| | 2025 | 1 | | 3128 | RMIP | Maint / Repair Pipes (48” or less) | 177 | EA | $194,700.00 | | | 2025 | 1 | | 3126 | RMIP | Install Pipes (48” or Less) | 6775 | LFT | $2,371,250.00 | | | 2025 | 1 | | 3316 | RMIP | Maintenance of Timber Rail | 100 | LFT | $50,000.00 | | | 2025 | 1 | | 3140 | RMIP | Unpaved Road Stabilization Surface Maintenance | 23607 | TON | $2,124,630.00 | | | 2025 | 1 | | 3326 | RMIP | Maintain Concrete Deck | 40 | SFT | $4,000.00 | | | 2025 | 1 | | 3342 | RMIP | Clean and Paint Structural Steel | 419 | SFT | $83,800.00 | | | 2025 | 1 | | 2900C | RMIP | Grass Mowing | 22880 | SHM | $2,104,960.00 | | | 2025 | 1 | | 3138 | RMIP | Machining Unpaved Road | 2998.188 | RML | $2,248,641.00 | | | 2025 | 1 | | 3336 | RMIP | Moveable Bridges (Maintenance) | 1300 | HR | $130,000.00 | | | 2025 | 1 | | 3236 | RMIP | Traffic Signal Routine Maintenance | 257 | EA | $385,500.00 | | | 2025 | 1 | | 3104C | RMIP | Litter Removal | 15250 | SHM | $884,500.00 | | | 2025 | 1 | | 3126C | RMIP | Install Pipes (48” or Less) | 4511 | LFT | $6,089,850.00 | | | 2025 | 1 | | 2920C | RMIP | Rest Areas & Welcome Centers Operations | 966000 | DOL | $966,000.00 | | | 2026 | 1 | | 2908 | RMIP | Brush and Tree Control /Herbicides | 1942 | SHM | $679,700.00 | | | 2025 | 1 | | 3226C | RMIP | Long Line Specialty Material Pavement Markings | 6069107.143 | LFT | $4,248,375.00 | | | 2025 | 1 | | 3104 | RMIP | Litter Removal | 2558 | SHM | $895,300.00 | | | 2025 | 1 | | 3338C | RMIP | Moveable Bridges (Operations) | 300000 | DOL | $300,000.00 | | | 2025 | 1 | | 2900C | RMIP | Grass Mowing | 43322 | SHM | $3,985,624.00 | | | 2026 | 1 | | 2912 | RMIP | Mechanical Brush and Tree Control | 185.5 | SHM | $352,450.00 | | | 2025 | 1 | | 3300 | RMIP | Install Non NBIS >48” Up To NBIS Structures | 650 | LFT | $1,950,000.00 | | | 2025 | 1 | | 3314 | RMIP | Maintain / Repair Steel Superstructure Components | 20 | LFT | $170,000.00 | | | 2025 | 1 | | 3352 | RMIP | Maint Slope Protection | 2520 | SFT | $378,000.00 | | | 2025 | 1 | | 3250 | RMIP | Installation of Ground Mounted Signs | 21645 | SFT | $541,125.00 | | | 2026 | 1 | | 3104 | RMIP | Litter Removal | 3325 | SHM | $1,163,750.00 | | | 2025 | 1 | | 2908 | RMIP | Brush and Tree Control /Herbicides | 1943 | SHM | $680,050.00 | | | 2025 | 1 | | 3366 | RMIP | Drift and Debris Removal | 1000 | HR | $150,000.00 | | | 2025 | 1 | | 2912 | RMIP | Mechanical Brush and Tree Control | 192 | SHM | $364,800.00 | | | 2025 | 1 | | 3108 | RMIP | Drainage Ditch Maintenance | 570.008 | SHM | $1,026,014.40 | | | 2025 | 1 | | 3376 | RMIP | Clean / Wash Bridge Decks | 101035 | SFT | $121,242.00 | | | 2025 | 1 | | 3109 | RMIP | Maintenance of Shoulders AND Ditches | 1040.615 | SHM | $3,642,152.50 |
|