Spring Field Review Site 06 2005Jones, BRIDGE #19 -- SR 1004 over Mill Creek
~ 2-span cored slab bridge with a two bar metal rail.
 
 ~ The bridge had and "A"-frame bent which increases the potential for debris collection
 
 ~ This is a good example of a project where the Department did not excessively widen the bridge.
 
 ~ Tangent alignment and grade made this site suitable for limited work on approach roadway.
 
 ~ The Bridge Maintenance Unit suggested eliminating restrainer blocks on cored slab bridges that are detailed with dowels
 
A small bridge replacement recently completed. This bridge is a good example of a project where the Department did not excessively widen the bridge compared to the bridge approaches.