expand Division : 00 FORWARD ‎(1)
expand Division : 01 GENERAL REQUIREMENTS ‎(10)
expand Division : 02 EARTHWORK ‎(15)
expand Division : 03 PIPE CULVERTS ‎(6)
expand Division : 04 MAJOR STRUCTURES ‎(18)
expand Division : 05 SUBGRADE, BASES AND SHOULDERS ‎(11)
expand Division : 06 ASPHALT PAVEMENTS ‎(14)
expand Division : 07 CONCRETE PAVEMENTS AND SHOULDERS ‎(4)
expand Division : 08 INCIDENTALS ‎(32)
expand Division : 09 SIGNING ‎(6)
expand Division : 10 MATERIALS ‎(50)
expand Division : 11 WORK ZONE TRAFFIC CONTROL ‎(13)
expand Division : 12 PAVEMENT MARKINGS, MARKERS AND DELINEATION ‎(7)
expand Division : 14 LIGHTING ‎(13)
expand Division : 15 UTILITY CONSTRUCTION ‎(9)
expand Division : 16 EROSION CONTROL AND ROADSIDE DEVELOPMENT ‎(27)
expand Division : 17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS ‎(28)

 ‭(Hidden)‬ 2012 Standard Specifications

 ‭(Hidden)‬ Resources

No content found

 2012 Specifications Manual

 

 

16 EROSION CONTROL AND ROADSIDE DEVELOPMENT51665910/19/2015 6:42:33 PM4https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1631 ROLLED EROSION CONTROL PRODUCTSSM-16-1631System Account
06 ASPHALT PAVEMENTS51669410/15/2015 5:42:38 PM148https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 660 ASPHALT SURFACE TREATMENTSM-06-660System Account
08 INCIDENTALS51628910/26/2015 3:14:09 PM8https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 846 CONCRETE CURB, CURB AND GUTTER, CONCRETE GUTTER, SHOULDER BERM GUTTER, CONCRETE EXPRESSWAY GUTTER AND CONCRETE VALLEY GUTTERSM-08-846System Account
01 GENERAL REQUIREMENTS5159999/24/2015 6:39:04 PM14https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 109 MEASUREMENT AND PAYMENTSM-01-109System Account
02 EARTHWORK5164399/25/2015 3:54:51 PM35https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 226 COMPREHENSIVE GRADINGSM-02-226System Account
14 LIGHTING51618110/21/2015 12:18:18 PM7https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1400 ROADWAY LIGHTINGSM-14-1400System Account
03 PIPE CULVERTS5163269/28/2015 1:13:58 PM21https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 300 PIPE INSTALLATIONSM-03-300System Account
05 SUBGRADE, BASES AND SHOULDERS51590110/6/2015 6:18:21 PM25https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 520 AGGREGATE BASE COURSESM-05-520System Account
17 SIGNALS AND INTELLIGENT TRANSPORTATION SYSTEMS51601011/2/2015 6:49:38 PM11https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1743 PEDESTALSSM-17-1743System Account
15 UTILITY CONSTRUCTION51609910/19/2015 8:38:20 PM10https://dot-spsappp04.dot.nc.net:4431/resources/Specifications/Lists/2012StandSpecsMan/AllItems.aspxFalseSECTION 1500 GENERAL UTILITY REQUIREMENTSSM-15-1500System Account

 Related Documents

 

 

Roadway Design Consultant Coordination Guidelines98398010/7/2015 7:13:53 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443110/7/2015 7:13:53 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
Let Plans /e-signatures overview9841274/2/2014 8:20:29 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx Let Plans /e-signatures overview ; Goals ;Benefits ;DocuSign tool ;E-signatures Pilots underway ;Additional Pilots to aid in training ;Design Unit Changes ;FINAL PLANS structure & contents ;Contract Stds and Devt Changes ; Creating Let Plan sections example: B-4475 ;Example Results ;Example Construction Revision flow ;Design Consultant Guidelines ;PDF Formatting Rules ;Next Steps: Central Design-Bid-Build ;Division Let Projects ;Division Let Projects ;Background info ;Q&A for Design Units ;Q&A for Design Units… 1;2;3;4;5;6;7;8;9;10;11;12;13;14;15;16;17;19;20;210https://dot-spsappp04.dot.nc.net:44314/2/2014 8:20:29 AMpptxFalsepptx22~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PowerPoint.js
Policy on Street and Driveway Access9841518/22/2003 9:45:41 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44318/22/2003 9:45:41 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
00. Roadway Design Manual Part 1 Index9827503/14/2002 7:01:45 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/Roadway Design Manual/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44313/14/2002 7:01:45 AMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
Transport User Guide and Instruction9844083/18/2013 2:51:00 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspxRoadway Design;Introduction;Tech Support;About This Guide;Business Rules;Setting Up Projects;Getting Started;Entering Trns•port;Opening A Project;Entering Project Information;Entering Pay Items;Editing Line Items;Adding Multiple Entries;Inserting Rows on the Worksheet;Deleting Rows from the Worksheet;Sorting Data;Filtering Data;Closing A Project;Entering Alternate Items;Reports0https://dot-spsappp04.dot.nc.net:44313/18/2013 2:51:00 PMdocxFalsedocx11~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js
Project Closeout Retention Storage of Project Records98420412/29/2011 3:51:24 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/Documents/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443112/29/2011 3:51:24 PMpdfFalsepdf1515~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js
Subcontract Approval Form Revised 11/201298456411/1/2012 7:01:45 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/Construction Forms/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443111/1/2012 7:01:45 PMzipFalsezip1717~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js
Pre-Let Field Inspection Questions9841538/30/2016 8:03:00 AMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/Roadway/RoadwayDesignAdministrativeDocuments/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44318/30/2016 8:03:00 AMdocxFalsedocx11~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js
QMS-5 On The Job Training Roadway9845609/21/2015 8:57:25 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/Construction Forms/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:44319/21/2015 8:57:25 PMzipFalsezip1717~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js
Significant Revisions for Construction Manual98630812/30/2015 1:11:00 PMSTS_ListItem_DocumentLibraryhttps://dot-spsappp04.dot.nc.net:4431/projects/construction/ConstManRefDocs/Forms/AllItems.aspx0https://dot-spsappp04.dot.nc.net:443112/30/2015 1:11:00 PMdocxFalsedocx11~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Word.js

Was this page helpful?