Structures Field Review Site 09 2010PamlicoBridge on NC 55 over Upper Broad Creek
Link slab appeared to be performing well.
~ 12 span link slab bridge on prestressed concrete girders.
 
 ~ Has been in service approximately 5 years.
 
 ~ 17 span cored slab 24 units wide. Bridge was stage constructed.
 
 ~ Units were sloped to match the normal crown section

Bridge Site Images

Was this page helpful?