| 1 | 2022 | | 2900C | Grass Mowing | Roadside | 54,252.788 | SHM | $4,068,959.10 | | 1 | 2022 | | 2920C | Rest Areas & Welcome Centers Operations | Roadside | 851,986 | DOL | $851,986.00 | | 1 | 2022 | | 3104 | Litter Removal | GMR | 5,337.15 | SHM | $1,921,374.00 | | 1 | 2022 | | 3108 | Drainage Ditch Maintenance | GMR | 670.416 | SHM | $2,681,664.00 | | 1 | 2022 | | 3109 | Maintenance of Shoulders AND Ditches | GMR | 586.31 | SHM | $1,583,037.00 | | 1 | 2022 | | 3112 | Shoulder Maintenance / Reconstruction | GMR | 232.51 | SHM | $616,151.50 | | 1 | 2022 | | 3126 | Install Pipes (48” or Less) | GMR | 6,524 | LFT | $1,565,760.00 | | 1 | 2022 | | 3236 | Traffic Signal Routine Maintenance | GMR | 257 | EA | $308,400.00 | | 1 | 2022 | | 3250 | Installation of Ground Mounted Signs | GMR | 28,555.5555 | SFT | $514,000.00 | | 1 | 2022 | | 3300 | Install Non NBIS >48” Up To NBIS Structures | GMR | 227 | LFT | $317,800.00 | | 1 | 2022 | | 3309C | Replacement of Bridge Expansion Joints | Bridge Pres | 840 | LFT | $420,000.00 | | 1 | 2022 | | 3314 | Maintain / Repair Steel Superstructure Components | Bridge Pres | 52 | LFT | $46,800.00 | | 1 | 2022 | | 3316 | Maintenance of Timber Rail | Bridge Pres | 100 | LFT | $50,000.00 | | 1 | 2022 | | 3336 | Moveable Bridges (Maintenance) | Bridge Pres | 500 | HR | $27,500.00 | | 1 | 2022 | | 3338C | Moveable Bridges (Operations) | GMR | 360,601 | DOL | $360,601.00 | | 1 | 2022 | | 3342 | Clean and Paint Structural Steel | Bridge Pres | 500 | SFT | $100,000.00 | | 1 | 2022 | | 3352 | Maint Slope Protection | Bridge Pres | 20,000 | SFT | $600,000.00 | | 1 | 2022 | | 3376 | Clean / Wash Bridge Decks | Bridge Pres | 2,500,000 | SFT | $250,000.00 | | 1 | 2022 | | 3376C | Clean / Wash Bridge Decks | Bridge Pres | 13,150,368 | SFT | $263,007.36 | | 1 | 2022 | | 2080 | Construction Plan Preparation | GMR | 0 | - | $7,000.00 | | 1 | 2022 | | 2330 | Utility Relocations | GMR | 0 | - | $200,000.00 | | 1 | 2022 | | 2620 | INSPECTION | GMR | 0 | - | $4,000.00 | | 1 | 2022 | | 2640 | Project Management | GMR | 0 | - | $7,000.00 | | 1 | 2022 | | 2712 | Office Engineering | Bridge Pres | 0 | - | $2,000.00 | | 1 | 2022 | | 2712 | Office Engineering | GMR | 0 | - | $134,000.00 | | 1 | 2022 | | 2712 | Office Engineering | Roadside | 0 | - | $3,000.00 | | 1 | 2022 | | 2712C | Office Engineering | GMR | 0 | - | $25,000.00 | | 1 | 2022 | | 2714 | Assessments and Inspections | Bridge Pres | 0 | - | $2,000.00 | | 1 | 2022 | | 2714 | Assessments and Inspections | GMR | 0 | - | $435,000.00 | | 1 | 2022 | | 2714 | Assessments and Inspections | Roadside | 0 | - | $3,000.00 |
|