Sign In
  
  
  
  
  
  
  
  
  
  
  
  
FY 2020Advancement from future yearBertieSR 1513END MAINTNC 308
2
RehabilitationFDR and 1.5" S9.5B and WidenAccelerated Pavement Deterioration
  
FY 2020Advancement from future yearCamdenNC 34US 158Currituck Co
2.757
Resurfacing1.5" S9.5BUnexpended Funds (Lower than Anticipated Bids; Material Prices; Etc)
  
Addition to planGatesSR 1424SR 1002SR 1414
1.38
Resurfacing1.25" SF9.5AProximity of Other Planned Work
  
FY 2023Advancement from future yearHertfordSR 1117Bertie Co LineSR 1118
0.33
Resurfacing1.25" SF9.5AProximity of Other Planned Work
  
FY 2020Advancement from future yearHertfordSR 1153Dead EndSR 1152
0.31
RehabilitationFDR and 1.5" S9.5BAccelerated Pavement Deterioration
  
FY 2020Advancement from future yearHertfordSR 1419SR 1409NC 561
2.29
RehabilitationFDR and 1.5" S9.5B and WidenAccelerated Pavement Deterioration
  
FY 2019Removal from planHertfordNC 461SR 1400SR 1469
2.914
Resurfacing1.5" S9.5BConflicts with Other Projects (STIP; Municipal; Etc)
  
Addition to planPerquimansSR 1468SR 1380DEAD END
0.08
Resurfacing1.5" S9.5BAccelerated Pavement Deterioration