| | | | Addition to plan | Durham | SR 1118 | Mutual Drive | George Street | 0.99 | Resurfacing | Mill 2.0" and 2.0" S9.5B | Treated by Another Project |
| | | | Addition to plan | Durham | SR 1621 | SR 1616 | Dead End | 1.1 | Preservation | Seal - Double | Accelerated Pavement Deterioration |
| | | | Addition to plan | Durham | Tallwood Dr | Carpenter Pond Rd | WAKE CO | 0.08 | Resurfacing | 1.5" SF9.5A | Proximity of Other Planned Work |
| | | FY 2017 | Defer to future year | Durham | SR 1670 | SR 1675 | SR 1637 | 3.52 | Resurfacing | Mill 1.5" and 1.5" S9.5B | Relative Pavement Condition |
| | | FY 2017 | Defer to future year | Durham | SR 1838 | SR 1800 | NC 98 | 1.46 | Resurfacing | Mill 1.5" and 1.5" S9.5B | Relative Pavement Condition |
| | | FY 2018 | Advancement from future year | Franklin | SR 1418 | SR 1002 | NC 561 | 3 | Resurfacing | Full Depth Patching and 1.5" S9.5B | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | FY 2018 | Advancement from future year | Franklin | SR 1438 | SR 1436 | NC 561 | 2.1 | Resurfacing | Full Depth Patching and 1.5" S9.5B | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | FY 2018 | Advancement from future year | Franklin | SR 1611 | SR 1609 | SR 1636 | 2.33 | Resurfacing | Full Depth Patching and 1.5" S9.5B | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | FY 2017 | Advancement to past year | Franklin | SR 1770 | WAKE CO | NASH CO | 5.734 | Resurfacing | Full Depth Patching and 1.5" S9.5B | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | FY 2017 | Defer to future year | Franklin | NC 56 | SR 1222 | US 401 | 4.722 | Resurfacing | Full Depth Patching and 1.5" S9.5B | Relative Pavement Condition |
| | | FY 2017 | Defer to future year | Franklin | SR 1467 | SR 1425 | NC 56 | 2.86 | Preservation | Seal - Double | Relative Pavement Condition |
| | | FY 2017 | Defer to future year | Franklin | SR 1470 | NC 56 | SR 1425 | 1.58 | Resurfacing | Full Depth Patching and 1.25" SF9.5A | Relative Pavement Condition |
| | | | Addition to plan | Granville | SR 1300 | SR 1436 | NC 96 | 9.334 | Preservation | Microsurface | Proximity of Other Planned Work |
| | | | Addition to plan | Person | Hazel Lawson Rd | SR 1542 | SR 1542 | 1.386 | Preservation | Seal - Double | Accelerated Pavement Deterioration |
| | | | Addition to plan | Person | Jack Hambrick Rd | SR 1336 | SR 1336 | 1.31 | Preservation | Seal - Double | Accelerated Pavement Deterioration |
| | | FY 2017 | Defer to future year | Person | SR 1216 | SR 1131 | Dead End | 0.297 | Preservation | Seal - Double | Exhausted Funds (Higher than Anticipated Bids; Material Prices; Etc) |
| | | FY 2017 | Defer to future year | Person | SR 1578 | US 158 | Cul-de-sac | 0.404 | Preservation | Seal - Double | Exhausted Funds (Higher than Anticipated Bids; Material Prices; Etc) |
| | | FY 2018 | Advancement from future year | Vance | US 1 | FRANKLIN CO | I-85 project limits | 15.1 | Resurfacing | 1.5" S9.5B | Proximity of Other Planned Work |
| | | FY 2017 | Defer to future year | Vance | SR 1100 | US 1 | SR 1101 | 4.485 | Preservation | Seal - Double and Fog Seal | Relative Pavement Condition |
| | | FY 2017 | Defer to future year | Vance | SR 1106 | SR 1101 | Cul- de-sac | 0.76 | Preservation | Seal - Double and Fog Seal | Relative Pavement Condition |
| | | FY 2017 | Defer to future year | Vance | SR 1107 | SR 1101 | SR 1110 | 2.891 | Preservation | Seal - Double and Fog Seal | Relative Pavement Condition |
| | | | Addition to plan | Wake | SR 2057 | NC 98 | US 401 | 0.696 | Resurfacing | Full Depth Patching and 1.5" S9.5B | Accelerated Pavement Deterioration |
| | | | Addition to plan | Wake | SR 2135 | SR 2132 | SR 2197 | 0.392 | Resurfacing | 1.5" SF9.5A | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | | Addition to plan | Wake | SR 2136 | SR 2135 | SR 2137 | 0.272 | Preservation | 1.0" S4.75A | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | | Addition to plan | Wake | SR 2137 | SR 2132 | SR 2041 | 0.252 | Preservation | 1.0" S4.75A | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | | Addition to plan | Wake | SR 2197 | SR 2135 | Dead End | 0.173 | Preservation | 1.0" S4.75A | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | | Addition to plan | Wake | SR 2762 | SR 3744 | JOHNSTON CO | 1.59 | Preservation | Seal - Double | Proximity of Other Planned Work |
| | | | Addition to plan | Wake | SR 3514 | SR 2006 | SR 3514 | 1.14 | Resurfacing | 1.5" SF9.5A | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | | Addition to plan | Wake | SR 3547 | SR 2132 | Dead End | 0.116 | Preservation | 1.0" S4.75A | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |
| | | | Addition to plan | Wake | SR 3568 | SR 2000 | END MAINT | 0.42 | Resurfacing | 1.5" SF9.5A | Unexpended Funds (Lower than Anticipated Bids; Material Prices; Etc) |