Spring Field Review Site 09 2018Onslow, Jones & Craven CountyMaysville Bypass

Issue

Galvanized coating on pipe piles was damaged during construction.

Action Item

Contractor shall repair galvanized coating in accordance with the Standard Specification.

 

Issue

Lifting holes in the pipe piles remained open and unplugged.

Action Item

Contractor shall plug lifting holes.

Issue

Lifting holes were cut into the galvanized pipe piles with a torch.

Action Item

Torching holes shall not be allowed.

Was this page helpful?