| | U-2579AA | 9 | Forsyth | BID BUILD: Winston-Salem Northern Beltway Eastern Section (Future I-74) from US 311 to I-40.
| $95,100,000 | 10/18/2022 | 6/15/2022 | | 2/17/2023 12:59 PM | | | | | | The General Engineering Services Consultant/Team will be the Owners Representative to oversee the project -- construction of a 650,000 square foot Hangar Complex for the Maintenance, Repair, and Overhaul (MRO) of large military transport aircraft. The actual construction contract method is yet to be determined -- the GESC firm is anticipated to help guide NCGTP in the best possible method whether it is DBB, DB, or CMGC.
| $300,000,000 | 6/1/2022 | 3/1/2022 | Contact for Questions -- R. Preston Hunter, P.E. - President and Chief Executive Officer, NCGTP | 9/1/2023 8:43 AM | | | A-0009CA, A-0009CB, A-0009CC | | | BID-BUILD: US 129 from 0.2 miles South of SR 1275 (Five Points Road) to NC 143; NC 143 from US 129 to NC 28; NC 28 from NC 143 to 0.3 miles East of SR 1235 (Gunters Gap Road). | $121,900,000 | 8/22/2022 | 6/1/2022 | | 9/1/2023 8:43 AM | | | R-5705 A and B | | | R-5705A is NC 55 from Church Street to Angier Town Limits. R-5705B is NC 55 from Angier Town Limits to south of SR-2791 (Kennebec Church Road) part on new location.
| | 10/18/2022 | 8/15/2022 | | 9/1/2023 8:44 AM | | | R-2707D | | | US 74 SHELBY BYPASS FROM EAST OF NC 150 TO EXISTING US 74 WEST OF SR | $101,200,000 | 7/18/2023 | 3/1/2023 | | 2/17/2023 12:59 PM | | | R-2707E | | | US 74 SHELBY BYPASS FROM US 74 WEST OF SR 2238 TO WEST OF SR 1001 | $50,400,000 | 7/18/2023 | 3/1/2023 | | 2/17/2023 12:58 PM | | | U-4758 | | | SR 1818 (JOHNSON STREET ) / SR 1850 (SANDY RIDGE ROAD) FROMSR 1820 (SKEET CLUB ROAD) TO SOUTH OF I-40 IN HIGH POINT | $70,400,000 | 6/17/2025 | 3/1/2025 | | 1/15/2025 9:03 AM | | | I-6065 | | | I-77 FROM I-485 TO NC 150, CONSTRUCT PEAK PERIOD SHOULDER LANES. | $45,950,000 | 3/19/2024 | 11/1/2023 | | 2/17/2023 1:10 PM | | | I-5719 | | | I-85 FROM US 321 TO NC 273; WIDEN TO EIGHT LANES (COMB W/U-5800 AND U-6044). WIDEN TO EIGHT LANES. | $710,000,000 | 2/18/2025 | 1/15/2025 | | 1/31/2025 12:40 PM | | | R-5757 | | | NC 305, FROM SEABOARD TOWN LIMITS TO HERTFORD COUNTY LINE. UPGRADE | $46,500,000 | 6/18/2024 | 2/1/2024 | | 9/7/2023 2:40 PM | | | U-4714B | | | SR 1009 (OLD MONROE ROAD) FROM WEST OF MORNINGSIDE MEADOW LANE | $43,500,000 | 2/18/2025 | 11/15/2024 | | 1/17/2024 9:38 AM | | | U-5307A | | | RALEIGH - US 1 FROM I-540 TO NORTH OF SR 2006 (DURANT ROAD) | $184,700,000 | 10/21/2025 | 6/1/2025 | | 4/22/2024 12:05 PM | | | U-5518 | | | US 70 (GLENWOOD AVENUE) FROM WEST OF SR 3067 (T. W. ALEXANDER DRIVE) | $168,500,000 | 4/21/2026 | 1/15/2026 | | 4/22/2024 3:51 PM | | | U-2817 | | | SR 1700 (EVANS STREET / OLD TAR ROAD) FROM SR 1711 (WORTHINGTON ROAD) IN WINTERVILLE TO US 264 ALTERNATE (GREENVILLE | $123,300,000 | 4/21/2026 | 12/15/2025 | | 1/15/2025 9:08 AM | | | U-5760 | | | KERNERSVILLE SOUTHERN LOOP, AT US 421/BUSINESS 40 TO NC 66 (WEST | $41,200,000 | 4/15/2025 | 12/1/2024 | | 4/22/2024 3:44 PM | | | R-2566B | | | INTERSECTION OF SR 1456 (WHITE JENKINS ROAD), AND SR 1327 (FAIRVIEW ROAD). IMPROVE INTERSECTIONS AND CLOSE INTERSECTION NC 105 FROM SR 1136 IN WATAUGA COUNTY TO SR 1107 IN BOONE | $87,600,000 | 12/15/2026 | 8/15/2026 | | 1/15/2025 9:13 AM | | | R-5832 | | | NC 88, FROM NC 88 TO NC 194. UPGRADE ROADWAY. | $45,191,000 | 6/17/2025 | 2/1/2025 | | 9/7/2023 2:40 PM | | | R-2307B | | | NC 150 FROM SR 1902 (HARVEL ROAD) IN CATAWBA COUNTY TO I-77IN IREDELL COUNTY (INCLUDES I-5717). | $164,500,000 | 10/15/2024 | 7/1/2024 | | 7/3/2024 11:09 AM | | | U-4700A | | | US 321 FROM US 70 IN HICKORY TO US 321A (COMBINED WITH B-4450: TO | $157,000,000 | 8/19/2025 | 4/1/2025 | | 9/7/2023 2:41 PM | | | | | | Transportation Mobility and Safety Division LSC
| | | | | 9/1/2023 8:44 AM | | | | | | Rail Division R2R (S-Line) Grade Separation-Roadway Design General Oversight Contract (GESC LSC)
| | | | | 9/1/2023 8:45 AM | | | R-2829B | | | Triangle Expressway Southeast Extension From South of Rock Quarry Road (SR 2542) to North of I-87 / US 64 / US 264
| $420,900,000 | 7/18/2023 | 3/1/2023 | | 9/1/2023 8:47 AM | | | R-2829A | NC Turnpike Authority | Wake | Triangle Expressway Southeast Extension From I-40 to South of Rock Quarry Road (SR 2542)
| $261,100,000 | 9/19/2023 | 4/15/2023 | | 4/19/2023 9:14 AM | | | R-4045 | Division 12 | Cleveland | US 74 - AT SR 1168 (LATTIMORE ROAD) INTERSECTION. UPGRADE AT-GRADE INTERSECTION TO INTERCHANGE. (COMB W/BR-0012)
| $25,000,000 | 7/18/2023 | 3/15/2023 | | 2/17/2023 1:06 PM | | | U-5748 | | | US 401 AT LIGON MILL/MITCHELL MILL ROAD AND PERRY CREEK ROAD INTERSECTION IMPROVEMENTS
| $22,500,000 | 4/18/2023 | 3/1/2023 | | 2/17/2023 1:03 PM | | | U-5747/U-5750 | | | MCCRIMMON PKWY FROM DAVIS DRIVE TO CHURCH STREET IN MORRISVILLE AND NC 54 FROM NC 540 TO PERIMETER PARK DRIVE; GRADE SEPARATION, WIDENING AND INTERSECTION IMPROVEMENTS
| $75,000,000 | 6/18/2024 | 3/1/2023 | | 2/17/2023 1:01 PM | | | I-2513 BD | | | I-240 / I-26 from north of SR 3548 (Haywood Road) to SR 1781 (Broadway Street); and from SR 1517 (Hill Street) to SR 1781 (Broadway Street)
| | 5/7/2024 | 8/1/2024 | | 6/10/2024 9:43 AM | | | HB-0001 | | | Replacing Bridge No. 7 over Alligator River on US 64
| | | 6/15/2023 | | 6/27/2023 12:31 PM | | | P-5753AE, AH, BE, BF, BG, CH, DD, DE | | | Road over rail grade separation and new location roadway design for the S-line corridor to support the Raleigh to Richmond (R2R) project.
| | | | | 9/1/2023 9:03 AM | | | | | | | | | 8/15/2023 | | 9/1/2023 8:51 AM |
|