Structures Field Review Site 14 2014Cabarrus, Bridge on George Liles Pkwy over US- 29

Issues:

Dual bridges over at-grade SPUI; turned back wings between bridges with a braced pile in each wing; slope protection between bridges from the tip of the wings (top of wing elevation) the MSE walls (6” below top of MSE coping)

Action Item:

Investigate the possibility of eliminating the turned back wings between bridges, turning the MSE wall to join the backwall of each bridge, and joining the MSE wall between bridges in-line with the backwalls