Spring Field Review Site 04 2007BeaufortBridge #104 on NC 32 over Broad Creek
~ Site has difficult geometry due to the ox-bow/switchback in the river.
 
 ~ There was some general discussion on bridge types and construction methods for difficult situations.
~ Future bridge replacement at a location where the river makes an oxbow.
 
 ~ Challenge will be to minimize encroachment into the river.
 
 ~ Bridge design is still ongoing - to be let in December 2007.
 
 ~ Structure will be cored slabs consisting of 4 - 50' spans.
 
 ~ Variety of Environmental issues - top down construction will be utilized.
 
 ~ Had difficulty meeting CAMA requirements for runoff.
 
 ~ A historic farm is located nearby.