Spring Field Review Site 09A 2005Tyrrell, Washington, Add-on Bear Bridge
~ Had continuous for live load deck with little cracking
 
 ~ Joints (armor angles with elastomeric concrete headers) looked good, except on one end where there was some grinding that was required
 
 ~ Double row of closely spaced vertical prestressed piles
 ~~ Raised questions on the zone of influence / interaction of the closely spaced piles.
Was this page helpful?