• N.C. Airport Pavement Maintenance Contract

    The North Carolina Department of Transportation Division of Aviation maintains two contracts involving airfield maintenance activities at various North Carolina publicly owned, publicly used airports statewide.  These contracts are both one-year term contracts that are renewable for up to three years.

    The two contracts are identical in all aspects with the exception of one contract is for airports West of US 1 and the other contract is for the airports East of US 1.
     
    Activities include:​

    • Full depth asphalt patching
    • Crack sealing
    • Concrete & asphalt pavement repair
    • Joint sealing, sealing/rejuvenation
    • Rubber removal
    • Airfield painting​

    • Marking removal
    • Pressure washing
    • Micro-surfacing
    • Polyurethane foam systems
    • Seeding and mulching​
 

 2010-2013 Contracts

 
 

 2007-2010 Contracts

 
 

 Additional Resources

 
  • LEDGA Software

    Analytical software based on layered elastic design theory for evaluating General Aviation airport pavement strength and "overload" operations.

    LEDGA version 1.2 software and documentation is available for downloading here. You may also call the NCDOT/Aviation office at 919-840-0112 for a copy of the software on diskette or Contact Us.​

Was this page helpful?