expand Section : 00 - General Information ‎(3)
expand Section : 01 - Components of Concrete ‎(5)
expand Section : 02 - NCDOT Materials and Tests Letters and Policies ‎(8)
expand Section : 03 - NCDOT Forms ‎(1)
expand Section : 04 - Field Test Procedures and Standards ‎(9)
expand Section : 05 - Study Questions ‎(1)
expand Section : 06 - Terms and Definitions ‎(3)
expand Section : 07 - Course Evaluation and Chase Examination Sheets ‎(1)

 Concrete Field Tech Study Guide Search Results

 

 

02 - NCDOT Materials and Tests Letters and Policies102377729/27/2016 6:46:52 PMPROCEDURES FOR USE OF THE 4” X 8” PLASTIC MOLDS I. Preparing the 4” X 8” plastic molds for reuse This aids in separation of the mold from the concrete cylinder and helps https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
02 - NCDOT Materials and Tests Letters and Policies102377759/30/2016 5:43:23 PMNCDOT III (e) Date January 2, 2002 Subject Concrete Mix Design New Numbering Scheme Replace previous 10 character mixture ID with new 14 https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
02 - NCDOT Materials and Tests Letters and Policies102377766/4/2019 7:55:29 PMThe concrete producer submits a mix design on M&T Form 312U and includes supporting documentation for the mix to the Materials and Tests Unit by sending an email to https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
04 - Field Test Procedures and Standards102377839/21/2016 2:14:41 AMSAMPLING FRESHLY MIXED CONCRETE (ASTM C-172) 1. Upon arrival of the concrete on the project the inspector checks the batch ticket to verify the project number and class of https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
04 - Field Test Procedures and Standards102377859/21/2016 2:06:35 AMDENSITY (UNIT WEIGHT) TEST ASTM C-138 The equipment needed to run the unit weight test is shown above A scale, a unit weight bucket, a tamping rod, a scoop, a rubber https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
00 - General Information1023778811/13/2018 9:25:37 PMObtaining the NCDOT / ACI Certification All Students must have a passing grade on both the written (Part 1) and Field Performance (Part 2) examinations as described herein https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
05 - Study Questions102377919/16/2016 3:30:08 PM(Click for Printable PDF) ​THE TESTING OF PORTLAND CEMENT CONCRETE 1. In making a slump test a. The cone should be filled in ___________ layers https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
06 - Terms and Definitions102377929/16/2016 3:28:33 PMDo - Get a copy of approved DOT batch ticket from truck driver as soon as concrete arrives on project Don’t - As DOT Inspector, instruct the truck driver to add water to a load https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
01 - Components of Concrete102377969/21/2016 5:58:13 PMConcrete is a manufactured product that has two main phase components aggregates and paste Aggregates are normally of two types, fine and coarse, and occupy about 60 to 80 percent https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse
01 - Components of Concrete102377978/26/2016 7:59:25 PMhttps://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalse

 Related Documents

 

 

qc-1_instructions and blank form1023839112/12/2017 2:35:54 PM12/12/2017 2:35:54 PMI certify that all Quality Control Tests were performed on this mix and the results listed above are correct BY PROVIDING THIS DATA UNDER MY SIGNATURE AND / OR HICAMS #, I ATTEST STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{E4E77C7C-71E5-4C50-BCC6-FFBBB957A7DE}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
085 SRW 2016 annual facility audit102379164/20/2016 5:23:10 PM4/20/2016 5:23:10 PMSegmental Retaining Wall Units Annual Facility Audit The review of documentation and collection of samples will confirm the facility meets all NCDOT standards, and is in compliance STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{29633B8D-F180-44B9-936A-5078CCB5283C}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2004_10_09_HDPE QC102379184/19/2016 3:06:37 PM4/19/2016 3:06:37 PM STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION MATERIALS & TESTS STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{583B1CCF-4372-49DF-807B-933B76F87EA4}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2004_10_14_Joining Dissimilar Pipe Materal102379194/22/2016 1:41:03 PM4/22/2016 1:41:03 PMMICHAEL F. EASLEY PO BOX 25201, RALEIGH, NC 27611-5201 W. LYNDO TIPPETT Questions have arisen concerning the joining of dissimilar pipe materials such as STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{C75C43FF-7E90-4611-85A1-6B08589407DB}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Cylinders102379205/10/2016 4:42:25 PM5/10/2016 4:42:25 PMSUBJECT: Making, Storing and Transporting Concrete Cylinders We continue to see improperly made, stored and cured concrete cylinders delivered to the Materials and Tests STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{A67ABC69-09C1-4B97-9240-EA5FA0387872}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Min_Sampling102379219/27/2016 6:53:59 PM9/27/2016 6:53:59 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{6703AE45-A589-4CE7-ABF8-D67DC1E0EFD2}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2012 QMS Asphalt Manual102379223/20/2013 1:55:38 PM3/20/2013 1:55:38 PMIt is intended to serve as a basic introduction to asphalt construction for the new technician as well as a reference source to those with considerable experience STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{47DDF430-69EC-42A0-8278-D7F938D35636}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2012_ROADWAY - Geotextile for Pavement Stabilization (January 2014)102379234/26/2016 4:05:41 PM4/26/2016 4:05:41 PMFurnish and place geotextile for pavement stabilization in accordance with the contract Geotextile for pavement stabilization may be required to prevent pavement cracking and STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{7B4E2518-86E9-4BFE-8C94-2C8AAD22D305}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2014 - Aggregate Plant Ownership Update Form1023792510/3/2014 3:43:52 PM10/3/2014 3:43:52 PMRevised 9/30/14 JSE NCDOT Aggregate QC/QA Plant Ownership Update Name of Company: Name of Facility: NCDOT Facility Number: CA FA Facility Mailing STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{F85AAD30-E1D5-479A-862B-32DF37BC303B}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2014 QMS Asphalt Manual102379261/24/2014 9:49:28 PM1/24/2014 9:49:28 PMMATERIALS AND TESTS UNIT HMA/QMS 2014 SUPERPAVE 2014 SUPERPAVE ASPHALT QUALITY MANAGEMENT SYSTEMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{0B5DDCC3-667C-43A8-8D9D-35C9695A5C8B}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?