~ This Project was initially scoped as a culvert.
~ Steep end slopes with rock embankment (class 7 rip-rap),
~ The alternative was to install fabric wall slope stabilization
~ Bent in stream required permit modification to divert stream channel.
~ It was noted that during your tour of this site the metal SIP forms were being placed before cast-in-place concrete diaphragms.