No content found

 Asphalt Binder QC/QA Program Manual Search Results

 

 

05 APPENDICES102370836/26/2017 6:38:48 PMContents APPENDIX I EXAMPLE MODEL PERFORMANCE GRADED BINDER QUALITY CONTROL PLAN APPENDIX II NCDOT SECTION 1020 https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalseSystem Account;Nathan Garcia
04 PRODUCT IDENTIFICATION PROCEDURES102368856/21/2017 8:52:25 PMIn addition to the identification required by the applicable AASHTO specifications, the Producer’s QC Plan, and by the NCDOT Standard Specifications, the PGAB Bill of Lading https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalseNathan Garcia
03 SAMPLING AND TESTING PROCEDURES102368866/27/2017 12:01:42 PMContents A. Producer's QC B. Sample Identification and Record https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalseSystem Account;Nathan Garcia
02 PROGRAM REQUIREMENTS102370846/21/2017 7:40:42 PMContents A. BASIC REQUIREMENTS B. QC PLAN The Producer’s facility must have an https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalseSystem Account;Nathan Garcia
01 GENERAL DESCRIPTION102370826/19/2017 8:10:51 PMThe Performance Graded Asphalt Binder (PGAB) Quality Control (QC)/Quality Assurance (QA) Program is designed to give Producers/Suppliers [henceforth Producer designates Producer https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalseSystem Account;Nathan Garcia

 Related Documents

 

 

2021 Aggregate QCQA Program Manual128807037/19/2021 9:07:38 PM7/19/2021 9:07:38 PMThe Aggregate Quality Control/Quality Assurance Program is designed to allow aggregate producers the responsibility for controlling the quality of material they produce, and to STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{A1790172-F3A7-49F2-BBD0-2D69F0EE269E}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Appendices RFID Tag Parameters Plastic Pipe43830077/29/2021 2:06:30 PM7/29/2021 2:06:30 PMRFID Tag Parameters for use on Plastic Pipe Dimensions: Must be a minimum size of 4.5”x 1”x .017”, with the option of being larger Material: .002’thick Polyester; total tag STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{408C6070-5C87-49E9-8D2F-841EC53428F2}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Appendices RFID Tag Parameters Concrete Pipe43830087/29/2021 2:04:33 PM7/29/2021 2:04:33 PMRFID Tag Parameters for use on Concrete Pipe Material: .003" thick Polyester for subsurface printing Additional polyester layers total .2” Tag must be slotted on either end and STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{0AAE2503-EFF1-4B08-B0DB-347CDA734F28}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Appendices RFID Tag Parameters Metal Pipe43830097/29/2021 2:05:25 PM7/29/2021 2:05:25 PMRFID Tag Parameters for use on Metal Pipe Dimensions: Must be a minimum size of 2.875”x 1.375”x .085”, with the option of being larger Material: .002" thick Polyester label adhered STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{171B1A84-FA51-4F1C-B39E-88494C296DF1}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
085 SRW 2016 annual facility audit102379164/20/2016 5:23:10 PM4/20/2016 5:23:10 PMSegmental Retaining Wall Units Annual Facility Audit The review of documentation and collection of samples will confirm the facility meets all NCDOT standards, and is in compliance STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{29633B8D-F180-44B9-936A-5078CCB5283C}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2004_10_09_HDPE QC102379184/19/2016 3:06:37 PM4/19/2016 3:06:37 PM STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION MATERIALS & TESTS STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{583B1CCF-4372-49DF-807B-933B76F87EA4}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2004_10_14_Joining Dissimilar Pipe Materal102379194/22/2016 1:41:03 PM4/22/2016 1:41:03 PMMICHAEL F. EASLEY PO BOX 25201, RALEIGH, NC 27611-5201 W. LYNDO TIPPETT Questions have arisen concerning the joining of dissimilar pipe materials such as STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{C75C43FF-7E90-4611-85A1-6B08589407DB}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Cylinders102379205/10/2016 4:42:25 PM5/10/2016 4:42:25 PMSUBJECT: Making, Storing and Transporting Concrete Cylinders We continue to see improperly made, stored and cured concrete cylinders delivered to the Materials and Tests STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{A67ABC69-09C1-4B97-9240-EA5FA0387872}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Min_Sampling102379219/27/2016 6:53:59 PM9/27/2016 6:53:59 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{6703AE45-A589-4CE7-ABF8-D67DC1E0EFD2}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2012 QMS Asphalt Manual102379223/20/2013 1:55:38 PM3/20/2013 1:55:38 PMIt is intended to serve as a basic introduction to asphalt construction for the new technician as well as a reference source to those with considerable experience STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{47DDF430-69EC-42A0-8278-D7F938D35636}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?