- I-77 High Occupancy Toll Lanes
- StatusAwarded
- DateMay 20, 2015
- TypeDesign
 I-77, I-277 (Brookshire Freeway) to Exit 36. Construct High Occupancy Toll (HOT) Lanes and Convert Existing High Occupancy Vehical (HOV) Lanes to High Occupancy Toll (HOT) lanes.
- BD-5101E
- StatusArchived
- DateMay 2, 2011
- TypeDesign
 Replacement of low impact bridges in Bertie, Chowan, and Martin Counties in NCDOT Division 1.
- BD-5101H
- StatusArchived
- DateJan 6, 2012
- TypeDesign
 Replacement of eight (8) low-impact bridges located in Martin County.
- BD-5101F
- StatusArchived
- DateJan 26, 2011
- TypeDesign
 Replacement of six (6) low-impact bridges located in Hertford and Northampton Counties.
- BD-5106D
- StatusArchived
- DateJan 10, 2011
- TypeDesign
 Replacement of ten (10) low-impact bridges located in Bladen, Columbus and Robeson Counties.
- BD-5107E
- StatusArchived
- DateMar 23, 2011
- TypeDesign
 Replacement of seven (7) low-impact bridges located in Alamance, Caswell, Guilford, Orange and Rockingham, Counties.
- BD-5113C
- StatusArchived
- DateJun 9, 2011
- TypeDesign
 Replacement of nine (9) low-impact bridges located in Buncombe, Burke, Madison, Mitchell, and Rutherford Counties.
- EB-4993
- StatusArchived
- DateMay 4, 2010
- TypeDesign
 New Location Neuse River Greenway from the Wake/Johnston County Line to Sam's Branch Creek in Johnston County.
- I-2304AC
- StatusArchived
- DateMay 4, 2010
- TypeDesign
 Reconstruction and widening of I-85 to an 8-lane facility from North of SR 2120 (Long Ferry Road) to approximately 1000 ft south of the existing NC 150 flyover bridge. This project is located in Rowan and Davidson Counties and is roughly 2.2 miles in length.
- I-2304AD
- StatusArchived
- DateJan 26, 2011
- TypeDesign
 Reconstruction of I-85 to an 8-lane facility from North of NC 150 to just North of I-85 Business. This project is located in Davidson County and is roughly 3.6 miles in length.
- I-4744
- StatusArchived
- DateJul 2, 2009
- TypeDesign
 Widening of I-40 from west of Wade Avenue to east of Jones Franklin Road, a distance of approximately 6.2 miles.
- R-2123CE
- StatusArchived
- DateSep 28, 2010
- TypeDesign
 Modification of the Charlotte Outer Loop (I-485) interchange with I-85, is located in Mecklenburg and Cabarrus Counties.
- R-2583
- StatusArchived
- DateMar 29, 2011
- TypeDesign
 Extend from the Murfreesboro Bypass to US 13, west of Winton, in Hertford County. The proposed improvements consist of widening approximately eight miles of US 158 to a four-lane divided facility with partial control of access.
- R-2606B
- StatusArchived
- DateAug 7, 2008
- TypeDesign
 Project R-2606B is the US 311 Bypass in Randolph County. The project was formerly designated as R-2606B and R-2606C and is the future I-74. The project extends from north of Spencer Road (SR 1929) to US 220 on new location. The total project length is approximately 7.9 miles.
- R-2632AA
- StatusArchived
- DateOct 30, 2009
- TypeDesign
 Widening of NC73 (Sam Furr Road) in Mecklenburg county.
- R-2633AA, R-2633AB
- StatusArchived
- DateMar 1, 2010
- TypeDesign
 Construction of a fully controlled access freeway on new alignment from NC 87 to US 74/US 76 in Brunswick County. The project was formerly designated as R-2633A and is the future I-140.
- R-2823
- StatusArchived
- DateJun 5, 2008
- TypeDesign
 Rocky Mount Northern Outer Loop in Nash County. The project extends from Hunter Hill Road (SR 1604) to US 301 on new location. The total project length is approximately 4.6 miles.
- U-2800
- StatusArchived
- DateJul 26, 2012
- TypeDesign
 Widening of Macy Grove Road to multilanes, extending the roadway on new location to north of East Mountain Street, and converting the grade separation at I-40 Business/US 421 to an interchange.
- B-3174
- StatusArchived
- DateSep 11, 2003
- TypeDesign
 Replacement of Bridge 306 over NC 6 – East Lee Street on US 29-70-220-421 and B-3272, which is the replacement of Bridge 318 over US 29-70-220-421 on McConnell Street.
- B-3463
- StatusArchived
- DateOct 9, 2003
- TypeDesign
 Replacement of Bridge #171 over South Buffalo Creek on SR 2819 and B-3647 is the replacement of Bridge #172 over North Buffalo Creek on SR 2770. Both sites are located in Guilford County.
- B-3835
- StatusArchived
- DateOct 4, 2007
- TypeDesign
 Replacement of Bridge No. 35 on US 158 over the Yadkin River, is located in Davie-Forsyth Counties.
- B-3851
- StatusArchived
- DateFeb 3, 2005
- TypeDesign
 Bridge No. 21 on SR 3163 (Old US 421, Market Street) over US 29/70/220 in Greensboro, NC, has a sufficiency rating of 47.9 out of 100 and is considered functionally obsolete. TIP Project B-3851 will replace this structure and incorporate streetscape elements.
- B-5018
- StatusArchived
- DateNov 18, 2009
- TypeDesign
 Replacement of Bridge #12 over Ahoskie Creek and Bridge #25 over Ahoskie Creek overflow on US 13/NC 42 in Hertford County.
- Haywood County Bridges 111, 180
- StatusArchived
- DateNov 24, 2004
- TypeDesign
 BRIDGES OVER EAST AND WEST FORK OF PIGEON RIVER & APPROACHES
US-276 AND SR-1123.
- I-2511CB
- StatusArchived
- DateDec 2, 2004
- TypeDesign
 Widening of I-85 from North of SR 1002 (Bringle Ferry Road) to North of SR 2120 (Long Ferry Road). This project is located in Rowan County.
- I-2808A
- StatusArchived
- DateJan 11, 2007
- TypeDesign
 I-77 FROM SOUTH OF SR-1125 IN YADKIN COUNTY TO US-21.
- I-3306BB
- StatusArchived
- DateMar 1, 2007
- TypeDesign
 I-40 from just west of the Durham / Orange County Line to just east of NC 147 (Durham Freeway) in Durham County.
- I-3311A
- StatusArchived
- DateNov 8, 2001
- TypeDesign
 I-77 in Mecklenburg County from the I-77 & I-85 interchange North to
North of the Interchange with I-485 (to SR 2117 – Hambright Rd.).
- I-3311D
- StatusArchived
- DateFeb 3, 2005
- TypeDesign
 Widening of northbound I-77 from north of the I-485 interchange
to SR 2136 (Gilead Road -Exit 23). This project is located in Mecklenburg County.
- I-3803A
- StatusArchived
- DateNov 7, 2002
- TypeDesign
 Widening I-85 from 4 to 8 lanes from South of the US 29/NC 49 Connector to
SR 2894 (Speedway/Concord Mills Blvd.) in Mecklenburg-Cabarrus
Counties.
- I-3807
- StatusArchived
- DateJul 11, 2002
- TypeDesign
 Henderson City Limits in Vance County. The project limits begin just south of the I –85 bridge at SR 1218, Graham Avenue, and extend north on SR 1128, Ruin Creek Road to north of the US 158 Bypass.
- I-4401
- StatusArchived
- DateMay 5, 2005
- TypeDesign
 I-40 FROM WEST OF SR 1224 (MONTE VISTA ROAD) TO I-240 IN ASHEVILLE
- R-2248F
- StatusArchived
- DateOct 7, 2004
- TypeDesign
 Widening of I-485 (Charlotte Outer Loop) from west of I-77 to SR 1143 (Brown-Grier / Arrowood Road) from a four-lane divided facility to a
six-lane divided facility with a 46-foot median. The project is located in Mecklenburg County.
- R-2404A
- StatusArchived
- DateJan 6, 2005
- TypeDesign
 4-lane freeway on new location from US 13-17 to East of SR 1503 (Davis Road). The project is located in Bertie County.
- R-2510B
- StatusArchived
- DateFeb 2, 2006
- TypeDesign
 Extends from south of SR 1149 (Price Road) to north of SR 1509 (Springs Road), a distance of approximately 6.8 miles.
- R-2547
- StatusArchived
- DateJun 11, 2002
- TypeDesign
 US64 Knightdale Bypass from East of New Hope Road to existing US64 East of Knightdale.
- R-2616
- StatusArchived
- DateApr 5, 2007
- TypeDesign
 Extends from north of the South Carolina State Line to north of SR 2105 (Marion Lee Road) in Union County, a distance of approximately 10.8 miles.
- R-2641
- StatusArchived
- DateOct 9, 2003
- TypeDesign
 EAST WAKE EXPRESSWAY FROM PROPOSED US-64 BYPASS TO US-64
EAST.
- R-2813B
- StatusArchived
- DateApr 5, 2007
- TypeDesign
 Extends from west of Clayton Road (SR 3501) to east of I-26 in Buncombe County, a distance of approximately 1.0 mile.
- R-4463B
- StatusArchived
- DateNov 2, 2006
- TypeDesign
 Extends from US 70 to NC 43 / NC 55, a distance of approximately 2.5 miles.
- U-3101C
- StatusArchived
- DateDec 2, 2004
- TypeDesign
 Reconstruction and widening of US1/64 from just South of I-40 to US64/SR1009 (Tryon Road) in Wake County.
- U-3311B
- StatusArchived
- DateDec 2, 2004
- TypeDesign
 Widening of SR 1141 (Bingham Drive) from Hope Mills Bypass to North of US 401 (Raeford Road). This project is located in Cumberland County.
- U-3412A
- StatusArchived
- DateDec 6, 2007
- TypeDesign
 Extension of Martin Luther King, Jr. Boulevard (SR 1223) on new location from Lancaster Avenue (NC 200) to Goldmine Road (SR 1162) in Union County.
- Interstate Maintenance
- StatusArchived
- DateDec 21, 2006
- TypeDesign
 The project will include management and performance of routine maintenance activities on interstates in Mecklenburg, Gaston, and Cleveland Counties. The interstate routes include I-77, I-85, I-485, and I-277, for a total, approximate length of 131 centerline miles.
- U-5518
- StatusAnticipated
- DateÂ
- TypeDesign
 US 70 (Glenwood Avenue) from SR 2095 (Page Road Ext) to I-540
(Project discontinued on July 7, 2020. Documents provided below are for information purposes only and subject to change when project is re-advertised in the future.)
- Cape Fear Memorial Bridge
- StatusAnticipated
- DateÂ
- TypeDesign
 REQUEST FOR INFORMATION - ALTERNATE DELIVERY CONTRACT OPTION - Cape Fear Memorial Bridge
- I-2513B and D
- StatusAwarded
- DateMay 14, 2024
- TypeDesign
 I-26 Connector – I-240 / I-26 from north of SR 3548 (Haywood Road) to SR 1781 (Broadway Street); and from SR 1517 (Hill Street) to SR 1781 (Broadway Street)
- Division 5 Multimodal Connected Vehicle Pilot Project - ARCHIVE
- StatusArchived
- DateÂ
- TypeDesign
 Multimodal Connected Vehicle Pilot Project located in Division 5 that will include updating existing infrastructure to support connected vehicle technology. (Project discontinued on July 29, 2022. Documents provided below are for information purposes only and subject to change when project is re-advertised in the future.)
- I-5719B and U-5800
- StatusAdvertised
- DateÂ
- TypeDesign
 I-5719B – I-85 Widening from NC 7 (McAdenville Road / Main Street – Exit 23) to east of NC 273 (Beatty Drive – Exit 27) at the western Catawba River bridge approach. Section B is approximately 4.1 miles.
U-5800 - Intersection Improvements at NC 7 (Main Street) and US 29 / 74 (Wilkinson Boulevard) in Belmont
- Division 8 - US Open
- StatusAwarded
- DateJun 1, 2023
- TypeDesign
 Roadway improvements located along NC 5, US 15 / US 501 and US 1 in Moore County
- HB-0001
- StatusAwarded
- DateÂ
- TypeDesign
 Replacing Bridge No. 7 over Alligator River on US 64 in Tyrrell and Dare Counties
- I-6059
- StatusAwarded
- DateÂ
- TypeDesign
 I-40/I-85 from SR 1981 (Trollingwood-Hawfields Road) in Mebane
- I-6016
- StatusAdvertised
- DateÂ
- TypeDesign
 Interchange improvement at I-85 and I-485 west of Charlotte, Mecklenburg County
- NEVI
- StatusAdvertised
- DateÂ
- TypeDesign
 National Electric Vehicle Infrastructure (NEVI) Program
- Automating Actionable Road Anomalies
- StatusAdvertised
- DateÂ
- TypeDesign
 Develop a system that provides automated, actionable alerts about roadway anomalies (AARA) in Division 6 & Division 14.
- I-5719C
- StatusAdvertised
- DateÂ
- TypeDesign
 Reconstruction of the Piedmont and Northern Railway Mainline, two Norfolk Southern Railway
Mainline bridges and SR 2213 (Groves St.) bridge.
- U-5307A
Â
- Emergency Express DB Solicitation Statewide
- StatusAwarded
- DateMay 22, 2022
- TypeDesign
 Emergency Express Design-Build Solicitation - Multiple Divisions – Statewide
- Logo Program Privatization
- StatusAdvertised
- DateÂ
- TypeDesign
 The Logo Program Privatization Project administers the Logo Program in North
Carolina. The project responsibilities shall include administration, financial,
marketing, customer service, business eligibility administration, business panel
administration, design, construction, inventories, maintenance, project coordination,
data and records management, reporting, and contract transitions for the entire Logo
Program.
- Independent Cost Estimating
- StatusAdvertised
- DateÂ
- TypeDesign
 Provide Independent Cost Estimating for two multi-disciplined CM/GC Projects in Division 10 (I-6016) and Division 12 (I-5719C)
- Helene Emergency Express DB
- StatusAdvertised
- DateÂ
- TypeDesign
 Emergency Express Design-Build Solicitation - Divisions 11, 13 and 14
- Hurricane Helene I-40 Emergency Repair
- StatusAwarded
- DateOct 31, 2024
- TypeDesign
 Highway reconstruction along I-40 Eastbound from the Tennessee State Line to North Carolina Mile Marker 5, in Haywood County.
- US 64 US 74 Chimney Rock Repairs
- StatusAdvertised
- DateÂ
- TypeDesign
 Emergency highway reconstruction from US 74A / NC 9 / US 64 (Main Street) in Chimney Rock, Rutherford County, to west of US 64 (Chimney Rock Road) / US 74A / NC 9 (Gerton Highway) intersection, Henderson County
- US 74A Gerton
- StatusAdvertised
- DateÂ
- TypeDesign
 Highway reconstruction of US 74A from Bearwallow Mountain Road (SR 1693) to Red Anderson Road (SR 1611) in Henderson County
- US 19 W South
- StatusAnticipated
- DateÂ
- TypeDesign
 U.S. 19 W / Little Creek Road / Phillips Road,
Yancey County -9.8 Miles
From SR 1454, Cane River School Road
(35°54'52.6"N 82°23'30.0"W), to SR 1386,
Piney Hill Road (35°59'56.8"N 82°23'08.5"W)
- US 19 W North
- StatusAnticipated
- DateÂ
- TypeDesign
 U.S. 19 W / Will Higgins Road/ Murphytown Road/ Huntdale Road - 13.47 Miles
From SR 1386, Piney Hill Road
(35°59'56.8"N 82°23'08.S"W),
to SR 1343 Murphytown Road
(36°01'29.S"N 82°19'37.6"W)
- NC 197
- StatusAnticipated
- DateÂ
- TypeDesign
 NC 197 from .56 miles South of 19E to SR 1100
- Toe and Nolichucky River Basin
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 01
- StatusAdvertised
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 02
- StatusAdvertised
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 03
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 04
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 05
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 06
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 07
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 09
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 10
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 11
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 12
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB 13 Group 13
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 13
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 14
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 15
- StatusAnticipated
- DateÂ
- TypeDesign
Â
- Helene Emergency Express DB D13 Group 16
- StatusAnticipated
- DateÂ
- TypeDesign
Â