| | | SP01G | PROJECT SPECIAL PROVISION (General) | 1995-07 |
| | | SP01G | AWARD OF CONTRACT | 2024-05 |
| | | SP01G | INTERESTED PARTIES LIST NOT REQUIRED | 2024-02 |
| | | SP01G | NOTICE TO BIDDERS (2 Cluster Projects) | 2024-01 |
| | | SP01G | NOTICE TO BIDDERS (3 Cluster Projects) | 2024-01 |
| | | SP01G | HAUL ROADS | 2024-07 |
| | | SP01G | BUILD AMERICA, BUY AMERICA (BABA) | 2024-07 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (with Permits) | 2023-05 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, with Permits) | 2023-05 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, No Permits) | 2023-05 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, with Permits) | 2023-05 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, with Permits) | 2023-05 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, No Permits) | 2023-05 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, No Permits) | 2023-05 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits) | 2007-12 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (Signals, No Permits) | 2007-12 |
| | | SP01G | CONTRACT TIME FOR ID IQ | 2022-02 |
| | | SP01G | INTERMEDIATE CONTRACT TIME #1 AND LIQ. DAMAGES (Reforestation) | 2012-02 |
| | | SP01G | CONTRACT TIME AND LIQUIDATED DAMAGES (No Permits) | 2012-02 |
| | | SP01G | INT. CONTRACT TIME #1, BONUS CLAUSE AND LIQ. DAMAGES | 2016-05 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Combined) | 2007-02 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Holiday Lane Closure) | 2007-02 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Lane Closure, Time Restricted) | 2007-02 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Road Closure Hour) | 2007-02 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Road Closure Minute) | 2013-10 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES FROM ___ TO ___ | 2013-06 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Consecutive Hours) | 2013-06 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Consecutive Days) | 2013-06 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Inductive Loop Installations) | 2013-05 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Dates, Maps) | 2013-06 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (Dates, TMP) | 2013-06 |
| | | SP01G | INTERMEDIATE CONTRACT TIMES (PEDESTRIAN CURB RAMP) | 2021-09 |
| | | SP01G | PROSECUTION OF WORK (Multiple Maps) | 2012-08 |
| | | SP01G | PERMANENT VEGETATION ESTABLISHMENT | 2024-01 |
| | | SP01G | RAILROAD GRADE CROSSING (Not on Interstate) | 2024-01 |
| | | SP01G | CONSTRUCTION MORATORIUM (Trout) | 2014-07 |
| | | SP01G | CONSTRUCTION MORATORIUM (Anadromous Fish) | 2014-07 |
| | | SP01G | CONSTRUCTION MORATORIUM (Bat) | 2016-01 |
| | | SP01G | DELAY IN RIGHT OF ENTRY | 2014-07 |
| | | SP01G | MAJOR CONTRACT ITEMS | 2024-01 |
| | | SP01G | NO MAJOR CONTRACT ITEMS | 2007-08 |
| | | SP01G | NO SPECIALTY ITEMS | 2024-01 |
| | | SP01G | SPECIALTY ITEMS | 2024-01 |
| | | SP01G | SPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST | 1995-07 |
| | | SP01G | FUEL PRICE ADJUSTMENT | 2024-01 |
| | | SP01G | FUEL PRICE ADJUSTMENT PAPER BID | 2024-01 |
| | | SP01G | STEEL PRICE ADJUSTMENT | 2022-12 |
| | | SP01G | PAYOUT SCHEDULE | 2012-01 |
| | | SP01G | SCHEDULE OF ESTIMATED COMPLETION PROGRESS | 2024-07 |
| | | SP01G | DISADVANTAGED BUSINESS ENTERPRISE (Central Let) | 2024-05 |
| | | SP01G | DISADVANTAGED BUSINESS ENTERPRISE (Division) | 2024-05 |
| | | SP01G | DISADVANTAGED BUSINESS ENTERPRISE (Local Government Agency) | 2024-05 |
| | | SP01G | MINORITY AND WOMEN BUSINESSES (Central Let) | 2024-05 |
| | | SP01G | MINORITY AND WOMEN BUSINESSES (Division) | 2024-05 |
| | | SP01G | MINORITY AND WOMEN BUSINESSES (Local Government Agency) | 2024-05 |
| | | SP01G | SMALL BUSINESS ENTERPRISE MULTI-YEAR MAINTENANCE CONTRACTS | 2022-04 |
| | | SP01G | SMALL BUSINESS ENTERPRISE | 2022-04 |
| | | SP01G | SMALL BUSINESS ENTERPRISE MULTI-YEAR MAINTENANCE CONTRACTS FOR ID IQ | 2022-02 |
| | | SP01G | MULTI-YEAR MAINTENANCE CONTRACTS FOR ID IQ | 2022-04 |
| | | SP01G | MULTI-YEAR MAINTENANCE CONTRACTS | 2022-04 |
| | | SP01G | CERTIFICATION FOR FEDERAL-AID CONTRACTS | 1990-03 |
| | | SP01G | RESTRICTIONS ON ITS EQUIPMENT AND SERVICES | 2020-11 |
| | | SP01G | USE OF UNMANNED AIRCRAFT SYSTEM (UAS) | 2019-08 |
| | | SP01G | CONSTRUCTION EQUIPMENT EMISSIONS | 2022-01 |
| | | SP01G | EQUIPMENT IDLING GUIDELINES | 2021-01 |
| | | SP01G | U.S. DOT HOTLINE | 2022-09 |
| | | SP01G | OFCCP MEGA CONSTRUCTION PROJECT PROGRAM | 2024-09 |
| | | SP01G | SUBSURFACE INFORMATION (Roadway Only) | 2022-08 |
| | | SP01G | SUBSURFACE INFORMATION (Structures Only) | 2022-08 |
| | | SP01G | SUBSURFACE INFORMATION (Roadway and Structures) | 1995-07 |
| | | SP01G | PORTABLE CONCRETE BARRIER (Partial Payment for Materials) | 2024-01 |
| | | SP01G | REMOVABLE PAVEMENT MARKINGS (Partial Payment for Materials) | 2024-01 |
| | | SP01G | MAINTENANCE OF THE PROJECT | 2024-01 |
| | | SP01G | COOPERATION BETWEEN CONTRACTORS | 2024-01 |
| | | SP01G | BID DOCUMENTATION | 2024-08 |
| | | SP01G | TWELVE-MONTH GUARANTEE | 2003-07 |
| | | SP01G | TWELVE-MONTH GUARANTEE (LGA Only) | 2013-10 |
| | | SP01G | OUTSOURCING OUTSIDE THE USA | 2006-05 |
| | | SP01G | EROSION & STORM WATER CERTIFICATION (Local Government Agency) | 2024-10 |
| | | SP01G | EROSION & STORM WATER CERTIFICATION (Central and Division) | 2024-10 |
| | | SP01G | PROCEDURE FOR MONITORING BORROW PIT DISCHARGE | 2024-01 |
| | | SP01R | PROJECT SPECIAL PROVISIONS (Roadway) | 1995-07 |
| | | SP01R | SHOULDER CONSTRUCTION | 2024-01 |
| | | SP01R | SHOULDER RECONSTRUCTION | 2023-01 |
| | | SP01R | SHOULDER CONSTRUCTION PROCEDURE | 2013-10 |
| | | SP01R | SHOULDER RECONSTRUCTION PROCEDURE | 2013-10 |
| | | SP01R | CONSTRUCTION SEQUENCE | 2012-08 |
| | | SP02R | CLEARING AND GRUBBING (Method II) | 2024-03 |
| | | SP02R | CLEARING AND GRUBBING (Method III) | 2024-03 |
| | | SP02R | CLEARING AND GRUBBING (Modified Method III) | 2024-03 |
| | | SP02R | BURNING RESTRICTION | 1995-07 |
| | | SP02R | DEMOLITION OF BUILDING AND APPURTENANCES | 2024-01 |
| | | SP02R | BUILDING REMOVAL (Inside ROW) | 2024-01 |
| | | SP02R | BUILDING REMOVAL (Cut Building at ROW) | 2024-01 |
| | | SP02R | BUILDING REMOVAL (Both sides of ROW) | 2024-01 |
| | | SP02R | BUILDING AND UNDERGROUND STORAGE TANK REMOVAL | 2024-01 |
| | | SP02R | LUMP SUM GRADING | 2024-01 |
| | | SP02R | TEMPORARY DETOURS (Lump Sum Grading) | 2015-04 |
| | | SP02R | TEMPORARY DETOURS (No lump sum grading) | 2013-11 |
| | | SP02R | TEMPORARY DETOURS (Exceptions to Lump Sum Grading) | 2014-02 |
| | | SP02R | SHOULDER AND FILL SLOPE MATERIAL (Lump Sum Grading) | 2024-01 |
| | | SP02R | SHOULDER AND FILL SLOPE MATERIAL (No Lump Sum Grading) | 2024-01 |
| | | SP02R | BORROW EXCAVATION (Truck Measurement) | 2024-01 |
| | | SP02R | BORROW EXCAVATION (In Place or Truck Measurement) | 2024-01 |
| | | SP02R | COAL COMBUSTION PRODUCTS IN EMBANKMENTS | 2024-01 |
| | | SP02R | MANUFACTURED QUARRY FINES IN EMBANKMENTS | 2024-04 |
| | | SP03R | REINFORCED CONCRETE TAPERED INLET | 2024-01 |
| | | SP03R | FLOWABLE FILL | 2024-01 |
| | | SP03R | CORRUGATED ALUMINUM ALLOY CULVERT PIPE | 2024-01 |
| | | SP03R | CORRUGATED ALUMINUM ALLOY PIPE ARCH CULVERT | 2024-09 |
| | | SP04R | BRIDGE APPROACH FILLS | 2024-01 |
| | | SP05R | AUTOMATED FINE GRADING | 2024-01 |
| | | SP05R | GEOTEXTILE FOR SUBGRADE STABILIZATION | 2024-04 |
| | | SP05R | STABILIZATION OF COASTAL PLAIN SANDS | 2014-11 |
| | | SP05R | AGGREGATE SUBGRADE IN LIEU OF CHEMICAL STABILIZATION | 2024-01 |
| | | SP05R | SOIL-CEMENT BASE (FULL DEPTH RECLAMATION) | 2024-01 |
| | | SP05R | INCIDENTAL STONE BASE | 2024-01 |
| | | SP06R | SHOULDER WEDGE | 2024-01 |
| | | SP06R | PRICE ADJUSTMENT FOR ASPHALT BINDER FOR PLANT MIX | 2024-01 |
| | | SP06R | FINAL SURFACE TESTING NOT REQUIRED | 2016-02 |
| | | SP06R | ASPHALT SURFACE TREATMENT AGGREGATE TYPE AND APPLICATION RATES | 2018-01 |
| | | SP06R | MILLED RUMBLE STRIPS ON ASPHALT CONCRETE SHOULDERS | 2024-11 |
| | | SP06R | CENTERLINE MILLED RUMBLE STRIPS ON ASPHALT CONCRETE | 2024-11 |
| | | SP06R | REPAIR OF EXISTING PAVEMENT | 2024-01 |
| | | SP06R | RESURFACING EXISTING BRIDGES | 2012-08 |
| | | SP06R | RESURFACING EXISTING BRIDGES (With Milling) | 2012-08 |
| | | SP06R | PAVING DRIVEWAYS AND MAILBOX TURNOUTS (State Forces) | 2012-08 |
| | | SP06R | PAVING DRIVEWAYS AND MAILBOX TURNOUTS (Contractor Forces) | 2012-08 |
| | | SP06R | PAVEMENT WIDTH VARIES | 2012-08 |
| | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Base Course, Contractor Disposes of Excess) | 2024-01 |
| | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Int. Course, Contractor Disposes of Excess) | 2024-01 |
| | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Base Course, State Disposes of Excess) | 2024-01 |
| | | SP06R | TRENCHING FOR ASPHALT xxx COURSE (Int. Course, State Disposes of Excess) | 2024-01 |
| | | SP06R | ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5__ (Leveling Course) | 2024-01 |
| | | SP06R | PATCHING EXISTING PAVEMENT | 2024-01 |
| | | SP08R | MODIFIED CONCRETE FLUME WITH CONCRETE OUTLET | 2024-01 |
| | | SP08R | HORIZONTAL DRAINS | 2024-01 |
| | | SP08R | CONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET | 2024-01 |
| | | SP08R | CONVERTING EXISTING __TO__ | 2024-01 |
| | | SP08R | REMOVAL AND STOCKPILE OF EXISTING GUARDRAIL | 2006-07 |
| | | SP08R | IMPACT ATTENUATOR UNITS, TYPE TL-__ | 2024-08 |
| | | SP08R | STEEL FENCE POSTS FOR WOVEN WIRE FENCE | 2024-11 |
| | | SP08R | TEMPORARY WOVEN WIRE FENCE | 2024-01 |
| | | SP08R | ADJUSTMENT OF MANHOLES | 2024-01 |
| | | SP08R | ADJUSTMENT OF MANHOLES | 2024-01 |
| | | SP08R | ADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES | 2024-01 |
| | | SP08R | CHAIN LINK FENCE w/ BARBED WIRE ON EXTENSION ARMS | 2024-01 |
| | | SP09R | FOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES | 2024-01 |
| | | SP09R | OVERHEAD AND DYNAMIC MESSAGE SIGN FOUNDATIONS | 2024-01 |
| | | SP10R | HIGH STRENGTH CONCRETE FOR DRIVEWAYS | 2024-01 |
| | | SP10R | ELECTRONIC TICKETING SYSTEM | 2024-07 |
| | | SP10R | GLASS BEAD GRADATION FOR PAVEMENT MARKINGS | 2024-09 |
| | | SP10R | ELECTRICAL JUNCTION BOXES | 2024-06 |
| | | SP11R | TEMPORARY SHORING | 2024-01 |
| | | SP11R | CONES | 2024-03 |
| | | SP12R | SNOWPLOWABLE DELINEATION | 2024-10 |
| | | SP14R | ROADWAY LIGHTING FOUNDATIONS | 2024-01 |
| | | SP16R | WATTLE DEVICES | 2024-01 |
| | | SP16R | PERMANENT SEEDING AND MULCHING | 2024-01 |
| | | SP16R | EROSION AND STORMWATER CONTROL FOR SHOULDER (Central and Division) | 2020-01 |
| | | SP16R | EROSION AND STORMWATER CONTROL FOR SHOULDER (Local Government Agency) | 2024-10 |
| | | Z | PERMITS COVER (Delete Not Applicable Information) | 2024-10 |
| | | Z | PERMIT COVER (No Additional Permits) | 2024-10 |
| | | Z | AVAILABILITY OF FUNDS | 2024-01 |
| | | Z | SEED QUALITY (Use ONLY if seeding is required on project) | 2011-05 |
| | | Z | ERRATA | 2024-01 |
| | | Z | Plant Pest Quarantine | 2019-05 |
| | | Z | MINIMUM WAGE (State Funded) | 2009-07 |
| | | Z | TITLE VI AND NONDISCRIMINATION | 2024-01 |
| | | Z | MINORITY AND FEMALE EMPLOYMENT (Prime Contractor Company wide) | 2000-00 |
| | | Z | FHWA 1273 | 2023-10 |
| | | Z | On the Job Training - USE ON ALL PROJECTS | 2015-04 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2024-01 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2024-01 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2024-01 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2024-01 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2024-01 |
| | | Z | DAVIS BACON WAGE RATE DETERMINATIONS | 2024-01 |
| | | Z | LISTING OF DBE SUBCONTRACTORS (Federal Aid - Paper Bid) | 2015-04 |
| | | Z | LISTING OF MBE/WBE SUBCONTRACTORS (State Funded - Paper Bid) | 2015-04 |
| | | Z | PAYMENT BOND FORMS | 2012-11 |
| | | Z | PERFORMANCE BOND FORMS | 2012-11 |
| | | Z | Bid Bond Form | 2023-10 |
| | | Z | ADDENDA | 2023-10 |
| | | Z | AWARD LIMITS ON MULTIPLE PROJECTS | 2012-01 |
| | | Z | PO PROPOSAL BID FORM | 2024-10 |
| | | Z | Execution of Bid | 2023-10 |
| | | Z | SIGNATURE SHEET | 2012-01 |
| | | Z | Signature Sheet (Central Let) | 2012-01 |
| | | Z | GREENWAYS AND MULTI-USE PATHS | 2024-01 |