1
2024
  
2900Grass MowingRoadside
53,634.76
SHM
$4,558,954.60
1
2024
  
2920Rest Areas & Welcome Centers OperationsRoadside
966,000
DOL
$966,000.00
1
2024
  
3104Litter RemovalGMR
2,540.87
SHM
$1,519,440.26
1
2024
  
3104Litter RemovalRoadside
11,364
SHM
$659,112.00
1
2024
  
3108Drainage Ditch MaintenanceGMR
604.25
SHM
$1,510,625.00
1
2024
  
3109Maintenance of Shoulders AND DitchesGMR
506.812
SHM
$2,534,060.00
1
2024
  
3112Shoulder Maintenance / ReconstructionGMR
405.9
SHM
$1,075,635.00
1
2024
  
3126Install Pipes (48” or Less)GMR
6,787
LFT
$2,375,450.00
1
2024
  
3128Maint / Repair Pipes (48” or less)GMR
142
EA
$159,040.00
1
2024
  
3138Machining Unpaved RoadGMR
2,192.45
RML
$602,923.75
1
2024
  
3140Unpaved Road Stabilization Surface MaintenanceGMR
5,830
TON
$757,900.00
1
2024
  
3236Traffic Signal Routine MaintenanceGMR
257
EA
$154,200.00
1
2024
  
3250Installation of Ground Mounted SignsGMR
21,645
SFT
$865,800.00
1
2024
  
3300Install Non NBIS >48” Up To NBIS StructuresGMR
220
LFT
$550,000.00
1
2024
  
3314Maintain / Repair Steel Superstructure ComponentsBridge Pres
80
LFT
$680,000.00
1
2024
  
3316Maintenance of Timber RailBridge Pres
100
LFT
$50,000.00
1
2024
  
3326Maintain Concrete DeckBridge Pres
40
SFT
$4,000.00
1
2024
  
3336Moveable Bridges (Maintenance)Bridge Pres
1,300
HR
$71,500.00
1
2024
  
3338Moveable Bridges (Operations)GMR
300,000
DOL
$300,000.00
1
2024
  
3342Clean and Paint Structural SteelBridge Pres
419
SFT
$83,800.00
1
2024
  
3352Maint Slope ProtectionBridge Pres
4,000
SFT
$300,000.00
1
2024
  
3366Drift and Debris RemovalBridge Pres
1,000
HR
$150,000.00
1
2024
  
3376Clean / Wash Bridge DecksBridge Pres
330,827
SFT
$396,992.40
1
2025
  
2900Grass MowingRoadside
53,634.76
SHM
$4,558,954.60
1
2025
  
2912Mechanical Brush and Tree ControlGMR
192
SHM
$105,600.00
1
2025
  
2920Rest Areas & Welcome Centers OperationsRoadside
966,000
DOL
$966,000.00
1
2025
  
3104Litter RemovalGMR
2,403
SHM
$1,436,994.00
1
2025
  
3104Litter RemovalRoadside
11,364
SHM
$659,112.00
1
2025
  
3108Drainage Ditch MaintenanceGMR
636.79
SHM
$1,591,975.00
1
2025
  
3109Maintenance of Shoulders AND DitchesGMR
613.103
SHM
$3,065,515.00
1
2025
  
3112Shoulder Maintenance / ReconstructionGMR
489.14
SHM
$1,296,221.00
1
2025
  
3126Install Pipes (48” or Less)GMR
4,523
LFT
$1,583,050.00
1
2025
  
3128Maint / Repair Pipes (48” or less)GMR
158
EA
$176,960.00
1
2025
  
3138Machining Unpaved RoadGMR
2,183.521
RML
$600,468.28
1
2025
  
3140Unpaved Road Stabilization Surface MaintenanceGMR
4,625
TON
$601,250.00
1
2025
  
3236Traffic Signal Routine MaintenanceGMR
257
EA
$154,200.00
1
2025
  
3250Installation of Ground Mounted SignsGMR
21,645
SFT
$865,800.00
1
2025
  
3300Install Non NBIS >48” Up To NBIS StructuresGMR
220.8
LFT
$552,000.00
1
2025
  
3314Maintain / Repair Steel Superstructure ComponentsBridge Pres
80
LFT
$680,000.00
1
2025
  
3316Maintenance of Timber RailBridge Pres
100
LFT
$50,000.00
1
2025
  
3326Maintain Concrete DeckBridge Pres
40
SFT
$4,000.00
1
2025
  
3336Moveable Bridges (Maintenance)Bridge Pres
1,300
HR
$71,500.00
1
2025
  
3338Moveable Bridges (Operations)GMR
298,000
DOL
$298,000.00
1
2025
  
3342Clean and Paint Structural SteelBridge Pres
419
SFT
$83,800.00
1
2025
  
3352Maint Slope ProtectionBridge Pres
4,000
SFT
$300,000.00
1
2025
  
3366Drift and Debris RemovalBridge Pres
1,000
HR
$150,000.00
1
2025
  
3376Clean / Wash Bridge DecksBridge Pres
330,827
SFT
$396,992.40
1
2026
  
2900Grass MowingRoadside
53,635
SHM
$4,558,975.00
1
2026
  
2920Rest Areas & Welcome Centers OperationsRoadside
966,000
DOL
$966,000.00
1
2026
  
3104Litter RemovalGMR
2,500
SHM
$1,495,000.00
1
2026
  
3104Litter RemovalRoadside
300
SHM
$17,400.00
1
2026
  
3108Drainage Ditch MaintenanceGMR
600
SHM
$1,500,000.00
1
2026
  
3109Maintenance of Shoulders AND DitchesGMR
500
SHM
$2,500,000.00
1
2026
  
3112Shoulder Maintenance / ReconstructionGMR
400
SHM
$1,060,000.00
1
2026
  
3126Install Pipes (48” or Less)GMR
6,780
LFT
$2,373,000.00
1
2026
  
3128Maint / Repair Pipes (48” or less)GMR
142
EA
$159,040.00
1
2026
  
3138Machining Unpaved RoadGMR
2,190
RML
$602,250.00
1
2026
  
3140Unpaved Road Stabilization Surface MaintenanceGMR
5,830
TON
$757,900.00
1
2026
  
3236Traffic Signal Routine MaintenanceGMR
257
EA
$154,200.00
1
2026
  
3250Installation of Ground Mounted SignsGMR
21,645
SFT
$865,800.00
1
2026
  
3300Install Non NBIS >48” Up To NBIS StructuresGMR
220
LFT
$550,000.00
1
2026
  
3314Maintain / Repair Steel Superstructure ComponentsBridge Pres
80
LFT
$680,000.00
1
2026
  
3316Maintenance of Timber RailBridge Pres
100
LFT
$50,000.00
1
2026
  
3326Maintain Concrete DeckBridge Pres
40
SFT
$4,000.00
1
2026
  
3336Moveable Bridges (Maintenance)Bridge Pres
1,300
HR
$71,500.00
1
2026
  
3338Moveable Bridges (Operations)GMR
300,000
DOL
$300,000.00
1
2026
  
3342Clean and Paint Structural SteelBridge Pres
420
SFT
$84,000.00
1
2026
  
3352Maint Slope ProtectionBridge Pres
4,000
SFT
$300,000.00
1
2026
  
3366Drift and Debris RemovalBridge Pres
1,000
HR
$150,000.00
1
2026
  
3376Clean / Wash Bridge DecksBridge Pres
330,800
SFT
$396,960.00
1
2027
  
2900Grass MowingRoadside
53,635
SHM
$4,558,975.00
1
2027
  
2920Rest Areas & Welcome Centers OperationsRoadside
966,000
DOL
$966,000.00
1
2027
  
3104Litter RemovalGMR
2,500
SHM
$1,495,000.00
1
2027
  
3104Litter RemovalRoadside
300
SHM
$17,400.00
1
2027
  
3108Drainage Ditch MaintenanceGMR
600
SHM
$1,500,000.00
1
2027
  
3109Maintenance of Shoulders AND DitchesGMR
500
SHM
$2,500,000.00
1
2027
  
3112Shoulder Maintenance / ReconstructionGMR
400
SHM
$1,060,000.00
1
2027
  
3126Install Pipes (48” or Less)GMR
6,780
LFT
$2,373,000.00
1
2027
  
3128Maint / Repair Pipes (48” or less)GMR
142
EA
$159,040.00
1
2027
  
3138Machining Unpaved RoadGMR
2,190
RML
$602,250.00
1
2027
  
3140Unpaved Road Stabilization Surface MaintenanceGMR
5,830
TON
$757,900.00
1
2027
  
3236Traffic Signal Routine MaintenanceGMR
257
EA
$154,200.00
1
2027
  
3250Installation of Ground Mounted SignsGMR
21,645
SFT
$865,800.00
1
2027
  
3300Install Non NBIS >48” Up To NBIS StructuresGMR
220
LFT
$550,000.00
1
2027
  
3314Maintain / Repair Steel Superstructure ComponentsBridge Pres
80
LFT
$680,000.00
1
2027
  
3316Maintenance of Timber RailBridge Pres
100
LFT
$50,000.00
1
2027
  
3326Maintain Concrete DeckBridge Pres
40
SFT
$4,000.00
1
2027
  
3336Moveable Bridges (Maintenance)Bridge Pres
1,300
HR
$71,500.00
1
2027
  
3338Moveable Bridges (Operations)GMR
300,000
DOL
$300,000.00
1
2027
  
3342Clean and Paint Structural SteelBridge Pres
420
SFT
$84,000.00
1
2027
  
3352Maint Slope ProtectionBridge Pres
4,000
SFT
$300,000.00
1
2027
  
3366Drift and Debris RemovalBridge Pres
1,000
HR
$150,000.00
1
2027
  
3376Clean / Wash Bridge DecksBridge Pres
330,800
SFT
$396,960.00
1
2028
  
2900Grass MowingRoadside
53,635
SHM
$4,558,975.00
1
2028
  
2920Rest Areas & Welcome Centers OperationsRoadside
966,000
DOL
$966,000.00
1
2028
  
3104Litter RemovalGMR
2,500
SHM
$1,495,000.00
1
2028
  
3104Litter RemovalRoadside
300
SHM
$17,400.00
1
2028
  
3108Drainage Ditch MaintenanceGMR
600
SHM
$1,500,000.00
1
2028
  
3109Maintenance of Shoulders AND DitchesGMR
500
SHM
$2,500,000.00
1
2028
  
3112Shoulder Maintenance / ReconstructionGMR
400
SHM
$1,060,000.00