects ;Background info ;Q&A for Design Units ;Q&A for Design Units… 1;2;3;4;5;6;7;8;9;10;11;12;13;14;15;16;17;19;20;210https://dot-spsappp04.dot.nc.net:44314/2/2014 8:20:29 AMpptxFalsepptx22~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PowerPoint.js
Roadway Design Consultant Coordination Guidelines98398010/7/2015 7:13:53 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443110/7/2015 7:13:53 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
Policy on Street and Driveway Access9841518/22/2003 9:45:41 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44318/22/2003 9:45:41 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
Subcontract Approval Form Revised 11/201298456411/1/2012 7:01:45 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/Construction Forms/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443111/1/2012 7:01:45 PMzipFalsezip1717~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js
Combined Field Inspection Questions9842998/30/2016 8:01:00 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspxBarriers;Constructability/Permitting/Commitments;Driveways;Lighting;Right of Way 514C2D77;514C2DB1;514C2DC6;514C2E12;514C2E490https://dot-spsappp04.dot.nc.net:44318/30/2016 8:01:00 AMdocxFalsedocx11~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js
Creating Sealed Plans for Construction.984216FP Submittal Phase Type added9/22/2015 12:16:00 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspxCreating Sealed Plans for Construction.;Section I Creating Files for Signatures;Section II Signing and Naming Files;Section III Highway Letting Preparation0https://dot-spsappp04.dot.nc.net:44319/22/2015 12:16:00 PMdocxFalsedocx11~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js
Design Exception Guidelines9841244/14/2004 9:58:37 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44314/14/2004 9:58:37 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
SUPPLEMENTAL AGREEMENT PRICING FORM9860856/17/2015 11:18:15 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/ConstManRefDocs/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44316/17/2015 11:18:15 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
00. Roadway Design Manual Part 1 Index9827503/14/2002 7:01:45 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/Roadway Design Manual/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44313/14/2002 7:01:45 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
Pipe Standards 200998419811/10/2009 9:57:40 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/Documents/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443111/10/2009 9:57:40 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js

Was this page helpful?