 | | SP01G | PROJECT SPECIAL PROVISIONS - General | 1995-07 |
 | | SP01G | NOTICE TO BIDDERS (2 Cluster Projects) | 2014-01 |
 | | SP01G | NOTICE TO BIDDERS (3 Cluster Projects) | 2014-01 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (With Permits) | 2007-12 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, With Permits) | 2007-12 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, No Permits) | 2007-12 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, With Permits) | 2007-12 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, With Permits) | 2016-12 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, No Permits) | 2012-04 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, No Permit) | 2016-12 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits) | 2007-12 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Signals, No Permits) | 2007-12 |
 | | SP01G | INTERMEDIATE CONTRACT TIME # 1 AND LIQ. DAMAGES (Reforestation) | 2012-02 |
 | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits) | 2007-12 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Combined) | 2007-02 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Holiday Lane Closure) | 2007-02 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Lane Closure, Time Restricted) | 2007-02 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Road Closure Hour) | 2007-02 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Road Closure Minute) | 2013-10 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES FROM___TO___ | 2013-06 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Consecutive Hours) | 2013-06 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Consecutive Days) | 2013-06 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Inductive Loop Installations) | 2013-05 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Dates, Maps) | 2013-06 |
 | | SP01G | INTERMEDIATE CONTRACT TIMES (Dates, TMP) | 2013-06 |
 | | SP01G | PROSECUTION OF WORK (Multiple Maps) | 2012-08 |
 | | SP01G | PERMANENT VEGETATION ESTABLISHMENT | 2013-10 |
 | | SP01G | RAILROAD GRADE CROSSING (Not on Interstates) | 2013-01 |
 | | SP01G | CONSTRUCTION MORATORIUM (Trout) | 2014-07 |
 | | SP01G | CONSTRUCTION MORATORIUM (Anadromous Fish) | 2014-07 |
 | | SP01G | Bat Construction Moratorium | 2016-01 |
 | | SP01G | DELAY IN RIGHT OF ENTRY | 2014-07 |
 | | SP01G | DELAY IN RIGHT OF WAY ENTRY | 1995-07 |
 | | SP01G | DELAY IN RIGHT OF WAY ENTRY (MULTIPLE DATES) | 1995-07 |
 | | SP01G | POSTED WEIGHT LIMITS | 2015-09 |
 | | SP01G | PROGRESS SCHEDULE (RAIL) | 2013-02 |
 | | SP01G | MAJOR CONTRACT ITEMS | 2002-02 |
 | | SP01G | NO MAJOR CONTRACT ITEMS | 2007-08 |
 | | SP01G | NO SPECIALTY ITEMS | 1995-07 |
 | | SP01G | SPECIALTY ITEMS | 2012-01 |
 | | SP01G | SPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST | 1995-07 |
 | | SP01G | FUEL PRICE ADJUSTMENT | 2014-02 |
 | | SP01G | PAYOUT SCHEDULE | 2012-01 |
 | | SP01G | SCHEDULE OF ESTIMATED COMPLETION PROGRESS | 2016-05 |
 | | SP01G | DISADVANTAGED BUSINESS ENTERPRISES (Central Let) | 2017-01 |
 | | SP01G | DISADVANTAGED BUSINESS ENTERPRISES (Division) | 2017-01 |
 | | SP01G | DISADVANTAGED BUSINESS ENTERPRISES (Local Government Agency) | 2017-01 |
 | | SP01G | DISADVANTAGED BUSINESS ENTERPRISE (Rail) | 2012-12 |
 | | SP01G | MINORITY AND WOMEN BUSINESSES (Central Let) | 2016-04 |
 | | SP01G | MINORITY AND WOMEN BUSINESSES (Division) | 2017-01 |
 | | SP01G | MINORITY AND WOMEN BUSINESSES (Local Government Agency) | 2017-01 |
 | | SP01G | ARRA AND OERI CONTRACT PROVISIONS AND REPORTING REQUIREMENT CERTIFICATION | 2013-05 |
 | | SP01G | CERTIFICATION FOR FEDERAL-AID CONTRACTS | 1990-03 |
 | | SP01G | CONTRACTOR'S LICENSE REQUIREMENTS | 1995-07 |
 | | SP01G | U.S. DEPARTMENT OF TRANSPORTATION HOTLINE AND CARGO PROVISION (Federal Aid Projects) | 2016-02 |
 | | SP01G | SUBMISSION OF RECORDS (Federal Aid BRZ Projects) | 2012-08 |
 | | SP01G | SUBSURFACE INFORMATION (Information Not Available) | 1995-07 |
 | | SP01G | SUBSURFACE INFORMATION (Roadway only) | 1995-07 |
 | | SP01G | SUBSURFACE INFORMATION (Structures only) | 1995-07 |
 | | SP01G | SUBSURFACE INFORMATION (Roadway and Structures) | 1995-07 |
 | | SP01G | LOCATING EXISTING UNDERGROUND UTILITIES | 2012-03 |
 | | SP01G | VALUE ENGINEERING PROPOSAL | 2015-05 |
 | | SP01G | RESOURCE CONSERVATION | 2015-05 |
 | | SP01G | DOMESTIC STEEL | 2013-04 |
 | | SP01G | PORTABLE CONC. BARRIER (Partial Payment for Mat's.) | 2011-08 |
 | | SP01G | REMOVABLE PVMT. MARKINGS (Partial Payment for Mat'l) | 2011-08 |
 | | SP01G | MAINTENANCE OF THE PROJECT | 2012-01 |
 | | SP01G | COOPERATION BETWEEN CONTRACTORS | 1995-07 |
 | | SP01G | BID DOCUMENTATION | 2015-08 |
 | | SP01G | TWELVE-MONTH GUARANTEE | 2003-11 |
 | | SP01G | TWELVE-MONTH GUARANTEE (LGA ONLY) | 2013-12 |
 | | SP01G | OUTSOURCING OUTSIDE U.S.A. | 2006-05 |
 | | SP01G | GIFTS FROM VENDORS AND CONTRACTORS | 2009-12 |
 | | SP01G | LIABILITY INSURANCE | 2014-05 |
 | | SP01G | EROSION & STORM WATER CERTIFICATION | 2016-11 |
 | | SP01G | PROCEDURE FOR MONITORING BORROW PIT DISCHARGE | 2013-03 |
 | | SP01G | SUPPLEMENTAL CONTRACTOR EROSION CONTROL RESPONSIBILITIES (Rail) | 2013-02 |
 | | SP01G | SUPPLEMENTAL RESPONSE FOR EROSION CONTROL (Rail) | 2013-02 |
 | | SP01G | EMPLOYMENT | 2012-01 |
 | | SP01G | STATE HIGHWAY ADMINISTRATOR TITLE CHANGE | 2012-09 |
 | | SP01G | SUBLETTING OF CONTRACT | 2014-11 |
 | | SP01G | REVISION TO FHWA-1273 CONCERNING TAP-FUNDED PROJECTS | 2013-10 |
 | | SP01G | MOBILIZATION | 2015-09 |
 | | SP01R | PROJECT SPECIAL PROVISIONS (Roadway) | 1995-07 |
 | | SP01R | SHOULDER CONSTRUCTION | 2012-08 |
 | | SP01R | SHOULDER RECONSTRUCTION (Stone, Seeding Separate) | 2012-08 |
 | | SP01R | SHOULDER RECONSTRUCTION (No Seeding & Mulching) | 2012-08 |
 | | SP01R | SHOULDER RECONSTRUCTION (No Stone, Seeding Separate) | 2013-11 |
 | | SP01R | SHOULDER RECONSTRUCTION (No Stone, No Seeding & Mulch) | 2012-08 |
 | | SP01R | SHOULDER RECONSTRUCTION (State Forces Seeding) | 2012-08 |
 | | SP01R | SHOULDER RECONSTRUCTION (Stone, Seeding Separate, Div 5) | 2012-08 |
 | | SP01R | SHOULDER CONSTRUCTION PROCEDURE | 2013-10 |
 | | SP01R | SHOULDER RECONSTRUCTION PROCEDURE | 2013-10 |
 | | SP01R | CONSTRUCTION SEQUENCE | 2012-08 |
 | | SP02R | CLEARING AND GRUBBING - Method II | 2015-08 |
 | | SP02R | CLEARING AND GRUBBING - Method III | 2015-08 |
 | | SP02R | BURNING RESTRICTIONS | 1995-07 |
 | | SP02R | DEMOLISHION OF BUILDINGS AND APPURTENANCES | 2012-01 |
 | | SP02R | BUILDING REMOVAL (Inside ROW) | 2013-04 |
 | | SP02R | BUILDING REMOVAL (Cut Building at ROW) | 2013-04 |
 | | SP02R | BUILDING REMOVAL (Both sides of ROW) | 2016-11 |
 | | SP02R | BUILDING AND UNDERGROUND STORAGE TANK REMOVAL | 2013-04 |
 | | SP02R | LUMP SUM GRADING | 2010-08 |
 | | SP02R | TEMPORARY DETOURS (Lump Sum Grading) | 2015-04 |
 | | SP02R | TEMPORARY DETOURS | 2013-11 |
 | | SP02R | TEMPORARY DETOURS (Exception to Lump Sum Grading) | 2014-02 |
 | | SP02R | SHOULDER AND FILL SLOPE MATERIAL (Lump Sum Grading) | 2002-05 |
 | | SP02R | SHOULDER AND FILL SLOPE MATERIAL | 2002-05 |
 | | SP02R | BORROW EXCAVATION (Truck Measurement) | 1995-07 |
 | | SP02R | BORROW EXCAVATION (In Place or Truck Measurement) | 1995-07 |
 | | SP02R | SURCHARGES AND WAITING PERIODS | 2015-08 |
 | | SP02R | COAL COMBUSTION PRODUCTS IN EMBANKMENTS | 2015-05 |
 | | SP02R | MANUFACTURED QUARRY FINES IN EMBANKMENTS | 2017-01 |
 | | SP02R | EMBANKMENT SETTLEMENT GAUGES | 2015-08 |
 | | SP02R | SELECT GRANULAR MATERIAL | 2012-01 |
 | | SP02R | ROCK AND BROKEN PAVEMENT FILLS | 2016-02 |
 | | SP02R | BLASTING (with PRE-SPLITTING) | 2016-02 |
 | | SP02R | BLASTING (without PRE-SPLITTING) | 2016-02 |
 | | SP03R | PIPE INSTALLATION | 2015-08 |
 | | SP03R | REINFORCED CONCRETE TAPERED INLET | 2012-11 |
 | | SP03R | FLOWABLE FILL | 2012-01 |
 | | SP04R | BRIDGE APPROACH FILLS | 2012-01 |
 | | SP05R | PREPARATION OF SUBGRADE AND BASE | 1996-01 |
 | | SP05R | CLASS IV AGGREGATE STABILIZATION | 2014-11 |
 | | SP05R | AGGREGATE BASE COURSE | 2014-11 |
 | | SP05R | CLASS IV SUBGRADE STABILIZATION IN LIEU OF CHEMICAL STABILIZATION | 2015-06 |
 | | SP05R | SOIL-CEMENT BASE (FULL DEPTH RECLAMATION) | 2013-11 |
 | | SP05R | INCIDENTAL STONE BASE | 2012-08 |
 | | SP06R | ASPHALT PAVEMENTS SUPERPAVE | 2016-08 |
 | | SP06R | SHOULDER WEDGE | 2012-08 |
 | | SP06R | ASPHALT BINDER CONTENT OF ASPHALT PLANT MIX | 2012-07 |
 | | SP06R | ASPHALT PLANT MIXTURES | 1995-07 |
 | | SP06R | PRICE ADJUSTMENT FOR ASPHALT BINDER FOR PLANT MIX | 2000-11 |
 | | SP06R | FINAL SURFACE TESTING NOT REQUIRED | 2016-02 |
 | | SP06R | ASPHALT CONCRETE SURFACE COURSE COMPACTION | 2012-08 |
 | | SP06R | WEDGE COURSE | 2012-08 |
 | | SP06R | ASPHALT SURFACE TREATMENT | 2017-05 |
 | | SP06R | REPAIR OF EXISTING PAVEMENT | 2014-05 |
 | | SP06R | RESURFACING EXISTING BRIDGES | 2012-08 |
 | | SP06R | RESURFACING EXISTING BRIDGES (With Milling) | 2012-08 |
 | | SP06R | OPEN GRADED ASPHALT FRICTION COURSE, PERMEABLE ASPHALT DRAINAGE COURSE, AND ULTRA-THIN BONDED WEARING COURSE | 2015-12 |
 | | SP06R | OPEN-GRADED ASPHALT FRICTION COURSE | 2017-08 |
 | | SP06R | PAVING INTERSECTIONS (State Forces) | 2012-08 |
 | | SP06R | PAVING INTERSECTIONS (Contractor Forces) | 2012-08 |
 | | SP06R | PAVING DRIVEWAYS AND MAILBOX TURNOUTS (State Forces) | 2012-08 |
 | | SP06R | PAVING DRIVEWAYS AND MAILBOX TURNOUTS (Contractor Forces) | 2012-08 |
 | | SP06R | PAVEMENT WIDTH VARIES | 2012-08 |
 | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Base Course, Contractor Disposes of Excess) | 2016-01 |
 | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Int. Course, Contractor Disposes of Excess) | 2012-08 |
 | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Base Course, State Disposes of Excess) | 2016-01 |
 | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Int. Course, State Disposes of Excess) | 2012-08 |
 | | SP06R | ASPHALT CONC. SURF. COURSE, TYPE xxx (Leveling Course) | 2012-08 |
 | | SP06R | PATCHING EXISTING PAVEMENT | 2012-12 |
 | | SP06R | ULTRA-THIN BONDED WEARING COURSE WITH ALTERNATE METHOD | 2016-01 |
 | | SP07R | PORTLAND CEMENT CONCRETE PAVEMENT | 2015-02 |
 | | SP08R | MODIFIED CONCRETE FLUME WITH CONCRETE OUTLET | 2008-06 |
 | | SP08R | MODIFIED CONCRETE FLUME WITH FUNNEL OUTLET | 2006-07 |
 | | SP08R | SLUICE GATE | 2009-03 |
 | | SP08R | CONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET | 2006-07 |
 | | SP08R | CONVERTING EXISTING ___ TO ___ | 2006-07 |
 | | SP08R | REMOVAL AND STOCKPILE OF EXISTING GUARDRAIL | 2006-07 |
 | | SP08R | GUARDRAIL END UNITS TYPE TL-2 | 2017-07 |
 | | SP08R | GUARDRAIL END UNITS TYPE TL-3 | 2017-07 |
 | | SP08R | IMPACT ATTENUATOR UNITS TYPE 350 | 2015-07 |
 | | SP08R | TEMPORARY WOVEN WIRE FENCE | 2016-01 |
 | | SP08R | ADJUSTMENTS OF MANHOLES | 2012-08 |
 | | SP08R | ADJUSTMENTS TO MANHOLES | 2012-08 |
 | | SP08R | ADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES | 2012-08 |
 | | SP08R | CHAIN LINK FENCE w/BARBED WIRE ON EXTENSION ARMS | 1995-07 |
 | | SP08R | PREFORMED SCOUR HOLE WITH LEVEL SPREADER | 2009-10 |
 | | SP08R | DETECTABLE WARNINGS FOR EXISTING CURB RAMPS | 2011-08 |
 | | SP08R | DETECTABLE WARNINGS FOR PROPOSED CURB RAMPS | 2011-08 |
 | | SP08R | REMOVE AND REPLACE CURB RAMPS | 2015-02 |
 | | SP09R | STREET SIGNS AND ROUTE MARKERS | 1995-07 |
 | | SP09R | FOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES | 2015-05 |
 | | SP10R | MATERIALS | 2016-11 |
 | | SP10R | HIGH STRENGTH CONCRETE FOR DRIVEWAYS | 2012-01 |
 | | SP10R | SELECT MATERIAL, CLASS III, TYPE 3 | 2012-01 |
 | | SP10R | SHOULDER AND SLOPE BORROW | 2013-03 |
 | | SP10R | GROUT PRODUCTION AND DELIVERY | 2015-03 |
 | | SP10R | GEOSYNTHETICS | 2016-02 |
 | | SP11R | TEMPORARY SHORING | 2015-03 |
 | | SP11R | TEMPORARY TRAFFIC CONTROL DEVICES | 2012-01 |
 | | SP11R | TRUCK MOUNTED CHANGEABLE MESSAGE SIGNS | 2012-08 |
 | | SP11R | GROUT REFERENCES FOR POSITIVE PROTECTION | 2015-05 |
 | | SP14R | COORDINATION OF LIGHTING WORK | 2012-08 |
 | | SP15R | SANITARY SEWER | 2013-11 |
 | | SP15R | DUCTILE IRON PIPE FITTINGS | 2017-01 |
 | | SP15R | GROUT REFERENCES FOR UTILITY MANHOLES | 2015-08 |
 | | SP16R | PERMANENT SEEDING AND MULCHING | 1995-07 |
 | | SP16R | EROSION AND STORMWATER CONTROL FOR SHOULDER | 2012-08 |
 | | T | SEED MIX EAST (Alamance, Anson, Franklin, Guilford, Orange, Person, Vance, Wake and Warren) | 2016-03 |
 | | T | SEED MIX EAST CRIMP (All other counties no listed elsewhere) | 2016-03 |
 | | T | SEED MIX DIVISION 3 CRIMP (Brunswick, Duplin, New Hanover, Onslow, Pender, and Sampson) | 2016-03 |
 | | T | SEED MIX WEST (Alexander, Alleghany, Ashe, Avery, Cabarrus, Caldwell, Caswell, Catawba, Cleveland, Davidson, Davie, Forsyth, Gaston, Iredell, Lincoln, Mecklenburg, Rockingham, Rowan, Stanly, Stokes, Surry, Union, Watauga, Wilkes, and Yadkin) | 2016-03 |
 | | T | SEED MIX WEST ED (Buncombe, Burke, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, Mitchell, Polk, Rutherford, Swain, Transylvania, and Yancey) | 2016-03 |
 | | T | SEED MIX WEST CRIMP (All other counties not list elsewhere) | 2015-05 |
 | | T | WATTLES | 2012-01 |
 | | T | WATTLES WITH POLYACRYLAMIDE (PAM) | 2012-01 |
 | | U | WORK ZONE TRAFFIC CONTROL GENERAL REQUIREMENTS | 2017-07 |