Structures Field Review Site 12 2010Beaufort, Bridge #77 on NC 99 over Pantego Creek
Contractor had just begun constructing the temporary work bridge.
~ 38 span prestressed girder bridge with 20" p/s concrete piles.
 
 ~ Bridge has a closed drainage system.
Was this page helpful?