Sign In
  
  
  
  
  
  
  
  
  
  
  
  
Addition to planBrunswickNC 133SR 1190Bridge 14
0.55
ResurfacingMill 1.5" and 1.5" S9.5BProximity of Other Planned Work
  
FY 2023Advancement from future yearBrunswickSR 1190NC 906NC 133
5.26
ResurfacingMill 1.25" and 1.25" S9.5AProximity of Other Planned Work
  
FY 2021Advancement from future yearBrunswickSR 1406PVMT CHGMP 5.4
1.85
ResurfacingFull Depth Patching and 1.25" S9.5AAccelerated Pavement Deterioration
  
FY 2021Advancement from future yearBrunswickSR 1406MP 5.4SR 1407
1.398
ResurfacingFull Depth Patching and 1.25" S9.5AAccelerated Pavement Deterioration
  
FY 2021Advancement from future yearBrunswickSR 1406SR 1407SR 1410
1.83
Resurfacing1.25" SF9.5AAccelerated Pavement Deterioration
  
FY 2019Defer to future yearBrunswickSR 1126SR 1130SR 1119
1.23
Resurfacing1.25" SF9.5AExhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
  
FY 2019Defer to future yearBrunswickSR 1453SR 1430END MAINT
1.4
ResurfacingFull Depth Patching and 1.25" S9.5ADecrease in Funding
  
FY 2019Defer to future yearBrunswickSR 1455SR 1486SR 1426
1.155
RehabilitationMill 1.5" and 1.5" S9.5BDecrease in Funding
  
FY 2019Defer to future yearBrunswickSR 1472SR 1438SR 1486
0.813
ResurfacingMill 1.25" and 2.5" S9.5ADecrease in Funding
  
FY 2019Removal from planBrunswickSR 1478SR 1426END MAINT
0.08
ResurfacingFull Depth Patching and 1.25" S9.5ARoute Removed from State System
  
Addition to planDuplinSR 1108NC 24Sampson County Line
1.25
PreservationPatchingRelative Pavement Condition
  
Addition to planDuplinSR 1300SR 1301SR 1375
1.25
PreservationPatchingRelative Pavement Condition
  
Addition to planDuplinSR 1301NC 24Bridge
0.52
PreservationPatchingRelative Pavement Condition
  
Addition to planDuplinSR 1301SR 1377SR 1398
1.408
PreservationPatchingRelative Pavement Condition
  
Addition to planDuplinSR 1301SR 1351SR 1305
1.03
PreservationPatchingRelative Pavement Condition
  
Addition to planDuplinSR 1715NC 111SR 1824
1.37
PreservationPatchingRelative Pavement Condition
  
Addition to planDuplinSR 1715SR 1824SR 1824
0.77
PreservationPatchingRelative Pavement Condition
  
Addition to planDuplinSR 1724SR 1961SR 1800
0.52
PreservationPatchingRelative Pavement Condition
  
FY 2019Defer to future yearDuplinNC 41SR 1165SR 1154
1.24
ResurfacingMill 1.5" and 1.5" S9.5BProximity of Other Planned Work
  
FY 2019Advancement to past yearNew HanoverSR 1257US 421BEG C&G
0.784
Resurfacing1.5" S9.5AAccelerated Pavement Deterioration
  
Addition to planPenderSR 1523SR 1522NC 53
0.52
ResurfacingPatching and 1.5" S9.5AAccelerated Pavement Deterioration
  
FY 2022Advancement from future yearSampsonNC 411Northern City Limits of GarlandNC 242
12.776
RehabilitationMill 1.5" and 3.0" S9.5BProximity of Other Planned Work
  
FY 2020Advancement from future yearSampsonSR 1435SR 1434NC 242
1.27
Preservation1.0" S4.75AAccelerated Pavement Deterioration
  
FY 2019Defer to future yearSampsonSR 1242dead endNC 242
0.69
Preservation1.0" S4.75AExhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
  
FY 2019Defer to future yearSampsonSR 1248SR 1274SR 1271
0.59
Preservation1.0" S4.75AExhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
  
FY 2019Defer to future yearSampsonSR 1249Begin Maint.SR 1248
0.15
Preservation1.0" S4.75AExhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
  
FY 2019Defer to future yearSampsonSR 1250NC 24SR 1251
0.107
Preservation1.0" S4.75AExhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
  
FY 2019Defer to future yearSampsonSR 1251SR 1254SR 1250
1.79
Preservation1.0" S4.75AExhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
  
FY 2019Defer to future yearSampsonSR 1252NC 24SR 1251
0.223
Preservation1.0" S4.75AExhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
  
FY 2019Defer to future yearSampsonSR 1271SR 1270SR 1251
0.17
Preservation1.0" S4.75AExhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)