<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/Materials/Pages/Asphalt-Binder-QC-QA-Manual-Text.aspx?Method=ABM-01-01'>01 General Description</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/Materials/Pages/Asphalt-Binder-QC-QA-Manual-Text.aspx?Method=ABM-01-02'>02 Program Requirements</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/Materials/Pages/Asphalt-Binder-QC-QA-Manual-Text.aspx?Method=ABM-01-03'>03 Sampling and Testing Procedures</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/Materials/Pages/Asphalt-Binder-QC-QA-Manual-Text.aspx?Method=ABM-01-04'>04 Product Identification Procedures</a>
<a style='float:left;text-align:left;margin-left:20px;' href='https://connect.ncdot.gov/resources/Materials/Pages/Asphalt-Binder-QC-QA-Manual-Text.aspx?Method=ABM-01-05'>05 Appendices</a>

 Asphalt Binder QC/QA Program Manual Search Results

 

 

04 PRODUCT IDENTIFICATION PROCEDURES143479936/21/2017 8:52:25 PMIn addition to the identification required by the applicable AASHTO specifications, the Producer’s QC Plan, and by the NCDOT Standard Specifications, the PGAB Bill of Lading https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalse
02 PROGRAM REQUIREMENTS143479926/21/2017 7:40:42 PMContents A. BASIC REQUIREMENTS B. QC PLAN The Producer’s facility must have an https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalse
03 SAMPLING AND TESTING PROCEDURES143479946/27/2017 12:01:42 PMContents A. Producer's QC B. Sample Identification and Record https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalse
01 GENERAL DESCRIPTION143479906/19/2017 8:10:51 PMThe Performance Graded Asphalt Binder (PGAB) Quality Control (QC)/Quality Assurance (QA) Program is designed to give Producers/Suppliers [henceforth Producer designates Producer https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalse
05 APPENDICES143479916/26/2017 6:38:48 PMContents APPENDIX I EXAMPLE MODEL PERFORMANCE GRADED BINDER QUALITY CONTROL PLAN APPENDIX II NCDOT SECTION 1020 https://connect.ncdot.gov/resources/Materials/Lists/AsphaltBinderQCQAManual/AllItems.aspxFalse

 Related Documents

 

 

085 SRW 2016 annual facility audit143480464/20/2016 5:23:10 PM4/20/2016 5:23:10 PMSegmental Retaining Wall Units Annual Facility Audit The review of documentation and collection of samples will confirm the facility meets all NCDOT standards, and is in compliance STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{29633B8D-F180-44B9-936A-5078CCB5283C}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Cylinders143480505/10/2016 4:42:25 PM5/10/2016 4:42:25 PMSUBJECT: Making, Storing and Transporting Concrete Cylinders We continue to see improperly made, stored and cured concrete cylinders delivered to the Materials and Tests STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{A67ABC69-09C1-4B97-9240-EA5FA0387872}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2012_ROADWAY - Geotextile for Pavement Stabilization (January 2014)143480524/26/2016 4:05:41 PM4/26/2016 4:05:41 PMFurnish and place geotextile for pavement stabilization in accordance with the contract Geotextile for pavement stabilization may be required to prevent pavement cracking and STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{7B4E2518-86E9-4BFE-8C94-2C8AAD22D305}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2014 - Aggregate Plant Ownership Update Form1434805310/3/2014 3:43:52 PM10/3/2014 3:43:52 PMRevised 9/30/14 JSE NCDOT Aggregate QC/QA Plant Ownership Update Name of Company: Name of Facility: NCDOT Facility Number: CA FA Facility Mailing STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{F85AAD30-E1D5-479A-862B-32DF37BC303B}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2015 Precast Concrete Facility Ownership Update143480544/20/2016 7:52:13 PM4/20/2016 7:52:13 PMName And Title Of On-Site Contact TO BE COMPLETED BY MATERIALS & TESTS UNIT REPRESENTATIVE I certify that the foregoing entries are correct STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{E2CF0E2E-EC6B-4B07-9A7C-E1DD120ABF35}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2015_01_16 Concrete Air Meter Request Form Field143480555/3/2016 8:42:55 PM5/3/2016 8:42:55 PM CONCRETE AIR METER REQUEST FORM RETURN FORM TO M&T DIVISION SMS FORM MUST BE COMPLETE AND SIGNED TO PROCESS ORDER TYPE B PRESSURE METER (FORNEY TYPE STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{0A6244B5-99D1-41D7-9C6F-C1B4AFB52516}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
A-24 Asphalt Compatibility Test143481165/17/2016 5:01:02 PM5/17/2016 5:01:02 PM NCDOT M&T Asphalt Procedure A-24 Created on 6/18/1999 9:11:00 AM Version: Rev 2, Modified 20160405 C:\Users\tdnaylor\Desktop\A-24 Asphalt STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{7DD7A1C4-24C5-4D03-900E-0E1D95D80FCB}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
ABC Sampling Manual1434811711/15/2021 1:44:43 PM11/15/2021 1:44:43 PMSection 2 – Importance of Proper Sampling A sample is defined as a “portion, piece, or segment that is representative of a whole Therefore, it is important that the procedure(s STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{8E8B919D-E7C7-4F28-9C42-0AEA33261551}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Administration Unit Staff Information143481199/12/2012 6:50:57 PM9/12/2012 6:50:57 PMAdministration Section Christopher A. Peoples, P.E. – State Materials Engineer – 919-329-4000 Jack Cowsert, P.E. – State Materials Quality Engineer – 919-329-4000 The STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{7CF1D65E-C7A5-4818-869F-06F76776A1F9}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Admixture Submittal Form143481206/6/2012 1:29:56 PM6/6/2012 1:29:56 PMadmsubfrm.xls STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govzipFalseziphttps://connect.ncdot.gov/resources/Materials{356DD1AA-C9FF-4A3B-AD1D-7FC0F444149E}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_Default.js1717

Was this page helpful?