Turn on more accessible mode
Turn off more accessible mode
Sign In
Connect NCDOT
Home
Help
Team Sites
Site Map
Connect NCDOT
Doing Business
Bidding & Letting
Projects
Resources
Currently selected
Local Governments
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
HMIP Plans
2020 HMIP Changes - Division 3
Connect NCDOT
>
Resources
>
Asset Management
>
HMIP Plans
Asset Management
Lists
Asset Management Overview
Asset Management Program at NCDOT
Principles/Strategies
Recent
Transportation Asset Management (TAM) Development
HMIP
HMIP Plans
Currently selected
Operations Program Management
Maintenance Condition Assessment Program (MCAP)
Performance Measures
Posted Roads
Secondary Roads and Subdivisions
Outdoor Advertising
Technical Training
Manuals
Disaster Recovery
Interstate Maintenance Preservation Program (IMPP)
State Maintenance Operations
Training Videos
Resources
Pavement Management
Environmental
Geotechnical
GIS
Hydraulics
Materials & Tests
Contract Standards
Mapping Resources
Logistics and Freight
Photogrammetry
Rail Division Resources
Roadside Environmental
Structures
Transportation Mobility and Safety
New Plan Yr
Original Plan Year
Change Type
County
RTE
Begin Description
End Description
Length
Budget Group
Treatment
Justification
FY 2020
Addition to plan
Brunswick
SR 1116
END PVMT
PVMT
0.34
Resurfacing
Full Depth Patching and 1.25" S9.5A
Relative Pavement Condition
FY 2020
Addition to plan
Brunswick
SR 1116
CHG PVMTPV
NC 130
0.775
Resurfacing
Full Depth Patching and 1.25" S9.5A
Relative Pavement Condition
FY 2020
Addition to plan
Brunswick
SR 1116
NC 130
MP 4.20
3.1
Resurfacing
Full Depth Patching and 1.25" S9.5A
Relative Pavement Condition
FY 2020
Addition to plan
Brunswick
SR 1116
MP 4.20
END MAINT
1.94
Resurfacing
Full Depth Patching and 1.25" S9.5A
Relative Pavement Condition
FY 2020
FY 2021
Advancement from future year
Brunswick
SR 1437
SR 1472
WIDTH CHG
1.246
Resurfacing
1.5" S9.5B
Accelerated Pavement Deterioration
FY 2020
FY 2021
Advancement from future year
Brunswick
SR 1437
WIDTH CHG
US 74
0.25
Resurfacing
1.5" S9.5B
Accelerated Pavement Deterioration
FY 2020
FY 2021
Advancement from future year
Brunswick
SR 1437
WIDTH CHG
SR 1438
1.348
Resurfacing
1.5" S9.5B
Accelerated Pavement Deterioration
FY 2020
FY 2021
Advancement from future year
Brunswick
SR 1441
SR 1426
SR 1472
0.625
Resurfacing
Full Depth Patching and 1.25" S9.5A
Proximity of Other Planned Work
FY 2020
FY 2021
Advancement from future year
Brunswick
SR 1446
SR 1414
DEAD END
0.687
Resurfacing
Full Depth Patching and 1.25" S9.5A
Proximity of Other Planned Work
FY 2020
FY 2021
Advancement from future year
Brunswick
SR 1455
SR 1486
SR 1426
1.156
Rehabilitation
Mill 1.5" and 1.5" S9.5B
Proximity of Other Planned Work
FY 2020
FY 2021
Advancement from future year
Brunswick
SR 1472
SR 1438
SR 1486
0.813
Resurfacing
Mill 1.25" and 2.5" S9.5A
Proximity of Other Planned Work
FY 2020
FY 2021
Advancement from future year
Brunswick
SR 1486
SR 1472
SR 1472
0.141
Resurfacing
Full Depth Patching and 1.25" S9.5A
Proximity of Other Planned Work
FY 2019
FY 2020
Advancement to past year
Brunswick
SR 1116
END PVMT
PVMT CHG
0.34
Preservation
Full Depth Patching
Accelerated Pavement Deterioration
FY 2019
FY 2020
Advancement to past year
Brunswick
SR 1116
CHG PVMTPV
NC 130
0.775
Preservation
Full Depth Patching
Accelerated Pavement Deterioration
FY 2025
FY 2020
Defer to future year
Brunswick
NC 179 Bus
NC 179
NC 179
3.62
Resurfacing
Leveling and 1.5" S9.5B
Decrease in Funding
FY 2025
FY 2020
Defer to future year
Brunswick
NC 179 Bus
NC 179
NC 179
0.066
Resurfacing
Leveling and 1.5" S9.5B
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1126
SR 1130
SR 1119
1.23
Rehabilitation
Mill 1.25" and 1.25" S9.5B
Exhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1128
SR 1115
SR 1119
1.24
Rehabilitation
Mill 1.25" and 1.25" S9.5B
Exhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1129
SR 1115
SR 1130
1.602
Rehabilitation
Mill 1.25" and 1.25" S9.5B
Exhausted Funds (Higher than Anticipated Bids; Material Prices; Etc)
FY 2023
FY 2020
Defer to future year
Brunswick
SR 1329
SR 1330
SR 1328
0.505
Resurfacing
1.25" SF9.5A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1335
SR 1340
SR 1339
0.333
Resurfacing
Full Depth Patching and 1.25" S9.5A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1335
SR 1339
MP 8.3
2.673
Rehabilitation
Mill 1.25" and 1.25" S9.5A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1335
MP 8.30
SR 1331
2.342
Rehabilitation
Mill 1.25" and 1.25" S9.5A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1335
SR 1331
SR 1332
1.343
Rehabilitation
Mill 1.25" and 1.25" S9.5A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1335
SR 1332
NC 130
1.075
Rehabilitation
Mill 1.25" and 1.25" S9.5A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1549
NC 211
END MAINT
0.36
Preservation
1.0" S4.75A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1559
SR 1549
SR 1560
0.07
Preservation
1.0" S4.75A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1560
SR 1559
END MAINT
0.09
Preservation
1.0" S4.75A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1561
SR 1549
SR 1562
0.06
Preservation
1.0" S4.75A
Decrease in Funding
FY 2022
FY 2020
Defer to future year
Brunswick
SR 1562
SR 1561
END MAINT
0.15
Preservation
1.0" S4.75A
Decrease in Funding
1 - 30
Follow
javascript: SP.SOD.executeFunc('followingcommon.js', 'FollowDoc', function() { FollowDoc('{ListId}', {ItemId}); });
0x0
0x0
ContentType
0x01
1100
Compliance Details
javascript:if (typeof CalloutManager !== 'undefined' && Boolean(CalloutManager) && Boolean(CalloutManager.closeAll)) CalloutManager.closeAll(); commonShowModalDialog('{SiteUrl}'+ '/_layouts/15/itemexpiration.aspx' +'?ID={ItemId}&List={ListId}', 'center:1;dialogHeight:500px;dialogWidth:500px;resizable:yes;status:no;location:no;menubar:no;help:no', function GotoPageAfterClose(pageid){if(pageid == 'hold') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/hold.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'audit') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Reporting.aspx' +'?Category=Auditing&backtype=item&ID={ItemId}&List={ListId}'); return false;} if(pageid == 'config') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/expirationconfig.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'tag') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Hold.aspx' +'?Tag=true&ID={ItemId}&List={ListId}'); return false;}}, null);
0x0
0x1
ContentType
0x01
898
Document Set Version History
/_layouts/15/images/versions.gif?rev=43
javascript:SP.UI.ModalDialog.ShowPopupDialog('{SiteUrl}'+ '/_layouts/15/DocSetVersions.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
330
Send To other location
/_layouts/15/images/sendOtherLoc.gif?rev=43
javascript:GoToPage('{SiteUrl}' + '/_layouts/15/docsetsend.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
350
© North Carolina Dept. of Transportation |
Privacy Statement
|
Accessibility