SP01 G001.docx
  
SP01GPROJECT SPECIAL PROVISIONS - General1995-07
SP01 G003A.docx
  
SP01GNOTICE TO BIDDERS (2 Cluster Projects)2014-01
SP01 G003B.docx
  
SP01GNOTICE TO BIDDERS (3 Cluster Projects)2014-01
SP01 G004.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (With Permits)2007-12
SP01 G005A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, With Permits)2007-12
SP01 G005B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, No Permits)2007-12
SP01 G007A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, With Permits)2007-12
SP01 G007B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, With Permits)2016-12
SP01 G007C.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, No Permits)2012-04
SP01 G007D.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, No Permit)2016-12
SP01 G010A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (No Permits)2007-12
SP01 G010B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Signals, No Permits)2007-12
SP01 G013A.docx
  
SP01GINTERMEDIATE CONTRACT TIME # 1 AND LIQ. DAMAGES (Reforestation)2012-02
SP01 G013B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (No Permits)2007-12
SP01 G014A.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Combined)2007-02
SP01 G014B.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Holiday Lane Closure)2007-02
SP01 G014C.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Lane Closure, Time Restricted)2007-02
SP01 G014D.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Road Closure Hour)2007-02
SP01 G014E.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Road Closure Minute)2013-10
SP01 G014F.docx
  
SP01GINTERMEDIATE CONTRACT TIMES FROM___TO___2013-06
SP01 G014G.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Consecutive Hours)2013-06
SP01 G014H.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Consecutive Days)2013-06
SP01 G014I.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Inductive Loop Installations)2013-05
SP01 G014K.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Dates, Maps)2013-06
SP01 G014L.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Dates, TMP)2013-06
SP01 G015R.docx
  
SP01GPROSECUTION OF WORK (Multiple Maps)2012-08
SP01 G016.docx
  
SP01GPERMANENT VEGETATION ESTABLISHMENT2013-10
SP01 G017R.docx
  
SP01GRAILROAD GRADE CROSSING (Not on Interstates)2013-01
SP01 G018A.docx
  
SP01GCONSTRUCTION MORATORIUM (Trout)2014-07
SP01 G018B.docx
  
SP01GCONSTRUCTION MORATORIUM (Anadromous Fish)2014-07
SP01 G018C.docx
  
SP01GBat Construction Moratorium2016-01
SP01 G022.docx
  
SP01GDELAY IN RIGHT OF ENTRY2014-07
SP01 G022A.docx
  
SP01GDELAY IN RIGHT OF WAY ENTRY1995-07
SP01 G022B.docx
  
SP01GDELAY IN RIGHT OF WAY ENTRY (MULTIPLE DATES)1995-07
SP01 G024R.docx
  
SP01GPOSTED WEIGHT LIMITS2015-09
SP01 G025.docx
  
SP01GPROGRESS SCHEDULE (RAIL)2013-02
SP01 G028.docx
  
SP01GMAJOR CONTRACT ITEMS2002-02
SP01 G031.docx
  
SP01GNO MAJOR CONTRACT ITEMS2007-08
SP01 G034.docx
  
SP01GNO SPECIALTY ITEMS1995-07
SP01 G037.docx
  
SP01GSPECIALTY ITEMS2012-01
SP01 G040.docx
  
SP01GSPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST1995-07
SP01 G043.docx
  
SP01GFUEL PRICE ADJUSTMENT2014-02
SP01 G057.docx
  
SP01GPAYOUT SCHEDULE2012-01
SP01 G058.docx
  
SP01GSCHEDULE OF ESTIMATED COMPLETION PROGRESS2016-05
SP01 G061.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISES (Central Let)2017-01
SP01 G062.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISES (Division)2017-01
SP01 G063.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISES (Local Government Agency)2017-01
SP01 G064.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Rail)2012-12
SP01 G066.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Central Let)2016-04
SP01 G067.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Division)2017-01
SP01 G068.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Local Government Agency)2017-01
SP01 G070.docx
  
SP01GARRA AND OERI CONTRACT PROVISIONS AND REPORTING REQUIREMENT CERTIFICATION2013-05
SP01 G085.docx
  
SP01GCERTIFICATION FOR FEDERAL-AID CONTRACTS1990-03
SP01 G088.docx
  
SP01GCONTRACTOR'S LICENSE REQUIREMENTS1995-07
SP01 G100.docx
  
SP01GU.S. DEPARTMENT OF TRANSPORTATION HOTLINE AND CARGO PROVISION (Federal Aid Projects)2016-02
SP01 G103.docx
  
SP01GSUBMISSION OF RECORDS (Federal Aid BRZ Projects)2012-08
SP01 G112A.docx
  
SP01GSUBSURFACE INFORMATION (Information Not Available)1995-07
SP01 G112B.docx
  
SP01GSUBSURFACE INFORMATION (Roadway only)1995-07
SP01 G112C.docx
  
SP01GSUBSURFACE INFORMATION (Structures only)1995-07
SP01 G112D.docx
  
SP01GSUBSURFACE INFORMATION (Roadway and Structures)1995-07
SP01 G115.docx
  
SP01GLOCATING EXISTING UNDERGROUND UTILITIES2012-03
SP01 G116.docx
  
SP01GVALUE ENGINEERING PROPOSAL2015-05
SP01 G118.docx
  
SP01GRESOURCE CONSERVATION2015-05
SP01 G120.docx
  
SP01GDOMESTIC STEEL2013-04
SP01 G121.docx
  
SP01GPORTABLE CONC. BARRIER (Partial Payment for Mat's.)2011-08
SP01 G124.docx
  
SP01GREMOVABLE PVMT. MARKINGS (Partial Payment for Mat'l)2011-08
SP01 G125.docx
  
SP01GMAINTENANCE OF THE PROJECT2012-01
SP01 G133.docx
  
SP01GCOOPERATION BETWEEN CONTRACTORS1995-07
SP01 G142.docx
  
SP01GBID DOCUMENTATION2015-08
SP01 G145.docx
  
SP01GTWELVE-MONTH GUARANTEE2003-11
SP01 G146.docx
  
SP01GTWELVE-MONTH GUARANTEE (LGA ONLY)2013-12
SP01 G150.docx
  
SP01GOUTSOURCING OUTSIDE U.S.A.2006-05
SP01 G152.docx
  
SP01GGIFTS FROM VENDORS AND CONTRACTORS2009-12
SP01 G160.docx
  
SP01GLIABILITY INSURANCE2014-05
SP01 G180.docx
  
SP01GEROSION & STORM WATER CERTIFICATION2016-11
SP01 G181.docx
  
SP01GPROCEDURE FOR MONITORING BORROW PIT DISCHARGE2013-03
SP01 G182.docx
  
SP01GSUPPLEMENTAL CONTRACTOR EROSION CONTROL RESPONSIBILITIES (Rail)2013-02
SP01 G183.docx
  
SP01GSUPPLEMENTAL RESPONSE FOR EROSION CONTROL (Rail)2013-02
SP01 G184.docx
  
SP01GEMPLOYMENT2012-01
SP01 G185.docx
  
SP01GSTATE HIGHWAY ADMINISTRATOR TITLE CHANGE2012-09
SP01 G186.docx
  
SP01GSUBLETTING OF CONTRACT2014-11
SP01 G190.docx
  
SP01GREVISION TO FHWA-1273 CONCERNING TAP-FUNDED PROJECTS2013-10
SP01 G194.docx
  
SP01GMOBILIZATION2015-09
SP01 R001.docx
  
SP01RPROJECT SPECIAL PROVISIONS (Roadway)1995-07
SP01 R004R.docx
  
SP01RSHOULDER CONSTRUCTION2012-08
SP01 R007AR.docx
  
SP01RSHOULDER RECONSTRUCTION (Stone, Seeding Separate)2012-08
SP01 R007BR.docx
  
SP01RSHOULDER RECONSTRUCTION (No Seeding & Mulching)2012-08
SP01 R007CR.docx
  
SP01RSHOULDER RECONSTRUCTION (No Stone, Seeding Separate)2013-11
SP01 R007DR.docx
  
SP01RSHOULDER RECONSTRUCTION (No Stone, No Seeding & Mulch)2012-08
SP01 R007ER.docx
  
SP01RSHOULDER RECONSTRUCTION (State Forces Seeding)2012-08
SP01 R007FR.docx
  
SP01RSHOULDER RECONSTRUCTION (Stone, Seeding Separate, Div 5)2012-08
SP01 R010AR.docx
  
SP01RSHOULDER CONSTRUCTION PROCEDURE2013-10
SP01 R010BR.docx
  
SP01RSHOULDER RECONSTRUCTION PROCEDURE2013-10
SP01 R034R.docx
  
SP01RCONSTRUCTION SEQUENCE2012-08
SP02 R002A.docx
  
SP02RCLEARING AND GRUBBING - Method II2015-08
SP02 R002B.docx
  
SP02RCLEARING AND GRUBBING - Method III2015-08
SP02 R005.docx
  
SP02RBURNING RESTRICTIONS1995-07
SP02 R010.docx
  
SP02RDEMOLISHION OF BUILDINGS AND APPURTENANCES2012-01
SP02 R015A.docx
  
SP02RBUILDING REMOVAL (Inside ROW)2013-04
SP02 R015B.docx
  
SP02RBUILDING REMOVAL (Cut Building at ROW)2013-04
SP02 R015C.docx
  
SP02RBUILDING REMOVAL (Both sides of ROW)2016-11
SP02 R015D.docx
  
SP02RBUILDING AND UNDERGROUND STORAGE TANK REMOVAL2013-04
SP02 R016.docx
  
SP02RLUMP SUM GRADING2010-08
SP02 R030A.docx
  
SP02RTEMPORARY DETOURS (Lump Sum Grading)2015-04
SP02 R030B.docx
  
SP02RTEMPORARY DETOURS2013-11
SP02 R030C.docx
  
SP02RTEMPORARY DETOURS (Exception to Lump Sum Grading)2014-02
SP02 R045A.docx
  
SP02RSHOULDER AND FILL SLOPE MATERIAL (Lump Sum Grading)2002-05
SP02 R045B.docx
  
SP02RSHOULDER AND FILL SLOPE MATERIAL2002-05
SP02 R057.docx
  
SP02RBORROW EXCAVATION (Truck Measurement)1995-07
SP02 R058.docx
  
SP02RBORROW EXCAVATION (In Place or Truck Measurement)1995-07
SP02 R065.docx
  
SP02RSURCHARGES AND WAITING PERIODS2015-08
SP02 R070.docx
  
SP02RCOAL COMBUSTION PRODUCTS IN EMBANKMENTS2015-05
SP02 R072.docx
  
SP02RMANUFACTURED QUARRY FINES IN EMBANKMENTS2017-01
SP02 R075.docx
  
SP02REMBANKMENT SETTLEMENT GAUGES2015-08
SP02 R080.docx
  
SP02RSELECT GRANULAR MATERIAL2012-01
SP02 R085.docx
  
SP02RROCK AND BROKEN PAVEMENT FILLS2016-02
SP02 R088A.docx
  
SP02RBLASTING (with PRE-SPLITTING)2016-02
SP02 R088B.docx
  
SP02RBLASTING (without PRE-SPLITTING)2016-02
SP03 R001.docx
  
SP03RPIPE INSTALLATION2015-08
SP03 R005.docx
  
SP03RREINFORCED CONCRETE TAPERED INLET2012-11
SP03 R030.docx
  
SP03RFLOWABLE FILL2012-01
SP04 R002.docx
  
SP04RBRIDGE APPROACH FILLS2012-01
SP05 R005.docx
  
SP05RPREPARATION OF SUBGRADE AND BASE1996-01
SP05 R012.docx
  
SP05RCLASS IV AGGREGATE STABILIZATION2014-11
SP05 R014.docx
  
SP05RAGGREGATE BASE COURSE2014-11
SP05 R017.docx
  
SP05RCLASS IV SUBGRADE STABILIZATION IN LIEU OF CHEMICAL STABILIZATION2015-06
SP05 R020.docx
  
SP05RSOIL-CEMENT BASE (FULL DEPTH RECLAMATION)2013-11
SP05 R028R.docx
  
SP05RINCIDENTAL STONE BASE2012-08
SP06 R001.docx
  
SP06RASPHALT PAVEMENTS SUPERPAVE 2016-08
SP06 R003R.docx
  
SP06RSHOULDER WEDGE2012-08
SP06 R015.docx
  
SP06RASPHALT BINDER CONTENT OF ASPHALT PLANT MIX2012-07
SP06 R020.docx
  
SP06RASPHALT PLANT MIXTURES1995-07
SP06 R025.docx
  
SP06RPRICE ADJUSTMENT FOR ASPHALT BINDER FOR PLANT MIX2000-11
SP06 R045.docx
  
SP06RFINAL SURFACE TESTING NOT REQUIRED2016-02
SP06 R049R.docx
  
SP06RASPHALT CONCRETE SURFACE COURSE COMPACTION2012-08
SP06 R052R.docx
  
SP06RWEDGE COURSE2012-08
SP06 R054.docx
  
SP06RASPHALT SURFACE TREATMENT2017-05
SP06 R058R.docx
  
SP06RREPAIR OF EXISTING PAVEMENT2014-05
SP06 R061AR.docx
  
SP06RRESURFACING EXISTING BRIDGES2012-08
SP06 R061BR.docx
  
SP06RRESURFACING EXISTING BRIDGES (With Milling)2012-08
SP06 R062.docx
  
SP06ROPEN GRADED ASPHALT FRICTION COURSE, PERMEABLE ASPHALT DRAINAGE COURSE, AND ULTRA-THIN BONDED WEARING COURSE2015-12
SP06 R065.docx
  
SP06ROPEN-GRADED ASPHALT FRICTION COURSE2017-08
SP06 R067AR.docx
  
SP06RPAVING INTERSECTIONS (State Forces)2012-08
SP06 R067BR.docx
  
SP06RPAVING INTERSECTIONS (Contractor Forces)2012-08
SP06 R070AR.docx
  
SP06RPAVING DRIVEWAYS AND MAILBOX TURNOUTS (State Forces)2012-08
SP06 R070BR.docx
  
SP06RPAVING DRIVEWAYS AND MAILBOX TURNOUTS (Contractor Forces)2012-08
SP06 R076R.docx
  
SP06RPAVEMENT WIDTH VARIES2012-08
SP06 R079AR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Base Course, Contractor Disposes of Excess)2016-01
SP06 R079BR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Int. Course, Contractor Disposes of Excess)2012-08
SP06 R082AR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Base Course, State Disposes of Excess)2016-01
SP06 R082BR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Int. Course, State Disposes of Excess)2012-08
SP06 R085R.docx
  
SP06RASPHALT CONC. SURF. COURSE, TYPE xxx (Leveling Course)2012-08
SP06 R088R.docx
  
SP06RPATCHING EXISTING PAVEMENT2012-12
SP06 R090.docx
  
SP06RULTRA-THIN BONDED WEARING COURSE WITH ALTERNATE METHOD2016-01
SP07 R001.docx
  
SP07RPORTLAND CEMENT CONCRETE PAVEMENT2015-02
SP08 R010.docx
  
SP08RMODIFIED CONCRETE FLUME WITH CONCRETE OUTLET2008-06
SP08 R015.docx
  
SP08RMODIFIED CONCRETE FLUME WITH FUNNEL OUTLET2006-07
SP08 R020.docx
  
SP08RSLUICE GATE2009-03
SP08 R045.docx
  
SP08RCONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET2006-07
SP08 R050.docx
  
SP08RCONVERTING EXISTING ___ TO ___2006-07
SP08 R055.docx
  
SP08RREMOVAL AND STOCKPILE OF EXISTING GUARDRAIL2006-07
SP08 R064.docx
  
SP08RGUARDRAIL END UNITS TYPE TL-22017-07
SP08 R065.docx
  
SP08RGUARDRAIL END UNITS TYPE TL-32017-07
SP08 R075.docx
  
SP08RIMPACT ATTENUATOR UNITS TYPE 3502015-07
SP08 R085.docx
  
SP08RTEMPORARY WOVEN WIRE FENCE2016-01
SP08 R095R.docx
  
SP08RADJUSTMENTS OF MANHOLES2012-08
SP08 R096R.docx
  
SP08RADJUSTMENTS TO MANHOLES2012-08
SP08 R097R.docx
  
SP08RADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES2012-08
SP08 R100.docx
  
SP08RCHAIN LINK FENCE w/BARBED WIRE ON EXTENSION ARMS1995-07
SP08 R105.docx
  
SP08RPREFORMED SCOUR HOLE WITH LEVEL SPREADER2009-10
SP08 R125.docx
  
SP08RDETECTABLE WARNINGS FOR EXISTING CURB RAMPS2011-08
SP08 R126.docx
  
SP08RDETECTABLE WARNINGS FOR PROPOSED CURB RAMPS2011-08
SP08 R127.docx
  
SP08RREMOVE AND REPLACE CURB RAMPS2015-02
SP09 R002.docx
  
SP09RSTREET SIGNS AND ROUTE MARKERS1995-07
SP09 R005.docx
  
SP09RFOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES2015-05
SP10 R001.docx
  
SP10RMATERIALS2016-11
SP10 R002.docx
  
SP10RHIGH STRENGTH CONCRETE FOR DRIVEWAYS2012-01
SP10 R005.docx
  
SP10RSELECT MATERIAL, CLASS III, TYPE 32012-01
SP10 R010.docx
  
SP10RSHOULDER AND SLOPE BORROW2013-03
SP10 R020.docx
  
SP10RGROUT PRODUCTION AND DELIVERY2015-03
SP10 R025.docx
  
SP10RGEOSYNTHETICS2016-02
SP11 R002.docx
  
SP11RTEMPORARY SHORING2015-03
SP11 R005.docx
  
SP11RTEMPORARY TRAFFIC CONTROL DEVICES2012-01
SP11 R010.docx
  
SP11RTRUCK MOUNTED CHANGEABLE MESSAGE SIGNS2012-08
SP11 R020.docx
  
SP11RGROUT REFERENCES FOR POSITIVE PROTECTION2015-05
SP14 R002.docx
  
SP14RCOORDINATION OF LIGHTING WORK2012-08
SP15 R020.docx
  
SP15RSANITARY SEWER2013-11
SP15 R025.docx
  
SP15RDUCTILE IRON PIPE FITTINGS2017-01
SP15 R040.docx
  
SP15RGROUT REFERENCES FOR UTILITY MANHOLES2015-08
SP16 R002.docx
  
SP16RPERMANENT SEEDING AND MULCHING1995-07
SP16 R003R.docx
  
SP16REROSION AND STORMWATER CONTROL FOR SHOULDER2012-08
T S1East.doc
  
TSEED MIX EAST (Alamance, Anson, Franklin, Guilford, Orange, Person, Vance, Wake and Warren)2016-03
T S2.docx
  
TSEED MIX EAST CRIMP (All other counties no listed elsewhere)2016-03
T S2A.docx
  
TSEED MIX DIVISION 3 CRIMP (Brunswick, Duplin, New Hanover, Onslow, Pender, and Sampson)2016-03
T S3.docx
  
TSEED MIX WEST (Alexander, Alleghany, Ashe, Avery, Cabarrus, Caldwell, Caswell, Catawba, Cleveland, Davidson, Davie, Forsyth, Gaston, Iredell, Lincoln, Mecklenburg, Rockingham, Rowan, Stanly, Stokes, Surry, Union, Watauga, Wilkes, and Yadkin)2016-03
T S4.docx
  
TSEED MIX WEST ED (Buncombe, Burke, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, Mitchell, Polk, Rutherford, Swain, Transylvania, and Yancey)2016-03
T S5.doc
  
TSEED MIX WEST CRIMP (All other counties not list elsewhere)2015-05
T1.docx
  
TWATTLES2012-01
T2.docx
  
TWATTLES WITH POLYACRYLAMIDE (PAM)2012-01
U RWZ1.docx
  
UWORK ZONE TRAFFIC CONTROL GENERAL REQUIREMENTS2017-07
1 - 200Next
  • NOTE: Download Files

    ​The best way to access these files is to download them first.  Use the ... to download the files.

    Download Image.jpg

  
2012 Standard Specifications Manual

 Resources

No content found
No content found
Was this page helpful?