~ Future bridge replacement at a location where the river makes an oxbow.
~ Challenge will be to minimize encroachment into the river.
~ Bridge design is still ongoing - to be let in December 2007.
~ Structure will be cored slabs consisting of 4 - 50' spans.
~ Variety of Environmental issues - top down construction will be utilized.
~ Had difficulty meeting CAMA requirements for runoff.
~ A historic farm is located nearby.