Structures Field Review Site 06 2015RobesonLumberton Dual Bridges on US-301 over I-95 (I-95 Exit 22) (Diverging Diamond Interchange)

​Issue

Concrete bridge deck showing premature cracking; crack sealant was applied to cracked areas.

Action Item

Construction will investigate the use of crack sealant versus concrete deck sealant.  Construction will discuss with Bridge Maintenance Engineers to determine successful sealant products.

Was this page helpful?