Structures Field Review Site 10 2010Beaufort, Bridge #103 on NC 32 over Runyon Creek
~ Precast prestressed deck panels did not exhibit any cracks and appeared to be performing well.
 
 ~ Classic rail on bridge had a good finish.
 
 ~ It was suggested that future classic rail utilize high slump concrete with pea gravel to facilitate the desirable finish.
 
 A/I ~ Structure Design will develop a special provision with a prescribed concrete mix for classic rails, and requirements for steel void forms used to create openings in the rail.
 
 ~ Prestressed girder bridge. 10'-0" girder spacing with precast deck panels.
 
 ~ Classic rail