• I-5719FC
    • StatusAwarded
    • DateSep 26, 2025
    • TypeDesign

    Project Description

     Develop 10 miles of ITS infrastructure along I-85 from the South Carolina line to US 74 and install various ITS infrastructure and connection to the existing NCDOT fiber from US 74 to US 321.

 Get Started

No content found
No content found
No content found
Was this page helpful?