Structures Field Review Site 03 2015Cumberland Fayetteville Bridge on NC-53/NC-210 over I-95

​Issue

Epoxy overlay peeling off in numerous locations.

Action Item

For future bridge deck preservation projects with epoxy overlays, Construction will enforce adequate cure time, especially in areas requiring further patching.  Construction will also ensure that the deck is shot-blasted before patching.

Was this page helpful?