| | | | Addition | Brunswick | US 17 | SC STATE LINE | MP 7.10 | 7.1 | Resurfacing | 1.5" S9.5C | System Plan 2016 is actual 2017 Plan |
| | | | Addition | Brunswick | US 17 S | MP 41.038 | SC STATE LINE | 6.147 | Resurfacing | 1.5" S9.5C | System Plan 2016 is actual 2017 Plan. MP 40.057 - MP 41.038 not in GIS as Divided Hwy |
| | | | Addition | Brunswick | NC 87 | NC 211 | MP 2.27 | 2.27 | Resurfacing | 1.5" S9.5B | System Plan 2016 is actual 2017 Plan |
| | | | Addition | Brunswick | SR 1139 | SR 1137 | NC 130 | 2.876 | Resurfacing | 1.5" S9.5B | System Plan 2016 is actual 2017 Plan |
| | | | Addition | Brunswick | SR 1177 | END MAINT | END MAINT | 1.615 | Resurfacing | MILL & FILL 1.5" S9.5B | ADDITIONAL FUNDS |
| | | | Addition | Brunswick | SR 1542 | NC 211 | END MAINT | 0.189 | Resurfacing | 1.25" SF9.5A | System Plan 2016 is actual 2017 Plan |
| | | | Addition | Brunswick | SR 1813 | MP 0.063 | SR 1950 | 0.072 | Resurfacing | 1.25" SF9.5A | System Plan 2016 is actual 2017 Plan |
| | | | Addition | Brunswick | SR 1940 | BEG MAINT | SR 1941 | 0.2 | Resurfacing | .75 S4.75A | System Plan 2016 is actual 2017 Plan |
| | | | Addition | Brunswick | SR 1944 | SR 1940 | SR 1942 | 0.16 | Resurfacing | .75 S4.75A | System Plan 2016 is actual 2017 Plan |
| | | FY 2016 | Removal or Deferral | Brunswick | US 74 | Columbus County Line | 0.7403 miles East of SR 1417 | 7.06 | Rehabilitation | Mill 1.5"- 2.5" I19- 1.5" Surface (C Level) with 4' SymWidening | 2016 Plan is Actual 2017 Plan |
| | | FY 2016 | Removal or Deferral | Brunswick | NC 179 | South Carolina State Line | Eastern City Limits of Calabash | 1.71 | Resurfacing | Mill 1.5" & Replace (B Level) | 2016 Plan is Actual 2017 Plan |
| | | FY 2016 | Removal or Deferral | Brunswick | NC 179 | Eastern City Limits of Sunset Beach | Southern City Limits of Shallotte | 7.695 | Resurfacing | 1.5" Overlay (B Level) | 2016 Plan is Actual 2017 Plan |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1191 | SR 1173 | SR 1146 | 2.734 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1191 | BRIDGE | SR 1146 | 1.065 | Resurfacing | 1.0" Overlay (A Level) | Remove - Combined with adjacent section |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1206 | NC 130 | END MAINT | 0.18 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1216 | SR 1139 | SR 1215 | 0.445 | Resurfacing | .75" Sand Asphalt | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1240 | SR 1239 | SR 1241 | 0.12 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1267 | SR 1139 | END MAINT | 0.29 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1288 | SR 1139 | SR 1289 | 0.204 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1289 | SR 1288 | END MAINT | 0.25 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1413 | SR 1411 | BRIDGE | 2.22 | Resurfacing | 1.0" Overlay (A Level) | Deferred to 2019 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1437 | US 74 | SR 1438 | 1.626 | Resurfacing | 1.0" Overlay (A Level) | Deferred to 2019 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1441 | SR 1426 | SR 1472 | 0.625 | Resurfacing | 1.0" Overlay (A Level) | Deferred to 2019 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1501 | SR 1500 | US 17 BUS | 5.56 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1509 | US 17 BUS | END MAINT | 0.514 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2017 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1552 | US 17 | END MAINT | 0.16 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2019 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1568 | US 17 | DEAD END | 0.311 | Resurfacing | 1.25" Overlay (A Level) | Deferred to 2019 |
| | | FY 2016 | Removal or Deferral | Brunswick | SR 1852 | NC 211 | PVMT CHG | 1.318 | Resurfacing | 1.0" Overlay (A Level) | Deferred to 2019 |
| | | | Addition | Duplin | NC 41 | Sampson County | SR 1156 | 5.401 | Rehabilitation | 1.5" S9.5B 2.5" I19.0B | System Plan 2016 is actual 2017 Plan |
| | | | Addition | Duplin | SR 1102 | SR 1125 | SR 1101 | 2.66 | Resurfacing | 1.5" S9.5B | |