~ Asphalt cracking over the joints
~ Some of the prestressed piles had poor finish.
~ Cracking on acute corners of cored slabs on a skew.
~ Repairs performed with appropriate product from approved list (epoxy motar)
~ Bridge had horizontal drains through the rail at the ends of the bridge over the buffer zones.
~ For such a long structure, drainage could have been more efficient with a closed drainage system.