SP01 G001.docx
  
SP01GPROJECT SPECIAL PROVISION (General)1995-07
SP01 G003A.docx
  
SP01GNOTICE TO BIDDERS (2 Cluster Projects)2014-01
SP01 G003B.docx
  
SP01GNOTICE TO BIDDERS (3 Cluster Projects)2014-01
SP01 G004.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (with Permits)2007-12
SP01 G005A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, with Permits)2007-12
SP01 G005B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, No Permits)2007-12
SP01 G007A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, with Permits)2007-12
SP01 G007B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, with Permits)2016-12
SP01 G007C.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, No Permits)2012-04
SP01 G007D.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, No Permits)2016-12
SP01 G010A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (No Permits)2007-12
SP01 G010B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Signals, No Permits)2007-12
SP01 G013A.docx
  
SP01GINTERMEDIATE CONTRACT TIME #1 AND LIQ. DAMAGES (Reforestation)2012-02
SP01 G013B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (No Permits)2007-12
SP01 G013C.docx
  
SP01GINT. CONTRACT TIME #1, BONUS CLAUSE AND LIQ. DAMAGES2016-05
SP01 G014A.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Combined)2007-02
SP01 G014B.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Holiday Lane Closure)2007-02
SP01 G014C.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Lane Closure, Time Restricted)2007-02
SP01 G014D.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Road Closure Hour)2007-02
SP01 G014E.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Road Closure Minute)2013-10
SP01 G014F.docx
  
SP01GINTERMEDIATE CONTRACT TIMES FROM ___ TO ___2013-06
SP01 G014G.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Consecutive Hours)2013-06
SP01 G014H.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Consecutive Days)2013-06
SP01 G014I.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Inductive Loop Installations)2013-05
SP01 G014K.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Dates, Maps)2013-06
SP01 G014L.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Dates, TMP)2013-06
SP01 G015R.docx
  
SP01GPROSECUTION OF WORK (Multiple Maps)2012-08
SP01 G016.docx
  
SP01GPERMANENT VEGETATION ESTABLISHMENT2013-10
SP01 G017R.docx
  
SP01GRAILROAD GRADE CROSSING (Not on Interstate)2013-01
SP01 G018A.docx
  
SP01GCONSTRUCTION MORATORIUM (Trout)2014-07
SP01 G018B.docx
  
SP01GCONSTRUCTION MORATORIUM (Anadromous Fish)2014-07
SP01 G018C.docx
  
SP01GCONSTRUCTION MORATORIUM (Bat)2016-01
SP01 G022.docx
  
SP01GDELAY IN RIGHT OF ENTRY2014-07
SP01 G022A.docx
  
SP01GDELAY IN RIGHT OF WAY ENTRY1995-07
SP01 G022B.docx
  
SP01GDELAY IN RIGHT OF WAY ENTRY (Multiple Dates)1995-07
SP01 G024R.docx
  
SP01GPOSTED WEIGHT LIMITS2015-09
SP01 G028.docx
  
SP01GMAJOR CONTRACT ITEMS2002-02
SP01 G031.docx
  
SP01GNO MAJOR CONTRACT ITEMS2007-08
SP01 G034.docx
  
SP01GNO SPECIALTY ITEMS1995-07
SP01 G037.docx
  
SP01GSPECIALTY ITEMS2012-01
SP01 G040.docx
  
SP01GSPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST1995-07
SP01 G043.docx
  
SP01GFUEL PRICE ADJUSTMENT2014-02
SP01 G057.docx
  
SP01GPAYOUT SCHEDULE2012-01
SP01 G058.docx
  
SP01GSCHEDULE OF ESTIMATED COMPLETION PROGRESS2017-05
SP01 G061.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Central Let)2017-01
SP01 G062.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Division)2017-01
SP01 G063.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Local Government Agency)2017-01
SP01 G064.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Rail)2012-12
SP01 G066.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Central Let)2016-04
SP01 G067.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Division)2017-01
SP01 G068.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Local Government Agency)2017-01
SP01 G085.docx
  
SP01GCERTIFICATION FOR FEDERAL-AID CONTRACTS1990-03
SP01 G088.docx
  
SP01GCONTRACTOR'S LICENSE REQUIREMENTS1995-07
SP01 G100.docx
  
SP01GU.S. DOT HOTLINE AND CARGO PREFERENCE ACT2016-02
SP01 G103.docx
  
SP01GSUBMISSION OF RECORDS (Fed Aid BRZ Projects)2012-08
SP01 G112A.docx
  
SP01GSUBSURFACE INFORMATION (Information Not Available)1995-07
SP01 G112B.docx
  
SP01GSUBSURFACE INFORMATION (Roadway Only)1995-07
SP01 G112C.docx
  
SP01GSUBSURFACE INFORMATION (Structures Only)1995-07
SP01 G112D.docx
  
SP01GSUBSURFACE INFORMATION (Roadway and Structures)1995-07
SP01 G121.docx
  
SP01GPORTABLE CONCRETE BARRIER (Partial Payment for Materials)2011-08
SP01 G124.docx
  
SP01GREMOVABLE PAVEMENT MARKINGS (Partial Payment for Materials)2011-08
SP01 G125.docx
  
SP01GMAINTENANCE OF THE PROJECT2012-01
SP01 G133.docx
  
SP01GCOOPERATION BETWEEN CONTRACTORS1995-07
SP01 G142.docx
  
SP01GBID DOCUMENTATION2015-08
SP01 G145.docx
  
SP01GTWELVE-MONTH GUARANTEE2003-11
SP01 G146.docx
  
SP01GTWELVE-MONTH GUARANTEE (LGA Only)2013-12
SP01 G150.docx
  
SP01GOUTSOURCING OUTSIDE THE USA2006-05
SP01 G180.docx
  
SP01GEROSION & STORM WATER CERTIFICATION2016-11
SP01 G181.docx
  
SP01GPROCEDURE FOR MONITORING BORROW PIT DISCHARGE2013-03
SP01 G190.docx
  
SP01GREVISION TO FHWA-1273 2013-10
SP01 R001.docx
  
SP01RPROJECT SPECIAL PROVISIONS (Roadway)1995-07
SP01 R004R.docx
  
SP01RSHOULDER CONSTRUCTION2012-08
SP01 R007AR.docx
  
SP01RSHOULDER RECONSTRUCTION (Stone, Seeding Separate)2012-08
SP01 R007BR.docx
  
SP01RSHOULDER RECONSTRUCTION (No Seeding & Mulching)2012-08
SP01 R007CR.docx
  
SP01RSHOULDER RECONSTRUCTION (No Stone, Seeding Separate)2013-11
SP01 R007DR.docx
  
SP01RSHOULDER RECONSTRUCTION (No Stone, No Seeding & Mulch)2012-08
SP01 R007ER.docx
  
SP01RSHOULDER RECONSTRUCTION (State Forces Seeding)2012-08
SP01 R007FR.docx
  
SP01RSHOULDER RECONSTRUCTION (Stone, Seeding Separate, Div 5)2012-08
SP01 R010AR.docx
  
SP01RSHOULDER CONSTRUCTION PROCEDURE2013-10
SP01 R010BR.docx
  
SP01RSHOULDER RECONSTRUCTION PROCEDURE2013-10
SP01 R034R.docx
  
SP01RCONSTRUCTION SEQUENCE2012-08
SP02 R002A.docx
  
SP02RCLEARING AND GRUBBING (Method II)2015-08
SP02 R002B.docx
  
SP02RCLEARING AND GRUBBING (Method III)2015-08
SP02 R005.docx
  
SP02RBURNING RESTRICTION1995-07
SP02 R010.docx
  
SP02RDEMOLITION OF BUILDING AND APPURTENANCES2012-01
SP02 R015A.docx
  
SP02RBUILDING REMOVAL (Inside ROW)2013-04
SP02 R015B.docx
  
SP02RBUILDING REMOVAL (Cut Building at ROW)2013-04
SP02 R015C.docx
  
SP02RBUILDING REMOVAL (Both sides of ROW)2016-11
SP02 R015D.docx
  
SP02RBUILDING AND UNDERGROUND STORAGE TANK REMOVAL2013-04
SP02 R016.docx
  
SP02RLUMP SUM GRADING2010-08
SP02 R030A.docx
  
SP02RTEMPORARY DETOURS (Lump Sum Grading)2015-04
SP02 R030B.docx
  
SP02RTEMPORARY DETOURS (No lump sum grading)2013-11
SP02 R030C.docx
  
SP02RTEMPORARY DETOURS (Exceptions to Lump Sum Grading)2014-02
SP02 R045A.docx
  
SP02RSHOULDER AND FILL SLOPE MATERIAL (Lump Sum Garding)2002-05
SP02 R045B.docx
  
SP02RSHOULDER AND FILL SLOPE MATERIAL (No Lump Sum Grading)2002-05
SP02 R057.docx
  
SP02RBORROW EXCAVATION (Truck Measurement)1995-07
SP02 R058.docx
  
SP02RBORROW EXCAVATION (In Place or Truck Measurement)1995-07
SP02 R070.docx
  
SP02RCOAL COMBUSTION PRODUCTS IN EMBANKMENTS2015-05
SP02 R072.docx
  
SP02RMANUFACTURED QUARRY FINES IN EMBANKMENTS2017-01
SP02 R085.docx
  
SP02RROCK AND BROKEN PAVEMENT FILLS2016-02
SP03 R005.docx
  
SP03RREINFORCED CONCRETE TAPERED INLET2012-11
SP03 R030.docx
  
SP03RFLOWABLE FILL2012-01
SP04 R002A.docx
  
SP04RBRIDGE APPROACH FILLS2018-01
SP04 R002B.docx
  
SP04RALTERNATE BRIDGE APPROACH FILLS FOR INTEGRAL ABUTMENTS2018-01
SP05 R005.docx
  
SP05RAUTOMATED FINE GRADING1996-01
SP05 R012.docx
  
SP05RSTABILIZATION OF COASTAL PLAIN SANDS2014-11
SP05 R017.docx
  
SP05RCLASS IV SUBGRADE STABILIZATION IN LIEU OF CHEMICAL STABILIZATION2018-01
SP05 R020.docx
  
SP05RSOIL-CEMENT BASE (FULL DEPTH RECLAMATION)2013-11
SP05 R028R.docx
  
SP05RINCIDENTAL STONE BASE2012-08
SP06 R003R.docx
  
SP06RSHOULDER WEDGE2012-08
SP06 R025.docx
  
SP06RPRICE ADJUSTMENT FOR ASPHALT BINDER FOR PLANT MIX2000-11
SP06 R045.docx
  
SP06RFINAL SURFACE TESTING NOT REQUIRED2016-02
SP06 R049R.docx
  
SP06RASPHALT CONCRETE SURFACE COURSE COMPACTION2012-08
SP06 R054.docx
  
SP06RASPHALT SURFACE TREATMENT AGGREGATE TYPE AND APPLICATION RATES2018-01
SP06 R058R.docx
  
SP06RREPAIR OF EXISTING PAVEMENT2014-05
SP06 R061AR.docx
  
SP06RRESURFACING EXISTING BRIDGES2012-08
SP06 R061BR.docx
  
SP06RRESURFACING EXISTING BRIDGES (With Milling)2012-08
SP06 R062.docx
  
SP06ROPEN GRADED ASPHALT FRICTION COURSE, PERMEABLE ASPHALT DRAINAGE COURSE, AND ULTRA-THIN BONDED WEARING COURSE2015-12
SP06 R067AR.docx
  
SP06RPAVING INTERSECTIONS (State Forces)2012-08
SP06 R067BR.docx
  
SP06RPAVING INTERSECTIONS (Contractor Forces)2012-08
SP06 R070AR.docx
  
SP06RPAVING DRIVEWAYS AND MAILBOX TURNOUTS (State Forces)2012-08
SP06 R070BR.docx
  
SP06RPAVING DRIVEWAYS AND MAILBOX TURNOUTS (Contractor Forces)2012-08
SP06 R076R.docx
  
SP06RPAVEMENT WIDTH VARIES2012-08
SP06 R079AR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Base Course, Contractor Disposes of Excess)2016-01
SP06 R079BR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Int. Course, Contractor Disposes of Excess)2012-08
SP06 R082AR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Base Course, State Disposes of Excess)2016-01
SP06 R082BR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Int. Course, State Disposes of Excess)2012-08
SP06 R085R.docx
  
SP06RASPHALT CONCRETE SURFACE COURSE, TYPE xxx (Leveling Course)2012-08
SP06 R088R.docx
  
SP06RPATCHING EXISTING PAVEMENT2012-12
SP08 R010.docx
  
SP08RMODIFIED CONCRETE FLUME WITH CONCRETE OUTLET2008-06
SP08 R045.docx
  
SP08RCONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET2006-07
SP08 R050.docx
  
SP08RCONVRTING EXISTING __TO__2006-07
SP08 R055.docx
  
SP08RREMOVAL AND STOCKPILE OF EXISTING GUARDRAIL2006-07
SP08 R064.docx
  
SP08RGUARDRAIL END UNITS, TYPE TL-22017-07
SP08 R065.docx
  
SP08RGUARDRAIL END UNITS, TYPE TL-32017-07
SP08 R075.docx
  
SP08RIMPACT ATTENUATOR, UNIT TYPE 3502015-07
SP08 R085.docx
  
SP08RTEMPORARY WOVEN WIRE FENCE2016-01
SP08 R095R.docx
  
SP08RADJUSTMENT OF MANHOLES2012-08
SP08 R096R.docx
  
SP08RADJUSTMENT TO MANHOLES2012-08
SP08 R097R.docx
  
SP08RADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES2012-08
SP08 R100.docx
  
SP08RCHAIN LINK FENCE w/ BARBED WIRE ON EXTENSION ARMS1995-07
SP09 R005.docx
  
SP09RFOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES2018-01
SP09 R007.docx
  
SP09ROVERHEAD AND DYNAMIC MESSAGE SIGN FOUNDATIONS2018-01
SP10 R002.docx
  
SP10RHIGH STRENGTH CONCRETE FOR DRIVEWAYS2012-01
SP11 R002.docx
  
SP11RTEMPORARY SHORING2018-01
SP11 R005.docx
  
SP11RTEMPORARY TRAFFIC CONTROL DEVICES2012-01
SP14 R004.docx
  
SP14RROADWAY LIGHTING FOUNDATIONS2018-01
SP16 R002.docx
  
SP16RPERMANENT SEEDING AND MULCHING1995-07
SP16 R003R.docx
  
SP16REROSION AND STORMWATER CONTROL FOR SHOULDER2012-08
T S1East.docx
  
TSEED MIX EAST (Alamance, Anson, Franklin, Guilford, Orange, Person, Vance, Wake and Warren)2016-03
T S2.docx
  
TSEED MIX EAST CRIMP (All other counties not listed elsewhere)2016-03
T S2A.docx
  
TSEED MIX DIVISION 3 CRIMP (Brunswick, Duplin, New Hanover, Onslow, Pender and Sampson)2016-03
T S3.docx
  
TSEED MIX WEST (Alexander, Alleghany, Ashe, Avery, Cabarrus, Caldwell, Caswell, Catawba, Cleveland, Davidson, Davie, Forsyth, Gaston, Iredell, Lincoln, Mecklenburg, Rockingham, Rowan, Stanley, Stokes, Surry, Union, Watauga, Wilkes and Yadkin)2016-03
T S4.docx
  
TSEED MIX WEST ED (Buncombe, Burke, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, Mitchell, Polk, rutherford, Swain, Transylvania and Yancey)2016-03
T S5.docx
  
TSEED MIX WEST CRIMP (All other counties not listed elsewhere)2015-05
T1.docx
  
TWATTLES2012-01
T2.docx
  
TWATTLES WITH POLYACRYLAMIDE (PAM)2012-01
  
  
2018 Standard Specifications for Roads and Structures.pdf2018 Standard Specifications for Roads and Structures
2018 Standard Specifications Manual with ASTM.pdf2018 Standard Specifications Manual with ASTM
  
2018 Standard Specifications Manual
Was this page helpful?