Sign In
  
  
  
  
  
  
  
SP01GPROJECT SPECIAL PROVISIONS - General1995-07SP01 G001SP01 G001
  
SP01GNOTICE TO BIDDERS (2 Cluster Projects)2014-01SP01 G003ASP01 G003A
  
SP01GNOTICE TO BIDDERS (3 Cluster Projects)2014-01SP01 G003BSP01 G003B
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (With Permits)2007-12SP01 G004SP01 G004
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, With Permits)2007-12SP01 G005ASP01 G005A
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, No Permits)2007-12SP01 G005BSP01 G005B
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, With Permits)2007-12SP01 G007ASP01 G007A
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, With Permits)2016-12SP01 G007BSP01 G007B
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, No Permits)2012-04SP01 G007CSP01 G007C
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, No Permit)2016-12SP01 G007DSP01 G007D
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (No Permits)2007-12SP01 G010ASP01 G010A
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Signals, No Permits)2007-12SP01 G010BSP01 G010B
  
SP01GINTERMEDIATE CONTRACT TIME # 1 AND LIQ. DAMAGES (Reforestation)2012-02PROJECT SPECIAL PROVISIONSSP01 G013A
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (No Permits)2007-12SP01 G013BSP01 G013B
  
SP01GINTERMEDIATE CONTRACT TIMES (Combined)2007-02SP01 G014ASP01 G014A
  
SP01GINTERMEDIATE CONTRACT TIMES (Holiday Lane Closure)2007-02SP01 G014BSP01 G014B
  
SP01GINTERMEDIATE CONTRACT TIMES (Lane Closure, Time Restricted)2007-02SP01 G014CSP01 G014C
  
SP01GINTERMEDIATE CONTRACT TIMES (Road Closure Hour)2007-02SP01 G014DSP01 G014D
  
SP01GINTERMEDIATE CONTRACT TIMES (Road Closure Minute)2013-10SP01 G014ESP01 G014E
  
SP01GINTERMEDIATE CONTRACT TIMES FROM___TO___2013-06SP01 G014FSP01 G014F
  
SP01GINTERMEDIATE CONTRACT TIMES (Consecutive Hours)2013-06SP01 G014GSP01 G014G
  
SP01GINTERMEDIATE CONTRACT TIMES (Consecutive Days)2013-06SP01 G014HSP01 G014H
  
SP01GINTERMEDIATE CONTRACT TIMES (Inductive Loop Installations)2013-05SP01 G014ISP01 G014I
  
SP01GINTERMEDIATE CONTRACT TIMES (Dates, Maps)2013-06SP01 G014KSP01 G014K
  
SP01GINTERMEDIATE CONTRACT TIMES (Dates, TMP)2013-06SP01 G014LSP01 G014L
  
SP01GPROSECUTION OF WORK (Multiple Maps)2012-08SP01 G015RSP01 G015R
  
SP01GPERMANENT VEGETATION ESTABLISHMENT2013-10SP01 G016SP01 G016
  
SP01GRAILROAD GRADE CROSSING (Not on Interstates)2013-01SP01 G017RSP01 G017R
  
SP01GCONSTRUCTION MORATORIUM (Trout)2014-07SP01 G018ASP01 G018A
  
SP01GCONSTRUCTION MORATORIUM (Anadromous Fish)2014-07SP01 G018BSP01 G018B
  
SP01GBat Construction Moratorium2016-01SP01 G018G
  
SP01GDELAY IN RIGHT OF ENTRY2014-07SP01 G022SP01 G022
  
SP01GDELAY IN RIGHT OF WAY ENTRY1995-07SP01 G022A
  
SP01GDELAY IN RIGHT OF WAY ENTRY (MULTIPLE DATES)1995-07SP01 G022B
  
SP01GPOSTED WEIGHT LIMITS2015-09SP01 G024RSP01 G024R
  
SP01GPROGRESS SCHEDULE (RAIL)2013-02SP01 G025SP01 G025
  
SP01GMAJOR CONTRACT ITEMS2002-02SP01 G028SP01 G028
  
SP01GNO MAJOR CONTRACT ITEMS2007-08SP01 G031SP01 G031
  
SP01GNO SPECIALTY ITEMS1995-07SP01 G034SP01 G034
  
SP01GSPECIALTY ITEMS2012-01SP01 G037SP01 G037
  
SP01GSPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST1995-07SP01 G040SP01 G040
  
SP01GFUEL PRICE ADJUSTMENT2014-02SP01 G043SP01 G043
  
SP01GPAYOUT SCHEDULE2012-01SP01 G057SP01 G057
  
SP01GSCHEDULE OF ESTIMATED COMPLETION PROGRESS2016-05PROJECT SPECIAL PROVISIONSSP01 G058
  
SP01GDISADVANTAGED BUSINESS ENTERPRISES (Central Let)2017-01SP01 G061
  
SP01GDISADVANTAGED BUSINESS ENTERPRISES (Division)2017-01SP01 G062
  
SP01GDISADVANTAGED BUSINESS ENTERPRISES (Local Government Agency)2017-01SP01 G063
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Rail)2012-12SP01 G064
  
SP01GMINORITY AND WOMEN BUSINESSES (Central Let)2016-04SP01 G066
  
SP01GMINORITY AND WOMEN BUSINESSES (Division)2017-01SP01 G067
  
SP01GMINORITY AND WOMEN BUSINESSES (Local Government Agency)2017-01SP01 G068
  
SP01GARRA AND OERI CONTRACT PROVISIONS AND REPORTING REQUIREMENT CERTIFICATION2013-05SP01 G070SP01 G070
  
SP01GCERTIFICATION FOR FEDERAL-AID CONTRACTS1990-03SP01 G085SP01 G085
  
SP01GCONTRACTOR'S LICENSE REQUIREMENTS1995-07SP01 G088SP01 G088
  
SP01GU.S. DEPARTMENT OF TRANSPORTATION HOTLINE AND CARGO PROVISION (Federal Aid Projects)2016-02SP01 G100SP01 G100
  
SP01GSUBMISSION OF RECORDS (Federal Aid BRZ Projects)2012-08SP01 G103SP01 G103
  
SP01GSUBSURFACE INFORMATION (Information Not Available)1995-07SP01 G112ASP01 G112A
  
SP01GSUBSURFACE INFORMATION (Roadway only)1995-07SP01 G112BSP01 G112B
  
SP01GSUBSURFACE INFORMATION (Structures only)1995-07SP01 G112CSP01 G112C
  
SP01GSUBSURFACE INFORMATION (Roadway and Structures)1995-07SP01 G112DSP01 G112D
  
SP01GLOCATING EXISTING UNDERGROUND UTILITIES2012-03SP01 G115SP01 G115
  
SP01GVALUE ENGINEERING PROPOSAL2015-05SP01 G116SP01 G116
  
SP01GRESOURCE CONSERVATION2015-05SP01 G118SP01 G118
  
SP01GDOMESTIC STEEL2013-04SP01 G120SP01 G120
  
SP01GPORTABLE CONC. BARRIER (Partial Payment for Mat's.)2011-08SP01 G121SP01 G121
  
SP01GREMOVABLE PVMT. MARKINGS (Partial Payment for Mat'l)2011-08SP01 G124SP01 G124
  
SP01GMAINTENANCE OF THE PROJECT2012-01SP01 G125SP01 G125
  
SP01GCOOPERATION BETWEEN CONTRACTORS1995-07SP01 G133SP01 G133
  
SP01GBID DOCUMENTATION2015-08SP01 G142SP01 G142
  
SP01GTWELVE-MONTH GUARANTEE2003-11SP01 G145SP01 G145
  
SP01GTWELVE-MONTH GUARANTEE (LGA ONLY)2013-12SP01 G146SP01 G146
  
SP01GOUTSOURCING OUTSIDE U.S.A.2006-05SP01 G150SP01 G150
  
SP01GGIFTS FROM VENDORS AND CONTRACTORS2009-12SP01 G152SP01 G152
  
SP01GLIABILITY INSURANCE2014-05SP01 G160SP01 G160
  
SP01GEROSION & STORM WATER CERTIFICATION2016-11SP01 G180SP01 G180
  
SP01GPROCEDURE FOR MONITORING BORROW PIT DISCHARGE2013-03SP01 G181SP01 G181
  
SP01GSUPPLEMENTAL CONTRACTOR EROSION CONTROL RESPONSIBILITIES (Rail)2013-02SP01 G182SP01 G182
  
SP01GSUPPLEMENTAL RESPONSE FOR EROSION CONTROL (Rail)2013-02SP01 G183SP01 G183
  
SP01GEMPLOYMENT2012-01SP01 G184SP01 G184
  
SP01GSTATE HIGHWAY ADMINISTRATOR TITLE CHANGE2012-09SP01 G185SP01 G185
  
SP01GSUBLETTING OF CONTRACT2014-11SP01 G186SP01 G186
  
SP01GREVISION TO FHWA-1273 CONCERNING TAP-FUNDED PROJECTS2013-10SP01 G190SP01 G190
  
SP01GMOBILIZATION2015-09SP01 G194
  
SP01RPROJECT SPECIAL PROVISIONS (Roadway)1995-07SP01 R001
  
SP01RSHOULDER CONSTRUCTION2012-08SP01 R004R
  
SP01RSHOULDER RECONSTRUCTION (Stone, Seeding Separate)2012-08SP01 R007AR
  
SP01RSHOULDER RECONSTRUCTION (No Seeding & Mulching)2012-08SP01 R007BR
  
SP01RSHOULDER RECONSTRUCTION (No Stone, Seeding Separate)2013-11SP01 R007CR
  
SP01RSHOULDER RECONSTRUCTION (No Stone, No Seeding & Mulch)2012-08SP01 R007DR
  
SP01RSHOULDER RECONSTRUCTION (State Forces Seeding)2012-08SP01 R007ER
  
SP01RSHOULDER RECONSTRUCTION (Stone, Seeding Separate, Div 5)2012-08SP01 R007FR
  
SP01RSHOULDER CONSTRUCTION PROCEDURE2013-10SP01 R010AR
  
SP01RSHOULDER RECONSTRUCTION PROCEDURE2013-10SP01 R010BR
  
SP01RCONSTRUCTION SEQUENCE2012-08SP01 R034R
  
SP02RCLEARING AND GRUBBING - Method II2015-08SP02 R002ASP02 R002A
  
SP02RCLEARING AND GRUBBING - Method III2015-08SP02 R002BSP02 R002B
  
SP02RBURNING RESTRICTIONS1995-07SP02 R005
  
SP02RDEMOLISHION OF BUILDINGS AND APPURTENANCES2012-01SP02 R010
  
SP02RBUILDING REMOVAL (Inside ROW)2013-04SP02 R015A
  
SP02RBUILDING REMOVAL (Cut Building at ROW)2013-04SP02 R015B
  
SP02RBUILDING REMOVAL (Both sides of ROW)2016-11SP02 R015C
  
SP02RBUILDING AND UNDERGROUND STORAGE TANK REMOVAL2013-04SP02 R015D
  
SP02RLUMP SUM GRADING2010-08SP02 R016
  
SP02RTEMPORARY DETOURS (Lump Sum Grading)2015-04SP02 R030A
  
SP02RTEMPORARY DETOURS2013-11SP02 R030B
  
SP02RTEMPORARY DETOURS (Exception to Lump Sum Grading)2014-02SP02 R030C
  
SP02RSHOULDER AND FILL SLOPE MATERIAL (Lump Sum Grading)2002-05SP02 R045A
  
SP02RSHOULDER AND FILL SLOPE MATERIAL2002-05SP02 R045B
  
SP02RBORROW EXCAVATION (Truck Measurement)1995-07SP02 R057
  
SP02RBORROW EXCAVATION (In Place or Truck Measurement)1995-07SP02 R058
  
SP02RSURCHARGES AND WAITING PERIODS2015-08SP02 R065SP02 R065
  
SP02RCOAL COMBUSTION PRODUCTS IN EMBANKMENTS2015-05SP02 R070SP02 R070
  
SP02RMANUFACTURED QUARRY FINES IN EMBANKMENTS2017-01SP02 R072SP02 R072
  
SP02REMBANKMENT SETTLEMENT GAUGES2015-08SP02 R075SP02 R075
  
SP02RSELECT GRANULAR MATERIAL2012-01SP02 R080
  
SP02RROCK AND BROKEN PAVEMENT FILLS2016-02SP02 R085SP02 R085
  
SP02RBLASTING (with PRE-SPLITTING)2016-02SP02 R088ASP02 R088A
  
SP02RBLASTING (without PRE-SPLITTING)2016-02SP02 R088BSP02 R088B
  
SP03RPIPE INSTALLATION2015-08SP03 R001SP3 R001
  
SP03RREINFORCED CONCRETE TAPERED INLET2012-11SP03 R005
  
SP03RFLOWABLE FILL2012-01SP03 R030
  
SP04RBRIDGE APPROACH FILLS2012-01SP04 R002
  
SP05RPREPARATION OF SUBGRADE AND BASE1996-01SP05 R005
  
SP05RCLASS IV AGGREGATE STABILIZATION2014-11SP05 R012
  
SP05RAGGREGATE BASE COURSE2014-11SP05 R014
  
SP05RCLASS IV SUBGRADE STABILIZATION IN LIEU OF CHEMICAL STABILIZATION2015-06SP05 R017
  
SP05RSOIL-CEMENT BASE (FULL DEPTH RECLAMATION)2013-11SP05 R020
  
SP05RINCIDENTAL STONE BASE2012-08SP05 R028R
  
SP06RASPHALT PAVEMENTS SUPERPAVE 2016-08SP06 R001
  
SP06RSHOULDER WEDGE2012-08SP06 R003R
  
SP06RASPHALT BINDER CONTENT OF ASPHALT PLANT MIX2012-07SP06 R015
  
SP06RASPHALT PLANT MIXTURES1995-07SP06 R020
  
SP06RPRICE ADJUSTMENT FOR ASPHALT BINDER FOR PLANT MIX2000-11SP06 R025
  
SP06RFINAL SURFACE TESTING NOT REQUIRED2016-02SP06 R045
  
SP06RASPHALT CONCRETE SURFACE COURSE COMPACTION2012-08SP06 R049R
  
SP06RWEDGE COURSE2012-08SP06 R052R
  
SP06RASPHALT SURFACE TREATMENT2017-05SP05 R054SP06 R054
  
SP06RREPAIR OF EXISTING PAVEMENT2014-05SP06 R058R
  
SP06RRESURFACING EXISTING BRIDGES2012-08SP06 R061AR
  
SP06RRESURFACING EXISTING BRIDGES (With Milling)2012-08SP06 R061BR
  
SP06ROPEN GRADED ASPHALT FRICTION COURSE, PERMEABLE ASPHALT DRAINAGE COURSE, AND ULTRA-THIN BONDED WEARING COURSE2015-12SP06 R062SP06 R062
  
SP06ROPEN-GRADED ASPHALT FRICTION COURSE2017-08SP06 R065SP06 R065
  
SP06RPAVING INTERSECTIONS (State Forces)2012-08SP06 R067AR
  
SP06RPAVING INTERSECTIONS (Contractor Forces)2012-08SP06 R067BR
  
SP06RPAVING DRIVEWAYS AND MAILBOX TURNOUTS (State Forces)2012-08SP06 R070AR
  
SP06RPAVING DRIVEWAYS AND MAILBOX TURNOUTS (Contractor Forces)2012-08SP06 R070BR
  
SP06RPAVEMENT WIDTH VARIES2012-08SP06 R076R
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Base Course, Contractor Disposes of Excess)2016-01SP06 R079AR
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Int. Course, Contractor Disposes of Excess)2012-08SP06 R079BR
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Base Course, State Disposes of Excess)2016-01SP06 R082AR
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Int. Course, State Disposes of Excess)2012-08SP06 R082BR
  
SP06RASPHALT CONC. SURF. COURSE, TYPE xxx (Leveling Course)2012-08SP06 R085R
  
SP06RPATCHING EXISTING PAVEMENT2012-12SP06 R088R
  
SP06RULTRA-THIN BONDED WEARING COURSE WITH ALTERNATE METHOD2016-01SP06 R090SP06 R090
  
SP07RPORTLAND CEMENT CONCRETE PAVEMENT2015-02SP07 R001SP07 R001
  
SP08RMODIFIED CONCRETE FLUME WITH CONCRETE OUTLET2008-06SP08 R010
  
SP08RMODIFIED CONCRETE FLUME WITH FUNNEL OUTLET2006-07SP08 R015
  
SP08RSLUICE GATE2009-03SP08 R020
  
SP08RCONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET2006-07SP08 R045
  
SP08RCONVERTING EXISTING ___ TO ___2006-07SP08 R050
  
SP08RREMOVAL AND STOCKPILE OF EXISTING GUARDRAIL2006-07SP08 R055
  
SP08RGUARDRAIL END UNITS TYPE TL-22017-07SP08 R064
  
SP08RGUARDRAIL END UNITS TYPE TL-32017-07SP08 R065
  
SP08RIMPACT ATTENUATOR UNITS TYPE 3502015-07SP08 R075
  
SP08RTEMPORARY WOVEN WIRE FENCE2016-01PROJECT SPECIAL PROVISIONS
  
SP08RADJUSTMENTS OF MANHOLES2012-08SP08 R095R
  
SP08RADJUSTMENTS TO MANHOLES2012-08SP08 R096R
  
SP08RADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES2012-08SP08 R097R
  
SP08RCHAIN LINK FENCE w/BARBED WIRE ON EXTENSION ARMS1995-07SP08 R100
  
SP08RPREFORMED SCOUR HOLE WITH LEVEL SPREADER2009-10SP08 R105
  
SP08RDETECTABLE WARNINGS FOR EXISTING CURB RAMPS2011-08SP08 R125
  
SP08RDETECTABLE WARNINGS FOR PROPOSED CURB RAMPS2011-08SP08 R126
  
SP08RREMOVE AND REPLACE CURB RAMPS2015-02SP08 R127
  
SP09RSTREET SIGNS AND ROUTE MARKERS1995-07SP09 R002
  
SP09RFOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES2015-05SP09 R005
  
SP10RMATERIALS2016-11SP10 R001SP10 R001
  
SP10RHIGH STRENGTH CONCRETE FOR DRIVEWAYS2012-01SP10 R002
  
SP10RSELECT MATERIAL, CLASS III, TYPE 32012-01SP10 R005
  
SP10RSHOULDER AND SLOPE BORROW2013-03SP10 R010
  
SP10RGROUT PRODUCTION AND DELIVERY2015-03SP10 R020
  
SP10RGEOSYNTHETICS2016-02SP10 R025
  
SP11RTEMPORARY SHORING2015-03SP11 R002
  
SP11RTEMPORARY TRAFFIC CONTROL DEVICES2012-01SP11 R005
  
SP11RTRUCK MOUNTED CHANGEABLE MESSAGE SIGNS2012-08SP11 R010
  
SP11RGROUT REFERENCES FOR POSITIVE PROTECTION2015-05SP11 R020SP11 R020
  
SP14RCOORDINATION OF LIGHTING WORK2012-08SP14 R002
  
SP15RSANITARY SEWER2013-11SP15 R020
  
SP15RDUCTILE IRON PIPE FITTINGS2017-01SP15 R025SP15 R025
  
SP15RGROUT REFERENCES FOR UTILITY MANHOLES2015-08SP15 R040SP15 R040
  
SP16RPERMANENT SEEDING AND MULCHING1995-07SP16 R002
  
SP16REROSION AND STORMWATER CONTROL FOR SHOULDER2012-08SP16 R003R
  
TSEED MIX EAST (Alamance, Anson, Franklin, Guilford, Orange, Person, Vance, Wake and Warren)2016-03T S1East
  
TSEED MIX EAST CRIMP (All other counties no listed elsewhere)2016-03T S2T S2
  
TSEED MIX DIVISION 3 CRIMP (Brunswick, Duplin, New Hanover, Onslow, Pender, and Sampson)2016-03T S2A
  
TSEED MIX WEST (Alexander, Alleghany, Ashe, Avery, Cabarrus, Caldwell, Caswell, Catawba, Cleveland, Davidson, Davie, Forsyth, Gaston, Iredell, Lincoln, Mecklenburg, Rockingham, Rowan, Stanly, Stokes, Surry, Union, Watauga, Wilkes, and Yadkin)2016-03T S3
  
TSEED MIX WEST ED (Buncombe, Burke, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, Mitchell, Polk, Rutherford, Swain, Transylvania, and Yancey)2016-03T S4
  
TSEED MIX WEST CRIMP (All other counties not list elsewhere)2015-05T S5.doc
  
TWATTLES2012-01T1
  
TWATTLES WITH POLYACRYLAMIDE (PAM)2012-01T2
  
UWORK ZONE TRAFFIC CONTROL GENERAL REQUIREMENTS2017-07U RWZ1
  
URESURFACING OPERATIONS2014-07U RWZ2
  
UPAVEMENT MARKINGS AND MARKERS2014-07U RWZ3
  
ULAW ENFORCEMENT2013-02U RWZ4U RWZ4
  
ZPERMITS COVER 2017-03Z001
  
ZPERMIT COVER (No Additional Permits)2017-03Z001A
  
ZAVAILABILITY OF FUNDS2008-05Z002
  
ZSEED QUALITY (Do NOT use if seeding is NOT required on project)2011-05Z003
  
ZERRATA2015-04Z004
  
ZPLANT PEST QUARANTINE2016-12Z004AZ004A
  
ZMINIMUM WAGE (State Funded)2009-07Z005
  
ZAWARD OF CONTRACT2016-02
  
ZMINORITY AND FEMALE EMPLOYMENT (Prime Contractor Company wide)2000-00Z007
  
ZFHWA 12732012-05Z008
  
ZFHWA 1273, Attachment A (Appalachian Only), add to Z-81994-10Z009
  
ZOn the Job Training - USE ON ALL PROJECTS2015-04Z010
  
ZNCDENR Name Change2016-01Z011
  
ZDavis Bacon Wage Rate Determinations2017-01NC099Z099
  
ZDavis Bacon Wage Rate Determinations2017-01NC100Z100
  
ZDavis Bacon Wage Rate Determinations2017-01NC101Z101
  
ZDavis Bacon Wage Rate Determinations2017-01NC102Z102
  
ZDavis Bacon Wage Rate Determinations2017-01NC103Z103
  
ZDavis Bacon Wage Rate Determinations2017-01NC104Z104
  
ZBid Bond FormZ122Z122
  
Z135EXECUTION OF BIDZ135
  
ZSignature Sheet (Central Let)2012-01Z140
  
ZGreenway2014-02Z200