SP01 G000.docx
  
SP01GPROJECT SPECIAL PROVISION (General)1995-07
SP01 G001.docx
  
SP01GAWARD OF CONTRACT2024-05
SP01 G002.docx
  
SP01GINTERESTED PARTIES LIST NOT REQUIRED2024-02
SP01 G003A.docx
  
SP01GNOTICE TO BIDDERS (2 Cluster Projects)2024-01
SP01 G003B.docx
  
SP01GNOTICE TO BIDDERS (3 Cluster Projects)2024-01
SP01 G004.docx
  
SP01GHAUL ROADS2024-07
SP01 G005.docx
  
SP01GBUILD AMERICA, BUY AMERICA (BABA)2024-07
SP01 G006.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (with Permits)2023-05
SP01 G007A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, with Permits)2023-05
SP01 G007B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, No Permits)2023-05
SP01 G008A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, with Permits)2023-05
SP01 G008B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, with Permits)2023-05
SP01 G008C.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Reforestation, No Permits)2023-05
SP01 G008D.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Float, Reforestation, No Permits)2023-05
SP01 G010A.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (No Permits)2007-12
SP01 G010B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (Signals, No Permits)2007-12
SP01 G011.docx
  
SP01GCONTRACT TIME FOR ID IQ2022-02
SP01 G013A.docx
  
SP01GINTERMEDIATE CONTRACT TIME #1 AND LIQ. DAMAGES (Reforestation)2012-02
SP01 G013B.docx
  
SP01GCONTRACT TIME AND LIQUIDATED DAMAGES (No Permits)2012-02
SP01 G013C.docx
  
SP01GINT. CONTRACT TIME #1, BONUS CLAUSE AND LIQ. DAMAGES2016-05
SP01 G014A.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Combined)2007-02
SP01 G014B.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Holiday Lane Closure)2007-02
SP01 G014C.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Lane Closure, Time Restricted)2007-02
SP01 G014D.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Road Closure Hour)2007-02
SP01 G014E.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Road Closure Minute)2013-10
SP01 G014F.docx
  
SP01GINTERMEDIATE CONTRACT TIMES FROM ___ TO ___2013-06
SP01 G014G.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Consecutive Hours)2013-06
SP01 G014H.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Consecutive Days)2013-06
SP01 G014I.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Inductive Loop Installations)2013-05
SP01 G014K.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Dates, Maps)2013-06
SP01 G014L.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (Dates, TMP)2013-06
SP01 G014M.docx
  
SP01GINTERMEDIATE CONTRACT TIMES (PEDESTRIAN CURB RAMP)2021-09
SP01 G015R.docx
  
SP01GPROSECUTION OF WORK (Multiple Maps)2012-08
SP01 G016.docx
  
SP01GPERMANENT VEGETATION ESTABLISHMENT2024-01
SP01 G017R.docx
  
SP01GRAILROAD GRADE CROSSING (Not on Interstate)2024-01
SP01 G018A.docx
  
SP01GCONSTRUCTION MORATORIUM (Trout)2014-07
SP01 G018B.docx
  
SP01GCONSTRUCTION MORATORIUM (Anadromous Fish)2014-07
SP01 G018C.docx
  
SP01GCONSTRUCTION MORATORIUM (Bat)2016-01
SP01 G022.docx
  
SP01GDELAY IN RIGHT OF ENTRY2014-07
SP01 G028.docx
  
SP01GMAJOR CONTRACT ITEMS2024-01
SP01 G031.docx
  
SP01GNO MAJOR CONTRACT ITEMS2007-08
SP01 G034.docx
  
SP01GNO SPECIALTY ITEMS2024-01
SP01 G037.docx
  
SP01GSPECIALTY ITEMS2024-01
SP01 G040.docx
  
SP01GSPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST1995-07
SP01 G043.docx
  
SP01GFUEL PRICE ADJUSTMENT2024-01
SP01 G044.docx
  
SP01GFUEL PRICE ADJUSTMENT PAPER BID2024-01
SP01 G047.docx
  
SP01GSTEEL PRICE ADJUSTMENT2022-12
SP01 G057.docx
  
SP01GPAYOUT SCHEDULE2012-01
SP01 G058.docx
  
SP01GSCHEDULE OF ESTIMATED COMPLETION PROGRESS2024-07
SP01 G061.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Central Let)2024-05
SP01 G062.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Division)2024-05
SP01 G063.docx
  
SP01GDISADVANTAGED BUSINESS ENTERPRISE (Local Government Agency)2024-05
SP01 G066.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Central Let)2024-05
SP01 G067.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Division)2024-05
SP01 G068.docx
  
SP01GMINORITY AND WOMEN BUSINESSES (Local Government Agency)2024-05
SP01 G072.docx
  
SP01GSMALL BUSINESS ENTERPRISE MULTI-YEAR MAINTENANCE CONTRACTS2022-04
SP01 G073.docx
  
SP01GSMALL BUSINESS ENTERPRISE2022-04
SP01 G074.docx
  
SP01GSMALL BUSINESS ENTERPRISE MULTI-YEAR MAINTENANCE CONTRACTS FOR ID IQ2022-02
SP01 G075.docx
  
SP01GMULTI-YEAR MAINTENANCE CONTRACTS FOR ID IQ2022-04
SP01 G076.docx
  
SP01GMULTI-YEAR MAINTENANCE CONTRACTS2022-04
SP01 G085.docx
  
SP01GCERTIFICATION FOR FEDERAL-AID CONTRACTS1990-03
SP01 G090.docx
  
SP01GRESTRICTIONS ON ITS EQUIPMENT AND SERVICES2020-11
SP01 G092.docx
  
SP01GUSE OF UNMANNED AIRCRAFT SYSTEM (UAS)2019-08
SP01 G094.docx
  
SP01GCONSTRUCTION EQUIPMENT EMISSIONS2022-01
SP01 G096.docx
  
SP01GEQUIPMENT IDLING GUIDELINES2021-01
SP01 G100.docx
  
SP01GU.S. DOT HOTLINE2022-09
SP01 G107.docx
  
SP01GOFCCP MEGA CONSTRUCTION PROJECT PROGRAM2024-09
SP01 G112A.docx
  
SP01GSUBSURFACE INFORMATION (Roadway Only)2022-08
SP01 G112B.docx
  
SP01GSUBSURFACE INFORMATION (Structures Only)2022-08
SP01 G112C.docx
  
SP01GSUBSURFACE INFORMATION (Roadway and Structures)1995-07
SP01 G121.docx
  
SP01GPORTABLE CONCRETE BARRIER (Partial Payment for Materials)2024-01
SP01 G124.docx
  
SP01GREMOVABLE PAVEMENT MARKINGS (Partial Payment for Materials)2024-01
SP01 G125.docx
  
SP01GMAINTENANCE OF THE PROJECT2024-01
SP01 G133.docx
  
SP01GCOOPERATION BETWEEN CONTRACTORS2024-01
SP01 G142.docx
  
SP01GBID DOCUMENTATION2024-08
SP01 G145.docx
  
SP01GTWELVE-MONTH GUARANTEE2003-07
SP01 G146.docx
  
SP01GTWELVE-MONTH GUARANTEE (LGA Only)2013-10
SP01 G150.docx
  
SP01GOUTSOURCING OUTSIDE THE USA2006-05
SP01 G179.docx
  
SP01GEROSION & STORM WATER CERTIFICATION (Local Government Agency)2024-10
SP01 G180.docx
  
SP01GEROSION & STORM WATER CERTIFICATION (Central and Division)2024-10
SP01 G181.docx
  
SP01GPROCEDURE FOR MONITORING BORROW PIT DISCHARGE2024-01
SP01 R001.docx
  
SP01RPROJECT SPECIAL PROVISIONS (Roadway)1995-07
SP01 R004R.docx
  
SP01RSHOULDER CONSTRUCTION2024-01
SP01 R007R.docx
  
SP01RSHOULDER RECONSTRUCTION2023-01
SP01 R010AR.docx
  
SP01RSHOULDER CONSTRUCTION PROCEDURE2013-10
SP01 R010BR.docx
  
SP01RSHOULDER RECONSTRUCTION PROCEDURE2013-10
SP01 R034R.docx
  
SP01RCONSTRUCTION SEQUENCE2012-08
SP02 R002A.docx
  
SP02RCLEARING AND GRUBBING (Method II)2024-03
SP02 R002B.docx
  
SP02RCLEARING AND GRUBBING (Method III)2024-03
SP02 R002C.docx
  
SP02RCLEARING AND GRUBBING (Modified Method III)2024-03
SP02 R005.docx
  
SP02RBURNING RESTRICTION1995-07
SP02 R010.docx
  
SP02RDEMOLITION OF BUILDING AND APPURTENANCES2024-01
SP02 R015A.docx
  
SP02RBUILDING REMOVAL (Inside ROW)2024-01
SP02 R015B.docx
  
SP02RBUILDING REMOVAL (Cut Building at ROW)2024-01
SP02 R015C.docx
  
SP02RBUILDING REMOVAL (Both sides of ROW)2024-01
SP02 R015D.docx
  
SP02RBUILDING AND UNDERGROUND STORAGE TANK REMOVAL2024-01
SP02 R016.docx
  
SP02RLUMP SUM GRADING2024-01
SP02 R030A.docx
  
SP02RTEMPORARY DETOURS (Lump Sum Grading)2015-04
SP02 R030B.docx
  
SP02RTEMPORARY DETOURS (No lump sum grading)2013-11
SP02 R030C.docx
  
SP02RTEMPORARY DETOURS (Exceptions to Lump Sum Grading)2014-02
SP02 R045A.docx
  
SP02RSHOULDER AND FILL SLOPE MATERIAL (Lump Sum Grading)2024-01
SP02 R045B.docx
  
SP02RSHOULDER AND FILL SLOPE MATERIAL (No Lump Sum Grading)2024-01
SP02 R057.docx
  
SP02RBORROW EXCAVATION (Truck Measurement)2024-01
SP02 R058.docx
  
SP02RBORROW EXCAVATION (In Place or Truck Measurement)2024-01
SP02 R070.docx
  
SP02RCOAL COMBUSTION PRODUCTS IN EMBANKMENTS2024-01
SP02 R072.docx
  
SP02RMANUFACTURED QUARRY FINES IN EMBANKMENTS2024-04
SP03 R005.docx
  
SP03RREINFORCED CONCRETE TAPERED INLET2024-01
SP03 R030.docx
  
SP03RFLOWABLE FILL2024-01
SP03 R034.docx
  
SP03RCORRUGATED ALUMINUM ALLOY CULVERT PIPE2024-01
SP03 R036.docx
  
SP03RCORRUGATED ALUMINUM ALLOY PIPE ARCH CULVERT2024-09
SP04 R002.docx
  
SP04RBRIDGE APPROACH FILLS2024-01
SP05 R005.docx
  
SP05RAUTOMATED FINE GRADING2024-01
SP05 R009.docx
  
SP05RGEOTEXTILE FOR SUBGRADE STABILIZATION2024-04
SP05 R012.docx
  
SP05RSTABILIZATION OF COASTAL PLAIN SANDS2014-11
SP05 R017.docx
  
SP05RAGGREGATE SUBGRADE IN LIEU OF CHEMICAL STABILIZATION2024-01
SP05 R020.docx
  
SP05RSOIL-CEMENT BASE (FULL DEPTH RECLAMATION)2024-01
SP05 R028R.docx
  
SP05RINCIDENTAL STONE BASE2024-01
SP06 R003R.docx
  
SP06RSHOULDER WEDGE2024-01
SP06 R025.docx
  
SP06RPRICE ADJUSTMENT FOR ASPHALT BINDER FOR PLANT MIX2024-01
SP06 R045.docx
  
SP06RFINAL SURFACE TESTING NOT REQUIRED2016-02
SP06 R054.docx
  
SP06RASPHALT SURFACE TREATMENT AGGREGATE TYPE AND APPLICATION RATES2018-01
SP06 R056.docx
  
SP06RMILLED RUMBLE STRIPS ON ASPHALT CONCRETE SHOULDERS2024-11
SP06 R057.docx
  
SP06RCENTERLINE MILLED RUMBLE STRIPS ON ASPHALT CONCRETE2024-11
SP06 R058R.docx
  
SP06RREPAIR OF EXISTING PAVEMENT2024-01
SP06 R061AR.docx
  
SP06RRESURFACING EXISTING BRIDGES2012-08
SP06 R061BR.docx
  
SP06RRESURFACING EXISTING BRIDGES (With Milling)2012-08
SP06 R070AR.docx
  
SP06RPAVING DRIVEWAYS AND MAILBOX TURNOUTS (State Forces)2012-08
SP06 R070BR.docx
  
SP06RPAVING DRIVEWAYS AND MAILBOX TURNOUTS (Contractor Forces)2012-08
SP06 R076R.docx
  
SP06RPAVEMENT WIDTH VARIES2012-08
SP06 R079AR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Base Course, Contractor Disposes of Excess)2024-01
SP06 R079BR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Int. Course, Contractor Disposes of Excess)2024-01
SP06 R082AR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Base Course, State Disposes of Excess)2024-01
SP06 R082BR.docx
  
SP06RTRENCHING FOR ASPHALT xxx COURSE (Int. Course, State Disposes of Excess)2024-01
SP06 R085R.docx
  
SP06RASPHALT CONCRETE SURFACE COURSE, TYPE  S9.5__ (Leveling Course)2024-01
SP06 R088R.docx
  
SP06RPATCHING EXISTING PAVEMENT2024-01
SP08 R010.docx
  
SP08RMODIFIED CONCRETE FLUME WITH CONCRETE OUTLET2024-01
SP08 R017.docx
  
SP08RHORIZONTAL DRAINS2024-01
SP08 R045.docx
  
SP08RCONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET2024-01
SP08 R050.docx
  
SP08RCONVERTING EXISTING __TO__2024-01
SP08 R055.docx
  
SP08RREMOVAL AND STOCKPILE OF EXISTING GUARDRAIL2006-07
SP08 R075.docx
  
SP08RIMPACT ATTENUATOR UNITS, TYPE TL-__2024-08
SP08 R084.docx
  
SP08RSTEEL FENCE POSTS FOR WOVEN WIRE FENCE2024-11
SP08 R085.docx
  
SP08RTEMPORARY WOVEN WIRE FENCE2024-01
SP08 R095R.docx
  
SP08RADJUSTMENT OF MANHOLES2024-01
SP08 R096R.docx
  
SP08RADJUSTMENT OF MANHOLES2024-01
SP08 R097R.docx
  
SP08RADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES2024-01
SP08 R100.docx
  
SP08RCHAIN LINK FENCE w/ BARBED WIRE ON EXTENSION ARMS2024-01
SP09 R005.docx
  
SP09RFOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES2024-01
SP09 R007.docx
  
SP09ROVERHEAD AND DYNAMIC MESSAGE SIGN FOUNDATIONS2024-01
SP10 R002.docx
  
SP10RHIGH STRENGTH CONCRETE FOR DRIVEWAYS2024-01
SP10 R020.docx
  
SP10RELECTRONIC TICKETING SYSTEM2024-07
SP10 R087.docx
  
SP10RGLASS BEAD GRADATION FOR PAVEMENT MARKINGS2024-09
SP10 R091.docx
  
SP10RELECTRICAL JUNCTION BOXES2024-06
SP11 R002.docx
  
SP11RTEMPORARY SHORING2024-01
SP11 R035.docx
  
SP11RCONES2024-03
SP12 R053.docx
  
SP12RSNOWPLOWABLE DELINEATION2024-10
SP14 R004.docx
  
SP14RROADWAY LIGHTING FOUNDATIONS2024-01
SP16 R001.docx
  
SP16RWATTLE DEVICES2024-01
SP16 R002.docx
  
SP16RPERMANENT SEEDING AND MULCHING2024-01
SP16 R003R.docx
  
SP16REROSION AND STORMWATER CONTROL FOR SHOULDER (Central and Division)2020-01
SP16 R004R.docx
  
SP16REROSION AND STORMWATER CONTROL FOR SHOULDER (Local Government Agency)2024-10
Z001.docx
  
ZPERMITS COVER (Delete Not Applicable Information)2024-10
Z001A.docx
  
ZPERMIT COVER (No Additional Permits)2024-10
Z002.docx
  
ZAVAILABILITY OF FUNDS2024-01
Z003.docx
  
ZSEED QUALITY (Use ONLY if seeding is required on project)2011-05
Z004.docx
  
ZERRATA2024-01
Z004A.docx
  
ZPlant Pest Quarantine2019-05
Z005.docx
  
ZMINIMUM WAGE (State Funded)2009-07
Z006.docx
  
ZTITLE VI AND NONDISCRIMINATION2024-01
Z007.docx
  
ZMINORITY AND FEMALE EMPLOYMENT (Prime Contractor Company wide)2000-00
Z008.docx
  
ZFHWA 12732023-10
Z010.docx
  
ZOn the Job Training - USE ON ALL PROJECTS2015-04
Z086.docx
  
ZDAVIS BACON WAGE RATE DETERMINATIONS2024-01
Z087.docx
  
ZDAVIS BACON WAGE RATE DETERMINATIONS2024-01
Z088.docx
  
ZDAVIS BACON WAGE RATE DETERMINATIONS2024-01
Z089.docx
  
ZDAVIS BACON WAGE RATE DETERMINATIONS2024-01
Z090.docx
  
ZDAVIS BACON WAGE RATE DETERMINATIONS2024-01
Z091.docx
  
ZDAVIS BACON WAGE RATE DETERMINATIONS2024-01
Z110.docx
  
ZLISTING OF DBE SUBCONTRACTORS (Federal Aid - Paper Bid)2015-04
Z115.docx
  
ZLISTING OF MBE/WBE SUBCONTRACTORS (State Funded - Paper Bid)2015-04
Z118.docx
  
ZPAYMENT BOND FORMS2012-11
Z120.docx
  
ZPERFORMANCE BOND FORMS2012-11
Z122.docx
  
ZBid Bond Form2023-10
Z124.docx
  
ZADDENDA2023-10
Z125.docx
  
ZAWARD LIMITS ON MULTIPLE PROJECTS2012-01
Z130.docx
  
ZPO PROPOSAL BID FORM2024-10
Z135.docx
  
ZExecution of Bid2023-10
Z136.docx
  
ZSIGNATURE SHEET2012-01
Z140.docx
  
ZSignature Sheet (Central Let)2012-01
Z200.docx
  
ZGREENWAYS AND MULTI-USE PATHS2024-01
  • NOTE: Download Files

    ​The best way to access these files is to download them first.  Use the ... to download the files.

    Download Image.jpg

  
  
2024 Standard Specifications for Roads and Structures.pdf
  
2024 Standard Specifications Revision Memo Signed - Addendum.pdf
  
2024 Standard Specifications Revision Memo Signed - Addendum2.pdf
  
2024 Standard Specifications Revision Memo Signed.pdf
  
Federal and State Funded Provisions Listing.xlsx
  
The 2024 Line Up Sheet for All Provisions - Federally Funded.aspx
  
The 2024 Line Up Sheet for All Provisions - State Funded.aspx
  
No content found
Was this page helpful?