 Concrete Field Tech Study Guide Search Results

 

 

02 - NCDOT Materials and Tests Letters and Policies143487499/30/2016 2:02:12 PMNCDOT III (c) Date January 15, 2010 Subject Minimum Sampling Frequencies for Incidental and Structural Concrete https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
04 - Field Test Procedures and Standards143487609/21/2016 2:13:30 AMThe equipment needed to run the slump test is shown above The slump cone, a tamping rod, a scoop, a ruler, and a non-absorbent surface that is stable and level https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
00 - General Information1434876411/13/2018 9:25:37 PMObtaining the NCDOT / ACI Certification All Students must have a passing grade on both the written (Part 1) and Field Performance (Part 2) examinations as described herein https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
04 - Field Test Procedures and Standards143487659/19/2016 7:02:12 PMMAKING AND CURING TEST SPECIMENS IN THE FIELD (ASTM C-31) 1. Obtain a representative sample from the middle of the load by passing the receptacle through the entire https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
04 - Field Test Procedures and Standards143487669/21/2016 5:32:14 PMCHASE INDICATOR TEST (AASHTO T-199) The equipment needed to run the chace indicator test is shown above Thoroughly remix the sample of concrete prior https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
00 - General Information1434875611/25/2018 5:25:58 PMContents NCDOT CONCRETE FIELD TECHNICIAN SCHOOL PRE-EXAM NCDOT CONCRETE FIELD TECHNICIAN SCHOOL PRE-EXAM ANSWER KEY https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
04 - Field Test Procedures and Standards143487639/19/2016 7:11:20 PMVOLUMETRIC METHOD (ROLL-O-METER) ASTM C-173 Dampen roll-o-meter bowl Fill the 1st layer with concrete to about half of the volume of the https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
03 - NCDOT Forms1434875510/25/2019 11:34:55 AMConcrete Batch Ticket Concrete Batch Ticket (M&T 903) Concrete Batch Ticket - PDF Fillable Form (M&T 903) ​Concrete Mix Design Form https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
04 - Field Test Procedures and Standards143487599/21/2016 2:14:41 AMSAMPLING FRESHLY MIXED CONCRETE (ASTM C-172) 1. Upon arrival of the concrete on the project the inspector checks the batch ticket to verify the project number and class of https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
01 - Components of Concrete1434877410/24/2016 1:17:06 PMContents PORTLAND CEMENT CEMENT TYPES ​ ​ CEMENT PROPERTIES https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse

 Related Documents

 

 

085 SRW 2016 annual facility audit143480464/20/2016 5:23:10 PM4/20/2016 5:23:10 PMSegmental Retaining Wall Units Annual Facility Audit The review of documentation and collection of samples will confirm the facility meets all NCDOT standards, and is in compliance STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{29633B8D-F180-44B9-936A-5078CCB5283C}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2004_10_09_HDPE QC143480484/19/2016 3:06:37 PM4/19/2016 3:06:37 PM STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION MATERIALS & TESTS STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{583B1CCF-4372-49DF-807B-933B76F87EA4}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2004_10_14_Joining Dissimilar Pipe Materal143480494/22/2016 1:41:03 PM4/22/2016 1:41:03 PMMICHAEL F. EASLEY PO BOX 25201, RALEIGH, NC 27611-5201 W. LYNDO TIPPETT Questions have arisen concerning the joining of dissimilar pipe materials such as STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{C75C43FF-7E90-4611-85A1-6B08589407DB}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Cylinders143480505/10/2016 4:42:25 PM5/10/2016 4:42:25 PMSUBJECT: Making, Storing and Transporting Concrete Cylinders We continue to see improperly made, stored and cured concrete cylinders delivered to the Materials and Tests STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{A67ABC69-09C1-4B97-9240-EA5FA0387872}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Min_Sampling143480519/27/2016 6:53:59 PM9/27/2016 6:53:59 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{6703AE45-A589-4CE7-ABF8-D67DC1E0EFD2}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2012_ROADWAY - Geotextile for Pavement Stabilization (January 2014)143480524/26/2016 4:05:41 PM4/26/2016 4:05:41 PMFurnish and place geotextile for pavement stabilization in accordance with the contract Geotextile for pavement stabilization may be required to prevent pavement cracking and STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{7B4E2518-86E9-4BFE-8C94-2C8AAD22D305}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2014 - Aggregate Plant Ownership Update Form1434805310/3/2014 3:43:52 PM10/3/2014 3:43:52 PMRevised 9/30/14 JSE NCDOT Aggregate QC/QA Plant Ownership Update Name of Company: Name of Facility: NCDOT Facility Number: CA FA Facility Mailing STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{F85AAD30-E1D5-479A-862B-32DF37BC303B}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2015 Precast Concrete Facility Ownership Update143480544/20/2016 7:52:13 PM4/20/2016 7:52:13 PMName And Title Of On-Site Contact TO BE COMPLETED BY MATERIALS & TESTS UNIT REPRESENTATIVE I certify that the foregoing entries are correct STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{E2CF0E2E-EC6B-4B07-9A7C-E1DD120ABF35}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2015_01_16 Concrete Air Meter Request Form Field143480555/3/2016 8:42:55 PM5/3/2016 8:42:55 PM CONCRETE AIR METER REQUEST FORM RETURN FORM TO M&T DIVISION SMS FORM MUST BE COMPLETE AND SIGNED TO PROCESS ORDER TYPE B PRESSURE METER (FORNEY TYPE STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{0A6244B5-99D1-41D7-9C6F-C1B4AFB52516}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2016 Concrete Pipe Annual Facility Audit Checklist1434805611/17/2016 6:48:41 PM11/17/2016 6:48:41 PMFacility Owner: Facility Number and Location The following steps are to be performed during the annual plant inspections unless noted ____ ____ Facility manager is sending all inspection STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{6C180145-0D09-4E30-A786-69C29D7591C0}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?