| | SP01G | PROJECT SPECIAL PROVISIONS - General | 1995-07 | SP01 G001 | SP01 G001 |
| | SP01G | NOTICE TO BIDDERS (2 Cluster Projects) | 2014-01 | SP01 G003A | SP01 G003A |
| | SP01G | NOTICE TO BIDDERS (3 Cluster Projects) | 2014-01 | SP01 G003B | SP01 G003B |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (With Permits) | 2007-12 | SP01 G004 | SP01 G004 |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, With Permits) | 2007-12 | SP01 G005A | SP01 G005A |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, No Permits) | 2007-12 | SP01 G005B | SP01 G005B |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, With Permits) | 2007-12 | SP01 G007A | SP01 G007A |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, With Permits) | 2016-12 | SP01 G007B | SP01 G007B |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, No Permits) | 2012-04 | SP01 G007C | SP01 G007C |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, No Permit) | 2016-12 | SP01 G007D | SP01 G007D |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits) | 2007-12 | SP01 G010A | SP01 G010A |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Signals, No Permits) | 2007-12 | SP01 G010B | SP01 G010B |
| | SP01G | INTERMEDIATE CONTRACT TIME # 1 AND LIQ. DAMAGES (Reforestation) | 2012-02 | PROJECT SPECIAL PROVISIONS | SP01 G013A |
| | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits) | 2007-12 | SP01 G013B | SP01 G013B |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Combined) | 2007-02 | SP01 G014A | SP01 G014A |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Holiday Lane Closure) | 2007-02 | SP01 G014B | SP01 G014B |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Lane Closure, Time Restricted) | 2007-02 | SP01 G014C | SP01 G014C |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Road Closure Hour) | 2007-02 | SP01 G014D | SP01 G014D |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Road Closure Minute) | 2013-10 | SP01 G014E | SP01 G014E |
| | SP01G | INTERMEDIATE CONTRACT TIMES FROM___TO___ | 2013-06 | SP01 G014F | SP01 G014F |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Consecutive Hours) | 2013-06 | SP01 G014G | SP01 G014G |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Consecutive Days) | 2013-06 | SP01 G014H | SP01 G014H |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Inductive Loop Installations) | 2013-05 | SP01 G014I | SP01 G014I |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Dates, Maps) | 2013-06 | SP01 G014K | SP01 G014K |
| | SP01G | INTERMEDIATE CONTRACT TIMES (Dates, TMP) | 2013-06 | SP01 G014L | SP01 G014L |
| | SP01G | PROSECUTION OF WORK (Multiple Maps) | 2012-08 | SP01 G015R | SP01 G015R |
| | SP01G | PERMANENT VEGETATION ESTABLISHMENT | 2013-10 | SP01 G016 | SP01 G016 |
| | SP01G | RAILROAD GRADE CROSSING (Not on Interstates) | 2013-01 | SP01 G017R | SP01 G017R |
| | SP01G | CONSTRUCTION MORATORIUM (Trout) | 2014-07 | SP01 G018A | SP01 G018A |
| | SP01G | CONSTRUCTION MORATORIUM (Anadromous Fish) | 2014-07 | SP01 G018B | SP01 G018B |
| | SP01G | Bat Construction Moratorium | 2016-01 | SP01 G018G | |
| | SP01G | DELAY IN RIGHT OF ENTRY | 2014-07 | SP01 G022 | SP01 G022 |
| | SP01G | DELAY IN RIGHT OF WAY ENTRY | 1995-07 | SP01 G022A | |
| | SP01G | DELAY IN RIGHT OF WAY ENTRY (MULTIPLE DATES) | 1995-07 | SP01 G022B | |
| | SP01G | POSTED WEIGHT LIMITS | 2015-09 | SP01 G024R | SP01 G024R |
| | SP01G | PROGRESS SCHEDULE (RAIL) | 2013-02 | SP01 G025 | SP01 G025 |
| | SP01G | MAJOR CONTRACT ITEMS | 2002-02 | SP01 G028 | SP01 G028 |
| | SP01G | NO MAJOR CONTRACT ITEMS | 2007-08 | SP01 G031 | SP01 G031 |
| | SP01G | NO SPECIALTY ITEMS | 1995-07 | SP01 G034 | SP01 G034 |
| | SP01G | SPECIALTY ITEMS | 2012-01 | SP01 G037 | SP01 G037 |
| | SP01G | SPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST | 1995-07 | SP01 G040 | SP01 G040 |
| | SP01G | FUEL PRICE ADJUSTMENT | 2014-02 | SP01 G043 | SP01 G043 |
| | SP01G | PAYOUT SCHEDULE | 2012-01 | SP01 G057 | SP01 G057 |
| | SP01G | SCHEDULE OF ESTIMATED COMPLETION PROGRESS | 2016-05 | PROJECT SPECIAL PROVISIONS | SP01 G058 |
| | SP01G | DISADVANTAGED BUSINESS ENTERPRISES (Central Let) | 2017-01 | | SP01 G061 |
| | SP01G | DISADVANTAGED BUSINESS ENTERPRISES (Division) | 2017-01 | | SP01 G062 |
| | SP01G | DISADVANTAGED BUSINESS ENTERPRISES (Local Government Agency) | 2017-01 | | SP01 G063 |
| | SP01G | DISADVANTAGED BUSINESS ENTERPRISE (Rail) | 2012-12 | | SP01 G064 |
| | SP01G | MINORITY AND WOMEN BUSINESSES (Central Let) | 2016-04 | | SP01 G066 |
| | SP01G | MINORITY AND WOMEN BUSINESSES (Division) | 2017-01 | | SP01 G067 |
| | SP01G | MINORITY AND WOMEN BUSINESSES (Local Government Agency) | 2017-01 | | SP01 G068 |
| | SP01G | ARRA AND OERI CONTRACT PROVISIONS AND REPORTING REQUIREMENT CERTIFICATION | 2013-05 | SP01 G070 | SP01 G070 |
| | SP01G | CERTIFICATION FOR FEDERAL-AID CONTRACTS | 1990-03 | SP01 G085 | SP01 G085 |
| | SP01G | CONTRACTOR'S LICENSE REQUIREMENTS | 1995-07 | SP01 G088 | SP01 G088 |
| | SP01G | U.S. DEPARTMENT OF TRANSPORTATION HOTLINE AND CARGO PROVISION (Federal Aid Projects) | 2016-02 | SP01 G100 | SP01 G100 |
| | SP01G | SUBMISSION OF RECORDS (Federal Aid BRZ Projects) | 2012-08 | SP01 G103 | SP01 G103 |
| | SP01G | SUBSURFACE INFORMATION (Information Not Available) | 1995-07 | SP01 G112A | SP01 G112A |
| | SP01G | SUBSURFACE INFORMATION (Roadway only) | 1995-07 | SP01 G112B | SP01 G112B |
| | SP01G | SUBSURFACE INFORMATION (Structures only) | 1995-07 | SP01 G112C | SP01 G112C |
| | SP01G | SUBSURFACE INFORMATION (Roadway and Structures) | 1995-07 | SP01 G112D | SP01 G112D |
| | SP01G | LOCATING EXISTING UNDERGROUND UTILITIES | 2012-03 | SP01 G115 | SP01 G115 |
| | SP01G | VALUE ENGINEERING PROPOSAL | 2015-05 | SP01 G116 | SP01 G116 |
| | SP01G | RESOURCE CONSERVATION | 2015-05 | SP01 G118 | SP01 G118 |
| | SP01G | DOMESTIC STEEL | 2013-04 | SP01 G120 | SP01 G120 |
| | SP01G | PORTABLE CONC. BARRIER (Partial Payment for Mat's.) | 2011-08 | SP01 G121 | SP01 G121 |
| | SP01G | REMOVABLE PVMT. MARKINGS (Partial Payment for Mat'l) | 2011-08 | SP01 G124 | SP01 G124 |
| | SP01G | MAINTENANCE OF THE PROJECT | 2012-01 | SP01 G125 | SP01 G125 |
| | SP01G | COOPERATION BETWEEN CONTRACTORS | 1995-07 | SP01 G133 | SP01 G133 |
| | SP01G | BID DOCUMENTATION | 2015-08 | SP01 G142 | SP01 G142 |
| | SP01G | TWELVE-MONTH GUARANTEE | 2003-11 | SP01 G145 | SP01 G145 |
| | SP01G | TWELVE-MONTH GUARANTEE (LGA ONLY) | 2013-12 | SP01 G146 | SP01 G146 |
| | SP01G | OUTSOURCING OUTSIDE U.S.A. | 2006-05 | SP01 G150 | SP01 G150 |
| | SP01G | GIFTS FROM VENDORS AND CONTRACTORS | 2009-12 | SP01 G152 | SP01 G152 |
| | SP01G | LIABILITY INSURANCE | 2014-05 | SP01 G160 | SP01 G160 |
| | SP01G | EROSION & STORM WATER CERTIFICATION | 2016-11 | SP01 G180 | SP01 G180 |
| | SP01G | PROCEDURE FOR MONITORING BORROW PIT DISCHARGE | 2013-03 | SP01 G181 | SP01 G181 |
| | SP01G | SUPPLEMENTAL CONTRACTOR EROSION CONTROL RESPONSIBILITIES (Rail) | 2013-02 | SP01 G182 | SP01 G182 |
| | SP01G | SUPPLEMENTAL RESPONSE FOR EROSION CONTROL (Rail) | 2013-02 | SP01 G183 | SP01 G183 |
| | SP01G | EMPLOYMENT | 2012-01 | SP01 G184 | SP01 G184 |
| | SP01G | STATE HIGHWAY ADMINISTRATOR TITLE CHANGE | 2012-09 | SP01 G185 | SP01 G185 |
| | SP01G | SUBLETTING OF CONTRACT | 2014-11 | SP01 G186 | SP01 G186 |
| | SP01G | REVISION TO FHWA-1273 CONCERNING TAP-FUNDED PROJECTS | 2013-10 | SP01 G190 | SP01 G190 |
| | SP01G | MOBILIZATION | 2015-09 | | SP01 G194 |
| | SP01R | PROJECT SPECIAL PROVISIONS (Roadway) | 1995-07 | SP01 R001 | |
| | SP01R | SHOULDER CONSTRUCTION | 2012-08 | SP01 R004R | |
| | SP01R | SHOULDER RECONSTRUCTION (Stone, Seeding Separate) | 2012-08 | SP01 R007AR | |
| | SP01R | SHOULDER RECONSTRUCTION (No Seeding & Mulching) | 2012-08 | SP01 R007BR | |
| | SP01R | SHOULDER RECONSTRUCTION (No Stone, Seeding Separate) | 2013-11 | SP01 R007CR | |
| | SP01R | SHOULDER RECONSTRUCTION (No Stone, No Seeding & Mulch) | 2012-08 | SP01 R007DR | |
| | SP01R | SHOULDER RECONSTRUCTION (State Forces Seeding) | 2012-08 | SP01 R007ER | |
| | SP01R | SHOULDER RECONSTRUCTION (Stone, Seeding Separate, Div 5) | 2012-08 | SP01 R007FR | |
| | SP01R | SHOULDER CONSTRUCTION PROCEDURE | 2013-10 | SP01 R010AR | |
| | SP01R | SHOULDER RECONSTRUCTION PROCEDURE | 2013-10 | SP01 R010BR | |
| | SP01R | CONSTRUCTION SEQUENCE | 2012-08 | SP01 R034R | |
| | SP02R | CLEARING AND GRUBBING - Method II | 2015-08 | SP02 R002A | SP02 R002A |
| | SP02R | CLEARING AND GRUBBING - Method III | 2015-08 | SP02 R002B | SP02 R002B |
| | SP02R | BURNING RESTRICTIONS | 1995-07 | SP02 R005 | |
| | SP02R | DEMOLISHION OF BUILDINGS AND APPURTENANCES | 2012-01 | SP02 R010 | |
| | SP02R | BUILDING REMOVAL (Inside ROW) | 2013-04 | SP02 R015A | |
| | SP02R | BUILDING REMOVAL (Cut Building at ROW) | 2013-04 | SP02 R015B | |
| | SP02R | BUILDING REMOVAL (Both sides of ROW) | 2016-11 | SP02 R015C | |
| | SP02R | BUILDING AND UNDERGROUND STORAGE TANK REMOVAL | 2013-04 | SP02 R015D | |
| | SP02R | LUMP SUM GRADING | 2010-08 | SP02 R016 | |
| | SP02R | TEMPORARY DETOURS (Lump Sum Grading) | 2015-04 | SP02 R030A | |
| | SP02R | TEMPORARY DETOURS | 2013-11 | SP02 R030B | |
| | SP02R | TEMPORARY DETOURS (Exception to Lump Sum Grading) | 2014-02 | SP02 R030C | |
| | SP02R | SHOULDER AND FILL SLOPE MATERIAL (Lump Sum Grading) | 2002-05 | SP02 R045A | |
| | SP02R | SHOULDER AND FILL SLOPE MATERIAL | 2002-05 | SP02 R045B | |
| | SP02R | BORROW EXCAVATION (Truck Measurement) | 1995-07 | SP02 R057 | |
| | SP02R | BORROW EXCAVATION (In Place or Truck Measurement) | 1995-07 | SP02 R058 | |
| | SP02R | SURCHARGES AND WAITING PERIODS | 2015-08 | SP02 R065 | SP02 R065 |
| | SP02R | COAL COMBUSTION PRODUCTS IN EMBANKMENTS | 2015-05 | SP02 R070 | SP02 R070 |
| | SP02R | MANUFACTURED QUARRY FINES IN EMBANKMENTS | 2017-01 | SP02 R072 | SP02 R072 |
| | SP02R | EMBANKMENT SETTLEMENT GAUGES | 2015-08 | SP02 R075 | SP02 R075 |
| | SP02R | SELECT GRANULAR MATERIAL | 2012-01 | SP02 R080 | |
| | SP02R | ROCK AND BROKEN PAVEMENT FILLS | 2016-02 | SP02 R085 | SP02 R085 |
| | SP02R | BLASTING (with PRE-SPLITTING) | 2016-02 | SP02 R088A | SP02 R088A |
| | SP02R | BLASTING (without PRE-SPLITTING) | 2016-02 | SP02 R088B | SP02 R088B |
| | SP03R | PIPE INSTALLATION | 2015-08 | SP03 R001 | SP3 R001 |
| | SP03R | REINFORCED CONCRETE TAPERED INLET | 2012-11 | SP03 R005 | |
| | SP03R | FLOWABLE FILL | 2012-01 | SP03 R030 | |
| | SP04R | BRIDGE APPROACH FILLS | 2012-01 | SP04 R002 | |
| | SP05R | PREPARATION OF SUBGRADE AND BASE | 1996-01 | SP05 R005 | |
| | SP05R | CLASS IV AGGREGATE STABILIZATION | 2014-11 | SP05 R012 | |
| | SP05R | AGGREGATE BASE COURSE | 2014-11 | SP05 R014 | |
| | SP05R | CLASS IV SUBGRADE STABILIZATION IN LIEU OF CHEMICAL STABILIZATION | 2015-06 | SP05 R017 | |
| | SP05R | SOIL-CEMENT BASE (FULL DEPTH RECLAMATION) | 2013-11 | | SP05 R020 |
| | SP05R | INCIDENTAL STONE BASE | 2012-08 | SP05 R028R | |
| | SP06R | ASPHALT PAVEMENTS SUPERPAVE | 2016-08 | SP06 R001 | |
| | SP06R | SHOULDER WEDGE | 2012-08 | SP06 R003R | |
| | SP06R | ASPHALT BINDER CONTENT OF ASPHALT PLANT MIX | 2012-07 | SP06 R015 | |
| | SP06R | ASPHALT PLANT MIXTURES | 1995-07 | SP06 R020 | |
| | SP06R | PRICE ADJUSTMENT FOR ASPHALT BINDER FOR PLANT MIX | 2000-11 | SP06 R025 | |
| | SP06R | FINAL SURFACE TESTING NOT REQUIRED | 2016-02 | SP06 R045 | |
| | SP06R | ASPHALT CONCRETE SURFACE COURSE COMPACTION | 2012-08 | SP06 R049R | |
| | SP06R | WEDGE COURSE | 2012-08 | SP06 R052R | |
| | SP06R | ASPHALT SURFACE TREATMENT | 2017-05 | SP05 R054 | SP06 R054 |
| | SP06R | REPAIR OF EXISTING PAVEMENT | 2014-05 | SP06 R058R | |
| | SP06R | RESURFACING EXISTING BRIDGES | 2012-08 | SP06 R061AR | |
| | SP06R | RESURFACING EXISTING BRIDGES (With Milling) | 2012-08 | SP06 R061BR | |
| | SP06R | OPEN GRADED ASPHALT FRICTION COURSE, PERMEABLE ASPHALT DRAINAGE COURSE, AND ULTRA-THIN BONDED WEARING COURSE | 2015-12 | SP06 R062 | SP06 R062 |
| | SP06R | OPEN-GRADED ASPHALT FRICTION COURSE | 2017-08 | SP06 R065 | SP06 R065 |
| | SP06R | PAVING INTERSECTIONS (State Forces) | 2012-08 | SP06 R067AR | |
| | SP06R | PAVING INTERSECTIONS (Contractor Forces) | 2012-08 | SP06 R067BR | |
| | SP06R | PAVING DRIVEWAYS AND MAILBOX TURNOUTS (State Forces) | 2012-08 | SP06 R070AR | |
| | SP06R | PAVING DRIVEWAYS AND MAILBOX TURNOUTS (Contractor Forces) | 2012-08 | SP06 R070BR | |
| | SP06R | PAVEMENT WIDTH VARIES | 2012-08 | SP06 R076R | |
| | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Base Course, Contractor Disposes of Excess) | 2016-01 | SP06 R079AR | |
| | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Int. Course, Contractor Disposes of Excess) | 2012-08 | SP06 R079BR | |
| | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Base Course, State Disposes of Excess) | 2016-01 | SP06 R082AR | |
| | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Int. Course, State Disposes of Excess) | 2012-08 | SP06 R082BR | |
| | SP06R | ASPHALT CONC. SURF. COURSE, TYPE xxx (Leveling Course) | 2012-08 | SP06 R085R | |
| | SP06R | PATCHING EXISTING PAVEMENT | 2012-12 | SP06 R088R | |
| | SP06R | ULTRA-THIN BONDED WEARING COURSE WITH ALTERNATE METHOD | 2016-01 | SP06 R090 | SP06 R090 |
| | SP07R | PORTLAND CEMENT CONCRETE PAVEMENT | 2015-02 | SP07 R001 | SP07 R001 |
| | SP08R | MODIFIED CONCRETE FLUME WITH CONCRETE OUTLET | 2008-06 | SP08 R010 | |
| | SP08R | MODIFIED CONCRETE FLUME WITH FUNNEL OUTLET | 2006-07 | SP08 R015 | |
| | SP08R | SLUICE GATE | 2009-03 | SP08 R020 | |
| | SP08R | CONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET | 2006-07 | SP08 R045 | |
| | SP08R | CONVERTING EXISTING ___ TO ___ | 2006-07 | SP08 R050 | |
| | SP08R | REMOVAL AND STOCKPILE OF EXISTING GUARDRAIL | 2006-07 | SP08 R055 | |
| | SP08R | GUARDRAIL END UNITS TYPE TL-2 | 2017-07 | SP08 R064 | |
| | SP08R | GUARDRAIL END UNITS TYPE TL-3 | 2017-07 | SP08 R065 | |
| | SP08R | IMPACT ATTENUATOR UNITS TYPE 350 | 2015-07 | SP08 R075 | |
| | SP08R | TEMPORARY WOVEN WIRE FENCE | 2016-01 | PROJECT SPECIAL PROVISIONS | |
| | SP08R | ADJUSTMENTS OF MANHOLES | 2012-08 | SP08 R095R | |
| | SP08R | ADJUSTMENTS TO MANHOLES | 2012-08 | SP08 R096R | |
| | SP08R | ADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES | 2012-08 | SP08 R097R | |
| | SP08R | CHAIN LINK FENCE w/BARBED WIRE ON EXTENSION ARMS | 1995-07 | SP08 R100 | |
| | SP08R | PREFORMED SCOUR HOLE WITH LEVEL SPREADER | 2009-10 | SP08 R105 | |
| | SP08R | DETECTABLE WARNINGS FOR EXISTING CURB RAMPS | 2011-08 | SP08 R125 | |
| | SP08R | DETECTABLE WARNINGS FOR PROPOSED CURB RAMPS | 2011-08 | SP08 R126 | |
| | SP08R | REMOVE AND REPLACE CURB RAMPS | 2015-02 | SP08 R127 | |
| | SP09R | STREET SIGNS AND ROUTE MARKERS | 1995-07 | SP09 R002 | |
| | SP09R | FOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES | 2015-05 | SP09 R005 | |
| | SP10R | MATERIALS | 2016-11 | SP10 R001 | SP10 R001 |
| | SP10R | HIGH STRENGTH CONCRETE FOR DRIVEWAYS | 2012-01 | SP10 R002 | |
| | SP10R | SELECT MATERIAL, CLASS III, TYPE 3 | 2012-01 | SP10 R005 | |
| | SP10R | SHOULDER AND SLOPE BORROW | 2013-03 | SP10 R010 | |
| | SP10R | GROUT PRODUCTION AND DELIVERY | 2015-03 | SP10 R020 | |
| | SP10R | GEOSYNTHETICS | 2016-02 | SP10 R025 | |
| | SP11R | TEMPORARY SHORING | 2015-03 | SP11 R002 | |
| | SP11R | TEMPORARY TRAFFIC CONTROL DEVICES | 2012-01 | SP11 R005 | |
| | SP11R | TRUCK MOUNTED CHANGEABLE MESSAGE SIGNS | 2012-08 | SP11 R010 | |
| | SP11R | GROUT REFERENCES FOR POSITIVE PROTECTION | 2015-05 | SP11 R020 | SP11 R020 |
| | SP14R | COORDINATION OF LIGHTING WORK | 2012-08 | SP14 R002 | |
| | SP15R | SANITARY SEWER | 2013-11 | SP15 R020 | |
| | SP15R | DUCTILE IRON PIPE FITTINGS | 2017-01 | SP15 R025 | SP15 R025 |
| | SP15R | GROUT REFERENCES FOR UTILITY MANHOLES | 2015-08 | SP15 R040 | SP15 R040 |
| | SP16R | PERMANENT SEEDING AND MULCHING | 1995-07 | SP16 R002 | |
| | SP16R | EROSION AND STORMWATER CONTROL FOR SHOULDER | 2012-08 | SP16 R003R | |
| | T | SEED MIX EAST (Alamance, Anson, Franklin, Guilford, Orange, Person, Vance, Wake and Warren) | 2016-03 | T S1East | |
| | T | SEED MIX EAST CRIMP (All other counties no listed elsewhere) | 2016-03 | T S2 | T S2 |
| | T | SEED MIX DIVISION 3 CRIMP (Brunswick, Duplin, New Hanover, Onslow, Pender, and Sampson) | 2016-03 | T S2A | |
| | T | SEED MIX WEST (Alexander, Alleghany, Ashe, Avery, Cabarrus, Caldwell, Caswell, Catawba, Cleveland, Davidson, Davie, Forsyth, Gaston, Iredell, Lincoln, Mecklenburg, Rockingham, Rowan, Stanly, Stokes, Surry, Union, Watauga, Wilkes, and Yadkin) | 2016-03 | T S3 | |
| | T | SEED MIX WEST ED (Buncombe, Burke, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, Mitchell, Polk, Rutherford, Swain, Transylvania, and Yancey) | 2016-03 | T S4 | |
| | T | SEED MIX WEST CRIMP (All other counties not list elsewhere) | 2015-05 | T S5.doc | |
| | T | WATTLES | 2012-01 | T1 | |
| | T | WATTLES WITH POLYACRYLAMIDE (PAM) | 2012-01 | T2 | |
| | U | WORK ZONE TRAFFIC CONTROL GENERAL REQUIREMENTS | 2017-07 | U RWZ1 | |
| | U | RESURFACING OPERATIONS | 2014-07 | U RWZ2 | |
| | U | PAVEMENT MARKINGS AND MARKERS | 2014-07 | U RWZ3 | |
| | U | LAW ENFORCEMENT | 2013-02 | U RWZ4 | U RWZ4 |
| | Z | PERMITS COVER | 2017-03 | Z001 | |
| | Z | PERMIT COVER (No Additional Permits) | 2017-03 | Z001A | |
| | Z | AVAILABILITY OF FUNDS | 2008-05 | Z002 | |
| | Z | SEED QUALITY (Do NOT use if seeding is NOT required on project) | 2011-05 | Z003 | |
| | Z | ERRATA | 2015-04 | Z004 | |
| | Z | PLANT PEST QUARANTINE | 2016-12 | Z004A | Z004A |
| | Z | MINIMUM WAGE (State Funded) | 2009-07 | Z005 | |
| | Z | AWARD OF CONTRACT | 2016-02 | | |
| | Z | MINORITY AND FEMALE EMPLOYMENT (Prime Contractor Company wide) | 2000-00 | Z007 | |
| | Z | FHWA 1273 | 2012-05 | Z008 | |
| | Z | FHWA 1273, Attachment A (Appalachian Only), add to Z-8 | 1994-10 | Z009 | |
| | Z | On the Job Training - USE ON ALL PROJECTS | 2015-04 | Z010 | |
| | Z | NCDENR Name Change | 2016-01 | Z011 | |
| | Z | Davis Bacon Wage Rate Determinations | 2017-01 | NC099 | Z099 |
| | Z | Davis Bacon Wage Rate Determinations | 2017-01 | NC100 | Z100 |
| | Z | Davis Bacon Wage Rate Determinations | 2017-01 | NC101 | Z101 |
| | Z | Davis Bacon Wage Rate Determinations | 2017-01 | NC102 | Z102 |
| | Z | Davis Bacon Wage Rate Determinations | 2017-01 | NC103 | Z103 |
| | Z | Davis Bacon Wage Rate Determinations | 2017-01 | NC104 | Z104 |
| | Z | Bid Bond Form | | Z122 | Z122 |
| | Z135 | EXECUTION OF BID | | Z135 | |
| | Z | Signature Sheet (Central Let) | 2012-01 | Z140 | |
| | Z | Greenway | 2014-02 | | Z200 |