| | DCA_I-5719B-U-5800 (Design-Build) and I-5719C (CMGC) Construction Engineering and Inspection (CEI) -- FINAL (01.15.2025) | 1/15/2025 10:47 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | DEA_Hurricane Helene I-40 Pigeon River Gorge EMERGENCY Repairs Construction Engineering and Inspection (CEI) -- FINAL (01.15.2025) | 1/15/2025 10:47 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | IMD_2025 Integrated Mobility Division LSC -- FINAL (01.15.2025) | 1/15/2025 8:24 AM | rjstroup@ncdot.gov | 30% | 30% | 30% | 10% | 0% |
| | CHE_2025 WESTERN DIVs (8-14) PLANNING and DESIGN ENG SRVCS CONS (PDSC) and GEN ENG SRVCS CONS (GESC) LSC (Additional Firms) -- FINAL (01.01.2025) | 12/31/2024 8:47 AM | rjstroup@ncdot.gov | 45% | 25% | 10% | 20% | 0% |
| | PROGRESSIVE DESIGN BUILD -- Division 13 Toe and Nolichucky River Basin Emergency Repair Designs | 12/18/2024 3:30 PM | | | | | | |
| | PROGRESSIVE DESIGN BUILD -- Division 13 NC 197 Emergency Repair Designs | 12/18/2024 3:28 PM | | | | | | |
| | PROGRESSIVE DESIGN BUILD -- Division 13 US 19W South Emergency Repair Designs | 12/18/2024 3:27 PM | | | | | | |
| | PROGRESSIVE DESIGN BUILD -- Division 13 US 19W North Emergency Repair Designs (with Addendum 1) | 12/18/2024 3:25 PM | | | | | | |
| | CHE_2025 PEF Support for Digital Delivery LSC -- FINAL (12.15.2024) | 12/16/2024 8:46 AM | rjstroup@ncdot.gov | 35% | 15% | 35% | 15% | 0% |
| | FDA_2025 Vessel Construction Oversight LSC -- FINAL (11.15.2024) | 11/15/2024 11:05 AM | rjstroup@ncdot.gov | 50% | 25% | 15% | 10% | 0% |
| | RESCINDED -- DEA_Hurricane Helene I-40 Pigeon River Gorge EMERGENCY Repairs Construction Engineering and Inspection (CEI) — FINAL (11.15.2024) -- RESCINDED (11.27.2024) | 11/15/2024 11:04 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | FMA and ROW_11-15-24 DISPOSAL OF NCDOT RESIDUAL PROPERTY 2025 | 11/15/2024 8:17 AM | | | | | | |
| | DEA_Hurricane Helene US 74-A Gerton CMGC Designer EMERGENCY Repair Designs Project-Specific Contract -- FINAL (11.05.2024) | 11/5/2024 2:48 PM | rjstroup@ncdot.gov | 40% | 10% | 25% | 25% | 0% |
| | Emergency Advertisement Draft RFQ US 74A-NC9-US64 Chimney Rock Progressive Design-Build | 11/1/2024 10:41 AM | | | | | | |
| | FDA_2025 Naval Architecture and Marine Engineering LSC -- FINAL (11.01.2024) | 11/1/2024 10:08 AM | rjstroup@ncdot.gov | 30% | 25% | 20% | 15% | 10% |
| | ARN_2025 Aviation Professional Services LSC -- FINAL (11.01.2024) | 11/1/2024 10:07 AM | rjstroup@ncdot.gov | 15% | 25% | 30% | 30% | 0% |
| | US 74A Gerton CMGC RFLOI - Addendum Number 1 | 10/31/2024 10:08 AM | | | | | | |
| | RLA_2025 Rail Crossing Safety LSC -- FINAL (10.15.2024) -- ADDENDUM No 1 (11.08.2024) | 10/15/2024 11:02 AM | rjstroup@ncdot.gov | 35% | 35% | 25% | 5% | 0% |
| | SIP_2025 Strategic Initiatives and Program Support LSC -- FINAL (10.15.2024) | 10/15/2024 11:01 AM | rjstroup@ncdot.gov | 15% | 25% | 10% | 35% | 15% |
| | RLA_2025 Rail Planning General Services and Rail Strategic Initiatives LSC -- FINAL (10.15.2024) -- ADDENDUM No 2 (11.12.2024) | 10/15/2024 11:01 AM | rjstroup@ncdot.gov | 50% | 50% | 0% | 0% | 0% |
| | D5A_P-5715 Construction Engineering and Inspection (CEI) -- FINAL (10.15.2024) | 10/15/2024 11:00 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | Hurricane Helene I-40 Pigeon River Gorge Emergency Repair CMGC - RFLOI Addendum 1 | 10/11/2024 8:54 AM | | | | | | |
| | DEA_Hurricane Helene I-40 Pigeon River Gorge EMERGENCY Repair Designs Project-Specific Contract -- FINAL (10.09.2024) -- ADDENDUM No 1 (10.11.2024) | 10/9/2024 4:11 PM | rjstroup@ncdot.gov | 40% | 10% | 25% | 25% | 0% |
| | Hurricane Helene Emergency Express Design-Build Solicitation – Divisions 11, 13 and 14 - Emergency replacement or rehabilitation of bridges, culverts and pipes 48-inches or larger in diameter | 10/4/2024 4:04 PM | | | | | | |
| | REQUEST FOR LETTERS OF INTEREST FOR 1-1-2025 thru 12-31-2026 ASBESTOS INSPECTION, ABATEMENT, AND CLEARING CONTRACTORS | 10/1/2024 8:11 AM | | | | | | |
| | I-5719C_CMGC_-_I-85_Rail_Bridge_RFLOI | 10/1/2024 8:09 AM | | | | | | |
| | Logo Program Privatization | 10/1/2024 8:06 AM | | | | | | |
| | TIP I-6016 & I-5719C INDEPENDENT COST ESTIMATING | 10/1/2024 8:02 AM | | | | | | |
| | I-5719B - U-5800 Special Notice for Ad Purchase Directory | 8/30/2024 12:19 PM | | | | | | |
| | RESCINDED -- DBA_R-5759 Construction Engineering and Inspection (CEI) -- FINAL (09.01.2024) -- ADDENDUM No 1 (09.05.2024 -- ADVERTISEMENT RESCINDED) | 8/30/2024 12:13 PM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | GTA_2025 Geotechnical, GeoEnvironmental, and Foundation Testing Services LSC -- FINAL (09.01.2024) | 8/30/2024 12:12 PM | rjstroup@ncdot.gov | 30% | 25% | 25% | 10% | 10% |
| | I-6016 CMGC Project | 8/15/2024 12:15 PM | | | | | | |
| | ROW for Proposed S-Line High Speed Rail Project between Raleigh and the Virginia State Line | 8/5/2024 12:15 PM | | | | | | |
| | OPM_2025 Quality Assurance for High Speed Data Collection -- FINAL (08.01.2024) | 8/1/2024 9:59 AM | rjstroup@ncdot.gov | 50% | 50% | 0% | 0% | 0% |
| | TRA_2024 ITS Operations LSC -- FINAL (08.01.2024) | 8/1/2024 9:58 AM | rjstroup@ncdot.gov | 50% | 30% | 20% | 0% | 0% |
| | RLA_2024 Rail Program Delivery LSC -- FINAL (07.15.2024) -- ADDENDUM No 2 (07.31.2024) | 7/15/2024 11:10 AM | rjstroup@ncdot.gov | 30% | 20% | 40% | 10% | 0% |
| | OPM_2025 High Speed Data Collection and Processing -- FINAL (07.15.2024) | 7/15/2024 11:09 AM | rjstroup@ncdot.gov | 45% | 35% | 15% | 5% | 0% |
| | TIP I-6059 Construction Manager / General Contractor (CM/GC) | 7/1/2024 1:40 PM | | | | | | |
| | DCA_R-2307B Construction Engineering and Inspection (CEI) -- FINAL (07.01.2024) | 7/1/2024 8:49 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | PTA_2024 Aerial Surveying Services LSC -- FINAL (07.01.2024) | 7/1/2024 8:49 AM | rjstroup@ncdot.gov | 40% | 30% | 30% | 0% | 0% |
| | SRM_2024 Training and Development Support LSC -- FINAL (07.01.2024) | 7/1/2024 8:48 AM | rjstroup@ncdot.gov | 30% | 30% | 10% | 30% | 0% |
| | NCDOT AUTOMATING ACTIONABLE ROAD ANOMALIES (AARA) FOR TRAVELER INFORMATION REQUEST FOR QUALIFICATIONS (RFQ) | 6/14/2024 8:43 AM | | | | | | |
| | DDA_I-2513BD Construction Engineering and Inspection (CEI) -- FINAL (06.01.2024) | 5/31/2024 9:36 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | FDA_2024 Environmental and Coastal Engineering Services LSC -- FINAL (05.15.2024) | 5/15/2024 8:49 AM | rjstroup@ncdot.gov | 50% | 30% | 10% | 10% | 0% |
| | CHE_2024 WESTERN DIVs (8-14) PLANNING and DESIGN ENG SRVCS CONS (PDSC) and GEN ENG SRVCS CONS (GESC) LSC -- FINAL (03.15.2024) -- ADDENDUM No 2 (03.22.2024) | 3/15/2024 12:23 PM | rjstroup@ncdot.gov | 45% | 25% | 10% | 20% | 0% |
| | RESCINDED -- I-5719 / U-5800 / U-6044 - Design-Build Project Advertisement -- RESCINDED (03.08.2024) | 3/1/2024 9:41 AM | | | | | | |
| | RLA_2024 Rail Consulting and Facilitation Services LSC -- FINAL (03.01.2024) | 3/1/2024 9:27 AM | rjstroup@ncdot.gov | 30% | 30% | 30% | 10% | 0% |
| | RDE_2024 UST Environmental Services LSC -- FINAL (03.01.2024) | 3/1/2024 9:26 AM | rjstroup@ncdot.gov | 50% | 50% | 0% | 0% | 0% |
| | GTA_R-2576 (Mid-Currituck Bridge) Geotechnical Investigations -- FINAL (02.15.2024) | 2/15/2024 9:48 AM | rjstroup@ncdot.gov | 40% | 40% | 10% | 10% | 0% |
| | D1A_HB-0001 Construction Engineering and Inspection (CEI) -- FINAL (02.15.2024) | 2/15/2024 9:47 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | D4A_U-6216 Cleveland Rd Widening, Johnston County (Planning and Design) -- FINAL (01.15.2024) -- ADDENDUM No 1 (01.31.2024) | 1/16/2024 8:37 AM | rjstroup@ncdot.gov | 30% | 30% | 20% | 20% | 0% |
| | SRM_2024 Flexible Pavement Training and Reporting LSC -- FINAL (01.15.2024) | 1/16/2024 8:36 AM | rjstroup@ncdot.gov | 10% | 30% | 30% | 20% | 10% |
| | SRM_2024 Management of the Outdoor Advertising Program (Statewide) -- FINAL (01.15.2024) | 1/16/2024 8:35 AM | rjstroup@ncdot.gov | 35% | 65% | 0% | 0% | 0% |
| | PDA_2024 Comprehensive Environmental Analysis Unit (EAU) Services LSC -- FINAL (12.15.2023) -- ADDENDUM No 1 (01.18.2024) | 12/15/2023 11:01 AM | rjstroup@ncdot.gov | 40% | 35% | 25% | 0% | 0% |
| | ROW_12-1-23 DISPOSAL OF NCDOT RESIDUAL PROPERTY 2024 | 12/1/2023 9:34 AM | | | | | | |
| | SPL_2024 Travel Demand Modeling LSC -- FINAL (11.01.2023) | 11/1/2023 10:52 AM | rjstroup@ncdot.gov | 30% | 20% | 20% | 15% | 15% |
| | FDA_2023 Ferry Division Professional Services LSC -- FINAL (10.15.2023) -- ADDENDUM No 1 (10.25.2023) | 10/16/2023 8:21 AM | rjstroup@ncdot.gov | 60% | 20% | 10% | 10% | 0% |
| | TRA_U-5945 Wilson Signal System -- FINAL (10.15.2023) -- ADDENDUM No 1 (10.19.2023) | 10/16/2023 8:21 AM | rjstroup@ncdot.gov | 35% | 35% | 25% | 5% | 0% |
| | SPL_2024 Traffic Forecasting Services LSC -- FINAL (10.01.2023) -- ADDENDUM No 1 (10.27.2023) | 10/2/2023 10:49 AM | rjstroup@ncdot.gov | 45% | 25% | 25% | 5% | 0% |
| | D2A_R-5777C Construction Engineering and Inspection (CEI) -- FINAL (09.01.2023) | 8/31/2023 4:00 PM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | CHE_2023 SPSF-Only PLANNING and DESIGN ENG SRVCS CONS (PDSC) LSC -- FINAL (09.01.2023) -- ADDENDUM No 1 (09.29.2023) | 8/31/2023 4:00 PM | rjstroup@ncdot.gov | 45% | 25% | 10% | 20% | 0% |
| | SPL_2023 General Transportation Planning Services LSC -- FINAL (09.01.2023) | 8/31/2023 4:00 PM | rjstroup@ncdot.gov | 45% | 25% | 25% | 5% | 0% |
| | FDA_2023 Ferry Division General Engineering Services (GESC) - Facility and Marine Asset Management LSC -- FINAL (09.01.2023) | 8/31/2023 3:59 PM | rjstroup@ncdot.gov | 60% | 20% | 10% | 10% | 0% |
| | RLA_P-5753 - Raleigh to Richmond (R2R) North Carolina Roadway Design -- FINAL (09.01.2023) -- ADDENDUM No 2 (09.21.2023) | 8/31/2023 3:59 PM | rjstroup@ncdot.gov | 35% | 30% | 25% | 10% | 0% |
| | 2023 Office of Civil Rights Limited Services Contract | 8/15/2023 1:00 PM | | | | | | |
| | 2024-2026 TRIENNIAL ASPIRATIONAL DBE, MBE, & WBE GOALS LSC | 8/15/2023 12:23 PM | | | | | | |
| | NCDOT Disparity Study, 2024 | 8/15/2023 12:19 PM | | | | | | |
| | SAFETY SERVICE PATROL (SSP) CONTRACT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) | 8/15/2023 9:38 AM | | | | | | |
| | TPA_2023 INVESTMENT ADVISORY SERVICES LSC (Limited Services Contract) -- FINAL (08.15.2023) (NO ADDENDUM) | 8/15/2023 9:15 AM | rjstroup@ncdot.gov | 30% | 30% | 20% | 20% | 0% |
| | DDA_I-2513AA, AB, AC Construction Engineering and Inspection (CEI) -- FINAL (08.15.2023) -- ADDENDUM No 1 (08.24.2023) | 8/15/2023 9:14 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | HB-0001_CMGC_-_Alligator_River_RFLOI_230615 | 6/15/2023 8:27 AM | | | | | | |
| | STA_2023 Structures Management Support LSC -- FINAL (06.15.2023) | 6/14/2023 4:23 PM | rjstroup@ncdot.gov | 50% | 30% | 20% | 0% | 0% |
| | CHE_2023 Statewide On-Call Construction Engineering and Inspection Services LSC -- FINAL (06.15.2023) | 6/14/2023 4:23 PM | rjstroup@ncdot.gov | 20% | 30% | 50% | 0% | 0% |
| | RLA_P-5753A, B, C, and D--Raleigh to Richmond (R2R) North Carolina Rail Design -- FINAL (06.01.2023) -- ADDENDUM No 1 (06.09.2023) | 6/9/2023 11:46 AM | rjstroup@ncdot.gov | 45% | 35% | 20% | 0% | 0% |
| | Sponsor-A -Highway Program 2023 | 6/1/2023 12:58 PM | | | | | | |
| | PDV_2023 Feasibility Studies and General Programming and Prioritization LSC -- FINAL (06.01.2023) | 6/1/2023 12:52 PM | rjstroup@ncdot.gov | 70% | 20% | 10% | 0% | 0% |
| | CMGC - US Open RFLOI 230403 | 4/3/2023 8:53 AM | | | | | | |
| | PMU_2023 Project Management Unit PLANNING and DESIGN ENG SRVCS CONS (PDSC) and GEN ENG SRVCS CONS (GESC) LSC -- FINAL (03.15.2023) | 3/15/2023 2:51 PM | rjstroup@ncdot.gov | 45% | 25% | 10% | 20% | 0% |
| | IMAP Sponsorship | 3/1/2023 9:27 AM | | | | | | |
| | D5A_R-2829B Construction Engineering and Inspection (CEI) -- FINAL (03.01.2023) | 3/1/2023 9:24 AM | rjstroup@ncdot.gov | 20% | 40% | 30% | 10% | 0% |
| | TPA_2023 FINANCIAL ADVISORY SERVICES LSC (Limited Services Contract) -- FINAL (03.01.2023) (NO ADDENDUM) | 3/1/2023 9:23 AM | rjstroup@ncdot.gov | 50% | 30% | 20% | 0% | 0% |
| | RDE_2023 Erosion Control & Sediment Control LSC -- FINAL (02.15.2023) | 2/15/2023 2:38 PM | rjstroup@ncdot.gov | 50% | 50% | 0% | 0% | 0% |
| | LSA_2023 Location & Surveys and General Engineering Services Consultant (GESC) LSC -- FINAL (02.15.2023) | 2/15/2023 2:38 PM | rjstroup@ncdot.gov | 35% | 25% | 25% | 15% | 0% |
| | R-2829A NCTA Design-Build Project in Wake County | 2/2/2023 5:15 AM | | | | | | |
| | TRA_2023 TMSD Limited Services Contract -- FINAL (01.15.2023) | 1/13/2023 12:42 PM | rjstroup@ncdot.gov | 70% | 15% | 15% | 0% | 0% |
| | I-2513B & D Special Notice for Ad Purchase Directory | 1/13/2023 12:05 PM | | | | | | |
| | RDE_2023 NCDOT Roadside Aesthetics Limited Services Contract (LSC) -- FINAL (01.15.2023) | 1/13/2023 11:54 AM | rjstroup@ncdot.gov | 20% | 20% | 20% | 20% | 20% |
| | RLA_Rail Division R2R (S-Line) Grade Separation-Roadway Design General Oversight Contract (GESC LSC) -- FINAL (12.15.2022) | 12/15/2022 1:32 PM | rjstroup@ncdot.gov | 45% | 15% | 15% | 25% | 0% |
| | R-4045 / BR-0012 Design-Build Advertisement | 11/15/2022 1:14 PM | | | | | | |
| | FMA and ROW_Disposal of Residual Property -- RFQ 11-15-22 - November 15th | 11/15/2022 1:13 PM | | | | | | |
| | R-2829B NCTA Design-Build Advertisement | 11/15/2022 1:10 PM | | | | | | |
| | CHE_2023 STRATEGIC GENERAL SERVICES CONSULTANT Limited Services Contract (On-Call Contract) -- FINAL (11.15.2022) | 11/15/2022 12:56 PM | rjstroup@ncdot.gov | 35% | 30% | 20% | 15% | 0% |
| | ROW_2023-2025 On Call Request for Letter of Interest | 11/1/2022 8:55 AM | | | | | | |
| | ROW_2023 Advertisement -- NCDOT ROW Inspection-Abatement-Demo Contracts | 9/30/2022 9:08 AM | | | | | | |
| | DOT COURTESY POSTING for DIT -- Notice of Information Technology Services Posting -- Open Enrollment for the existing State Term Contract for IT Specialty Services (STC 920S) | 9/15/2022 1:56 PM | | | | | | |
| | NCDOT Multimodal Connected Vehicle Pilot - HO-0001AA | 9/15/2022 1:54 PM | | | | | | |
| | GTA_2023 Geotechnical, GeoEnvironmental, and Foundation Testing Services LSC -- FINAL (09.01.2022) | 9/1/2022 11:31 AM | rjstroup@ncdot.gov | 35% | 30% | 25% | 10% | 0% |
| | D6A_R-5705 A and B (Angier Bypass) Construction Engineering and Inspection (CEI) -- FINAL (08.15.2022) | 8/15/2022 11:50 AM | rjstroup@ncdot.gov | 25% | 40% | 25% | 10% | 0% |
| | TRA_2022 School Traffic Impact and Operations Studies LSC -- FINAL (08.15.2022) | 8/15/2022 11:50 AM | rjstroup@ncdot.gov | 75% | 15% | 10% | 0% | 0% |
| | PSU and RWA_2022 Utilities Limited Services Contract (Design, Coordination and Encroachments) -- FINAL (07.15.2022) | 7/14/2022 1:45 PM | rjstroup@ncdot.gov | 50% | 25% | 25% | 0% | 0% |