| | | SP01G | PROJECT SPECIAL PROVISION (General) | 1995-07 | SP01 G000 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACTOR PREQUALIFICATION | 2023-07 | SP01 G001 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERESTED PARTIES LIST | 2022-07 | SP01 G002 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | NOTICE TO BIDDERS (2 Cluster Projects) | 2014-01 | SP01 G003A | PROJECT SPECIAL PROVISIONS |
| | | SP01G | NOTICE TO BIDDERS (3 Cluster Projects) | 2014-01 | SP01 G003B | PROJECT SPECIAL PROVISIONS |
| | | SP01G | BUILD AMERICA, BUY AMERICA (BABA) | 2022-11 | SP01 G004 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | LIABILITY INSURANCE | 2023-05 | SP01 G005 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (with Permits) | 2023-05 | SP01 G006 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, with Permits) | 2023-05 | SP01 G007A | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, No Permits) | 2023-05 | SP01 G007B | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, with Permits) | 2023-05 | SP01 G008A | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, with Permits) | 2023-05 | SP01 G008B | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, No Permits) | 2023-05 | SP01 G008C | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, No Permits) | 2023-05 | SP01 G008D | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits) | 2007-12 | SP01 G010A | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Signals, No Permits) | 2007-12 | SP01 G010B | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME FOR ID IQ | 2022-02 | SP01 G011 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIME #1 AND LIQ. DAMAGES (Reforestation) | 2012-02 | SP01 G013A | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits) | 2012-02 | SP01 G013B | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INT. CONTRACT TIME #1, BONUS CLAUSE AND LIQ. DAMAGES | 2016-05 | SP01 G013C | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Combined) | 2007-02 | SP01 G014A | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Holiday Lane Closure) | 2007-02 | SP01 G014B | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Lane Closure, Time Restricted) | 2007-02 | SP01 G014C | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Road Closure Hour) | 2007-02 | SP01 G014D | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Road Closure Minute) | 2013-10 | SP01 G014E | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES FROM ___ TO ___ | 2013-06 | SP01 G014F | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Consecutive Hours) | 2013-06 | SP01 G014G | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Consecutive Days) | 2013-06 | SP01 G014H | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Inductive Loop Installations) | 2013-05 | SP01 G014I | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Dates, Maps) | 2013-06 | SP01 G014K | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Dates, TMP) | 2013-06 | SP01 G014L | PROJECT SPECIAL PROVISIONS |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (PEDESTRIAN CURB RAMP) | 2021-09 | SP01 G014M | PROJECT SPECIAL PROVISIONS |
| | | SP01G | PROSECUTION OF WORK (Multiple Maps) | 2012-08 | SP01 G015R | PROJECT SPECIAL PROVISIONS |
| | | SP01G | PERMANENT VEGETATION ESTABLISHMENT | 2013-10 | SP01 G016 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | RAILROAD GRADE CROSSING (Not on Interstate) | 2020-10 | SP01 G017R | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONSTRUCTION MORATORIUM (Trout) | 2014-07 | SP01 G018A | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONSTRUCTION MORATORIUM (Anadromous Fish) | 2014-07 | SP01 G018B | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONSTRUCTION MORATORIUM (Bat) | 2016-01 | SP01 G018C | PROJECT SPECIAL PROVISIONS |
| | | SP01G | DELAY IN RIGHT OF ENTRY | 2014-07 | SP01 G022 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | POSTED WEIGHT LIMITS | 2015-09 | SP01 G024R | PROJECT SPECIAL PROVISIONS |
| | | SP01G | MAJOR CONTRACT ITEMS | 2002-02 | SP01 G028 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | NO MAJOR CONTRACT ITEMS | 2007-08 | SP01 G031 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | NO SPECIALTY ITEMS | 1995-07 | SP01 G034 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SPECIALTY ITEMS | 2021-07 | SP01 G037 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST | 1995-07 | SP01 G040 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | FUEL PRICE ADJUSTMENT | 2022-11 | SP01 G043 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | FUEL PRICE ADJUSTMENT PAPER BID | 2022-11 | SP01 G043 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | STEEL PRICE ADJUSTMENT | 2022-12 | SP01 G047 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | PAYOUT SCHEDULE | 2012-01 | SP01 G057 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SCHEDULE OF ESTIMATED COMPLETION PROGRESS | 2023-06 | SP01 G058 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | DISADVANTAGED BUSINESS ENTERPRISE (Central Let) | 2021-08 | SP01 G061 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | DISADVANTAGED BUSINESS ENTERPRISE (Division) | 2021-08 | SP01 G062 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | DISADVANTAGED BUSINESS ENTERPRISE (Local Government Agency) | 2021-08 | SP01 G063 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | MINORITY AND WOMEN BUSINESSES (Central Let) | 2021-08 | SP01 G066 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | MINORITY AND WOMEN BUSINESSES (Division) | 2021-08 | SP01 G067 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | MINORITY AND WOMEN BUSINESSES (Local Government Agency) | 2021-08 | SP01 G068 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SMALL BUSINESS ENTERPRISE MULTI-YEAR MAINTENANCE CONTRACTS | 2022-04 | SP01 G072 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SMALL BUSINESS ENTERPRISE | 2022-04 | SP01 G073 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SMALL BUSINESS ENTERPRISE MULTI-YEAR MAINTENANCE CONTRACTS FOR ID IQ | 2022-02 | SP01 G074 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | MULTI-YEAR MAINTENANCE CONTRACTS FOR ID IQ | 2022-04 | SP01 G075 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | MULTI-YEAR MAINTENANCE CONTRACTS | 2022-04 | SP01 G076 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CERTIFICATION FOR FEDERAL-AID CONTRACTS | 1990-03 | SP01 G085 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONTRACTOR'S LICENSE REQUIREMENTS | 1995-07 | SP01 G088 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | RESTRICTIONS ON ITS EQUIPMENT AND SERVICES | 2020-11 | SP01 G090 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | USE OF UNMANNED AIRCRAFT SYSTEM (UAS) | 2019-08 | SPO1 G092 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | CONSTRUCTION EQUIPMENT EMISSIONS | 2022-01 | SP01 G094 | PROJECT SPECIAL PROVISION |
| | | SP01G | EQUIPMENT IDLING GUIDELINES | 2021-01 | SP01 G096 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | U.S. DOT HOTLINE | 2022-09 | SP01 G100 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SUBMISSION OF RECORDS | 2023-10 | SP01 G103 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SUBSURFACE INFORMATION (Roadway Only) | 2022-08 | SP01 G112A | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SUBSURFACE INFORMATION (Structures Only) | 2022-08 | SP01 G112B | PROJECT SPECIAL PROVISIONS |
| | | SP01G | SUBSURFACE INFORMATION (Roadway and Structures) | 1995-07 | SP01 G112C | PROJECT SPECIAL PROVISIONS |
| | | SP01G | PORTABLE CONCRETE BARRIER (Partial Payment for Materials) | 2011-08 | SP01 G121 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | REMOVABLE PAVEMENT MARKINGS (Partial Payment for Materials) | 2011-08 | SP01 G124 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | MAINTENANCE OF THE PROJECT | 2012-01 | SP01 G125 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | COOPERATION BETWEEN CONTRACTORS | 1995-07 | SP01 G133 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | ELECTRONIC BIDDING | 2019-02 | SP01 G140 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | AWARD LIMITS | 2022-04 | SP01 G141 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | BID DOCUMENTATION | 2015-08 | SP01 G142 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | TWELVE-MONTH GUARANTEE | 2003-07 | SP01 G145 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | TWELVE-MONTH GUARANTEE (LGA Only) | 2013-10 | SP01 G146 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | OUTSOURCING OUTSIDE THE USA | 2006-05 | SP01 G150 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | E&SC/SW Certification | | SP01 G180 | E&SC/SW Certification SP1 G180 |
| | | SP01G | EROSION & STORM WATER CERTIFICATION | 2020-12 | SP01 G180 | PROJECT SPECIAL PROVISIONS |
| | | SP01G | PROCEDURE FOR MONITORING BORROW PIT DISCHARGE | 2019-04 | SP01 G181 | PROJECT SPECIAL PROVISIONS |
| | | SP01R | PROJECT SPECIAL PROVISIONS (Roadway) | 1995-07 | SP01 R001 | PROJECT SPECIAL PROVISIONS |
| | | SP01R | SHOULDER CONSTRUCTION | 2012-08 | S001 R04R | PROJECT SPECIAL PROVISIONS |
| | | SP01R | SHOULDER RECONSTRUCTION | 2023-01 | SP01 R007R | PROJECT SPECIAL PROVISIONS |
| | | SP01R | SHOULDER CONSTRUCTION PROCEDURE | 2013-10 | SP01 R010AR | PROJECT SPECIAL PROVISIONS |
| | | SP01R | SHOULDER RECONSTRUCTION PROCEDURE | 2013-10 | SP01 R010BR | PROJECT SPECIAL PROVISIONS |
| | | SP01R | CONSTRUCTION SEQUENCE | 2012-08 | SP01 R034R | PROJECT SPECIAL PROVISIONS |
| | | SP02R | CLEARING AND GRUBBING (Method II) | 2015-08 | SP02 R002A | PROJECT SPECIAL PROVISIONS |
| | | SP02R | CLEARING AND GRUBBING (Method III) | 2015-08 | SP02 R002B | PROJECT SPECIAL PROVISIONS |
| | | SP02R | BURNING RESTRICTION | 1995-07 | SP02 R005 | PROJECT SPECIAL PROVISIONS |
| | | SP02R | DEMOLITION OF BUILDING AND APPURTENANCES | 2012-01 | SP02 R010 | PROJECT SPECIAL PROVISIONS |
| | | SP02R | BUILDING REMOVAL (Inside ROW) | 2013-04 | SP02 R015A | PROJECT SPECIAL PROVISIONS |
| | | SP02R | BUILDING REMOVAL (Cut Building at ROW) | 2013-04 | SP02 R015B | PROJECT SPECIAL PROVISIONS |
| | | SP02R | BUILDING REMOVAL (Both sides of ROW) | 2016-11 | SP02 R015C | PROJECT SPECIAL PROVISIONS |
| | | SP02R | BUILDING AND UNDERGROUND STORAGE TANK REMOVAL | 2013-04 | SP02 R015D | PROJECT SPECIAL PROVISIONS |
| | | SP02R | LUMP SUM GRADING | 2022-12 | SP02 R016 | PROJECT SPECIAL PROVISIONS |
| | | SP02R | TEMPORARY DETOURS (Lump Sum Grading) | 2015-04 | SP02 R030A | PROJECT SPECIAL PROVISIONS |
| | | SP02R | TEMPORARY DETOURS (No lump sum grading) | 2013-11 | SP02 R030B | PROJECT SPECIAL PROVISIONS |
| | | SP02R | TEMPORARY DETOURS (Exceptions to Lump Sum Grading) | 2014-02 | SP02 R030C | PROJECT SPECIAL PROVISIONS |
| | | SP02R | SHOULDER AND FILL SLOPE MATERIAL (Lump Sum Grading) | 2002-05 | SP02 R045A | PROJECT SPECIAL PROVISIONS |
| | | SP02R | SHOULDER AND FILL SLOPE MATERIAL (No Lump Sum Grading) | 2002-05 | SP02 R045B | PROJECT SPECIAL PROVISIONS |
| | | SP02R | BORROW EXCAVATION (Truck Measurement) | 1995-07 | SP02 R057 | PROJECT SPECIAL PROVISIONS |
| | | SP02R | BORROW EXCAVATION (In Place or Truck Measurement) | 1995-07 | SP02 R058 | PROJECT SPECIAL PROVISIONS |
| | | SP02R | COAL COMBUSTION PRODUCTS IN EMBANKMENTS | 2020-12 | SP02 R070 | COAL FLY ASH IN EMBANKMENTS: (4-16-02) (Rev 4-15-08) |
| | | SP02R | MANUFACTURED QUARRY FINES IN EMBANKMENTS | 2023-07 | SP02 R072 | PROJECT SPECIAL PROVISIONS |
| | | SP03R | REINFORCED CONCRETE TAPERED INLET | 2012-11 | SP03 R005 | PROJECT SPECIAL PROVISIONS |
| | | SP03R | FLOWABLE FILL | 2012-01 | SP03 R030 | PROJECT SPECIAL PROVISIONS |
| | | SP03R | CORRUGATED ALUMINUM ALLOY CULVERT PIPE | 2021-09 | SP03 R034 | PROJECT SPECIAL PROVISIONS |
| | | SP03R | CULVERT PIPE | 2022-05 | SP03 R035 | PROJECT SPECIAL PROVISIONS |
| | | SP04R | BRIDGE APPROACH FILLS | 2023-11 | SP04 R002 | PROJECT SPECIAL PROVISIONS |
| | | SP04R | PILES | 2022-12 | SP04 R005 | PROJECT SPECIAL PROVISIONS |
| | | SP05R | AUTOMATED FINE GRADING | 1996-01 | SP05 R005 | PROJECT SPECIAL PROVISIONS |
| | | SP05R | AGGREGATE SUBGRADE | 2023-04 | SP05 R008 | PROJECT SPECIAL PROVISION |
| | | SP05R | GEOTEXTILE FOR SUBGRADE STABILIZATION | 2023-07 | SP05 R009A | PROJECT SPECIAL PROVISIONS |
| | | SP05R | GEOTEXTILE FOR SUBGRADE SABILIZATION (WITHOUT AGGREGATE SUBGRADE PROVISION) | 2023-07 | SP05 R009B | PROJECT SPECIAL PROVISIONS |
| | | SP05R | STABILIZATION OF COASTAL PLAIN SANDS | 2014-11 | SP05 R012 | SP05 R012 |
| | | SP05R | AGGREGATE SUBGRADE IN LIEU OF CHEMICAL STABILIZATION | 2023-03 | SP05 R017 | SP05 R017 |
| | | SP05R | SOIL-CEMENT BASE (FULL DEPTH RECLAMATION) | 2013-11 | SP05 R020 | SP05 R020 |
| | | SP05R | INCIDENTAL STONE BASE | 2012-08 | SP05 R028R | PROJECT SPECIAL PROVISIONS |
| | | SP06R | INCIDENTAL MILLING | 2023-01 | SP06 R002R | PROJECT SPECIAL PROVISIONS |
| | | SP06R | SHOULDER WEDGE | 2012-08 | SP06 R003R | PROJECT SPECIAL PROVISIONS |
| | | SP06R | PRICE ADJUSTMENT FOR ASPHALT BINDER FOR PLANT MIX | 2000-11 | SP06 R025 | PROJECT SPECIAL PROVISIONS |
| | | SP06R | FINAL SURFACE TESTING NOT REQUIRED | 2016-02 | SP06 R045 | PROJECT SPECIAL PROVISIONS |
| | | SP06R | ASPHALT SURFACE TREATMENT AGGREGATE TYPE AND APPLICATION RATES | 2018-01 | SP06 R054 | PROJECT SPECIAL PROVISIONS |
| | | SP06R | REPAIR OF EXISTING PAVEMENT | 2014-05 | SP06 R058R | PROJECT SPECIAL PROVISIONS |
| | | SP06R | MILLING ASPHALT PAVEMENT | 2019-01 | SP06 R059 | PROJECT SPECIAL PROVISIONS |
| | | SP06R | RESURFACING EXISTING BRIDGES | 2012-08 | SP06 R061AR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | RESURFACING EXISTING BRIDGES (With Milling) | 2012-08 | SP06 R061BR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | Open Graded Asphalt Friction Course | 2019-01 | SP06 R063 | PROJECT SPECIAL PROVISIONS |
| | | SP06R | Ultra-thin Bonded Wearing Course | 2019-01 | SP06 R064 | PROJECT SPECIAL PROVISIONS |
| | | SP06R | ASPHALT CONCRETE PLANT MIX PAVEMENTS | 2023-07 | SP06 R065 | PROJECT SPECIAL PROVISIONS |
| | | SP06R | PAVEMENT DESIGN MIX TYPE MODIFICATIONS | 2018-02 | SP06 R066 | PROJECT SPECIAL PROVISIONS |
| | | SP06R | PAVING INTERSECTIONS (State Forces) | 2012-08 | SP06 R067AR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | PAVING INTERSECTIONS (Contractor Forces) | 2012-08 | SP06 R067BR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | PAVING DRIVEWAYS AND MAILBOX TURNOUTS (State Forces) | 2012-08 | SP06 R070AR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | PAVING DRIVEWAYS AND MAILBOX TURNOUTS (Contractor Forces) | 2012-08 | SP06 R070BR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | PAVEMENT WIDTH VARIES | 2012-08 | SP06 R076R | PROJECT SPECIAL PROVISIONS |
| | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Base Course, Contractor Disposes of Excess) | 2016-01 | SP06 R079AR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Int. Course, Contractor Disposes of Excess) | 2012-08 | SP06 R079BR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Base Course, State Disposes of Excess) | 2016-01 | SP06 R082AR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Int. Course, State Disposes of Excess) | 2012-08 | SP06 R082BR | PROJECT SPECIAL PROVISIONS |
| | | SP06R | ASPHALT CONCRETE SURFACE COURSE, TYPE xxx (Leveling Course) | 2012-08 | SP06 R085R | PROJECT SPECIAL PROVISIONS |
| | | SP06R | PATCHING EXISTING PAVEMENT | 2023-10 | SP06 R088R | PROJECT SPECIAL PROVISIONS |
| | | SP08R | SUPPLEMENTAL SURVEYING | 2021-04 | SP08 R003 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | MODIFIED CONCRETE FLUME WITH CONCRETE OUTLET | 2008-06 | SP08 R010 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | HORIZONTAL DRAINS | 2019-12 | SP08 R017 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | CONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET | 2006-07 | SP08 R045 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | CONVRTING EXISTING __TO__ | 2006-07 | SP08 R050 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | REMOVAL AND STOCKPILE OF EXISTING GUARDRAIL | 2006-07 | SP08 R055 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | GUARDRAIL END UNITS, TYPE TL-2 | 2023-05 | SP08 R064 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | GUARDRAIL END UNITS, TYPE TL-3 | 2023-05 | SP08 R065 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | GUARDRAIL ANCHOR UNITS AND TEMPORARY GUARDRAIL ANCHOR UNITS | 2018-01 | SP08 R070 | PROJECT SPECIAL PROVISIONS |
| | | SP08 | IMPACT ATTENUATOR UNITS, TYPE TL-3 | 2023-10 | SP08 R075 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | TEMPORARY WOVEN WIRE FENCE | 2016-01 | SP08 R085 | PROJECT SPECIAL PROVISIONS |
| | | SP08R | ADJUSTMENT OF OVERSIZED MANHOLES | 2022-11 | SP08 R094R | PROJECT SPECIAL PROVISIONS |
| | | SP08R | ADJUSTMENT OF MANHOLES | 2012-08 | SP08 R095R | PROJECT SPECIAL PROVISIONS |
| | | SP08R | ADJUSTMENT TO MANHOLES | 2012-08 | SP08 R096R | PROJECT SPECIAL PROVISIONS |
| | | SP08R | ADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES | 2012-08 | SP08 R097R | PROJECT SPECIAL PROVISIONS |
| | | SP08R | ADJUSTMENT OF CATCH BASINS, DROP INLETS, MANHOLES, METER BOXES AND VALVE BOXES | 2022-11 | SP08 R098R | PROJECT SPECIAL PROVISIONS |
| | | SP08R | CHAIN LINK FENCE w/ BARBED WIRE ON EXTENSION ARMS | 1995-07 | SP08 R100 | PROJECT SPECIAL PROVISIONS |
| | | SP09R | FOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES | 2018-01 | SP09 R005 | SP09 R005 |
| | | SP09R | OVERHEAD AND DYNAMIC MESSAGE SIGN FOUNDATIONS | 2018-01 | SP09 R007 | SP09 R007 |
| | | SP10R | PORTLAND CEMENT CONCRETE PRODUCTION AND DELIVERY | 2020-09 | SP10 R001 | PROJECT SPECIAL PROVISIONS |
| | | SP10R | HIGH STRENGTH CONCRETE FOR DRIVEWAYS | 2012-01 | SP10 R002 | PROJECT SPECIAL PROVISIONS |
| | | SP10R | THERMOPLASTIC INTERMIXED BEAD TESTING | 2022-07 | SP10 R004 | PROJECT SPECIAL PROVISIONS |
| | | SP10R | THERMOPLASTIC COLOR TESTING | 2019-03 | SP10 R005 | PROJECT SPECIAL PROVISIONS |
| | | SP10R | POLYUREA - TYPE 2 TYPICAL CERTIFIED MILL TEST REPORT | 2019-03 | SP10 R006 | PROJECT SPECIAL PROVISIONS |
| | | SP10R | NON-CAST IRON SNOWPLOWABLE PAVEMENT MARKERS | 2021-11 | SP10 R008 | PROJECT SPECIAL PROVISIONS |
| | | SP10R | MATERIALS FOR PORTLAND CEMENT CONCRETE | 2020-09 | SP10 R024 | PROJECT SPECIAL PROVISIONS |
| | | SP10R | GEOSYNTHETICS | 2023-04 | SP10 R056 | PROJECT SPECIAL PROVISIONS |
| | | SP11R | TEMPORARY SHORING | 2021-10 | SP11 R002 | PROJECT SPECIAL PROVISIONS |
| | | SP11R | MATERIAL AND EQUIPMENT STORAGE & PARKING OF PERSONAL VEHICLES | 2022-08 | SP11 R003 | PROJECT SPECIAL PROVISIONS |
| | | SP11R | WORK ZONE INSTALLER | 2022-08 | SP11 R004 | PROJECT SPECIAL PROVISIONS |
| | | SP11R | PORTABLE CHANGEABLE MESSAGE SIGNS | 2022-11 | SP11 R010 | PROJECT SPECIAL PROVISIONS |
| | | SP11R | REMOVE AND RESET WATER FILLED BARRIER | 2018-01 | SP11 R025 | PROJECT SPECIAL PROVISIONS |
| | | SP11R | LAW ENFORCEMENT | 2022-11 | SP11 R030 | PROJECT SPECIAL PROVISIONS |
| | | SP12R | EXTRUDED THERMOPLASTIC PAVEMENT MARKING THICKNESS | 2022-06 | SP12 R005 | PROJECT SPECIAL PROVISIONS |
| | | SP14R | ROADWAY LIGHTING FOUNDATIONS | 2018-01 | SP14 R004 | SP14 R004 |
| | | SP14R | PORTABLE CONSTRUCTION LIGHTING | 2022-04 | SP14 R013 | PROJECT SPECIAL PROVISIONS |
| | | SP16R | PERMANENT SEEDING AND MULCHING | 1995-07 | SP16 R002 | PROJECT SPECIAL PROVISIONS |
| | | SP16R | EROSION AND STORMWATER CONTROL FOR SHOULDER | 2020-01 | SP16 R003R | PROJECT SPECIAL PROVISIONS |
| | | SP16R | E&SC/SW for Shoulder Construction/Reconstruction | | SP16 R03R | E&SC/SW for Shoulder Construction/Reconstruction SP16 R03R |
| | | Z | PERMITS COVER (Delete Not Applicable Information) | 2023-09 | Z001 | Z001 |
| | | Z | PERMIT COVER (No Additional Permits) | 2023-09 | Z001A | Z001A |
| | | Z | AVAILABILITY OF FUNDS | 2008-05 | Z002 | AVAILABILITY OF FUNDS |
| | | Z | SEED QUALITY (Use ONLY if seeding is required on project) | 2011-05 | Z003 | SEED QUALITY |
| | | Z | ERRATA | 2023-06 | Z004 | Standard Special Provision Errata |
| | | Z | Plant Pest Quarantine | 2019-05 | Z004A | |
| | | Z | MINIMUM WAGE (State Funded) | 2009-07 | Z005 | MINUMUM WAGE |
| | | Z | TITLE VI AND NONDISCRIMINATION | 2018-06 | Z006 | TITLE VI AND NONDISCRIMINATION |
| | | Z | MINORITY AND FEMALE EMPLOYMENT (Prime Contractor Company wide) | 2000-00 | Z007 | MINORITY AND FEMALE EMPLOYMENT REQUIREMENTS |
| | | Z | FHWA 1273 | 2023-10 | Z008 | FHWA 1273 |
| | | Z | On the Job Training - USE ON ALL PROJECTS | 2015-04 | Z010 | ON-THE-JOB TRAINING |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2023-01 | Z086 | Z086 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2023-01 | Z087 | Z087 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2023-01 | Z088 | Z088 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2023-01 | Z089 | Z089 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2023-01 | Z090 | Z090 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2023-01 | Z091 | Z091 |
| | | Z | LISTING OF DBE SUBCONTRACTORS (Federal Aid - Paper Bid) | 2015-04 | Z110 | LISTING OF DBE SUBCONTRACTORS (Federal Aid - Paper Bid) |
| | | Z | LISTING OF MBE/WBE SUBCONTRACTORS (State Funded - Paper Bid) | 2015-04 | Z115 | LISTING OF MBE/WBE SUBCONTRACTORS (State Funded - Paper Bid) |
| | | Z | PAYMENT BOND FORMS | 2012-11 | Z118 | Z118 |
| | | Z | PERFORMANCE BOND FORMS | 2012-11 | Z120 | Z120 |
| | | Z | Bid Bond Form | 2023-10 | Z122 | Z122 |
| | | Z | ADDENDA | 2023-10 | Z124 | Z124 |
| | | Z | Execution of Bid | 2023-10 | Z135 | Non-Collusion, Debarment and Gift Ban Certification PreBid |
| | | Z | Signature Sheet (Central Let) | 2012-01 | Z140 | Z140 |
| | | Z | Greenways | 2014-02 | Z200 | BP1_Greenways (Do Not Modify) |