Spring Field Review Site 09 2017RutherfordLake Lure Bridge on US-64 over Broad River

Issue

Pour sequence detailed on the plans would make pouring and finishing the deck more difficult than necessary.

Action Item

Construction and Structures Management will work together to develop pour sequence and finishing guidance for designers.

Issue

‘K’ bars in end bent diaphragm were in conflict with the ‘S’ bars projecting from top of girders.

Action Item

Section 6.3.3.1 of the Design Manual instructs designers to check to ensure this conflict does not occur.