Spring Field Review Site 07 2007HydeBridge #54 on US 264 over a canal north of Englehard
~ One corner of the existing partially removed bridge did not have shoring, which appeared necessary.
 
 ~ Water filled barrier rails used on the bridge approaches, but are not suitable for use on the bridge. Some of the rails did not have water.
 
~ Project paired with Site 5 at Rose Bay
 
 ~ Let in April 2006.
 
 ~ Precast bent caps with prestressed piles.