expand Section : 00 - General Information ‎(3)
expand Section : 01 - Components of Concrete ‎(5)
expand Section : 02 - NCDOT Materials and Tests Letters and Policies ‎(8)
expand Section : 03 - NCDOT Forms ‎(1)
expand Section : 04 - Field Test Procedures and Standards ‎(9)
expand Section : 05 - Study Questions ‎(1)
expand Section : 06 - Terms and Definitions ‎(3)
expand Section : 07 - Course Evaluation and Chase Examination Sheets ‎(1)

 Concrete Field Tech Study Guide Search Results

 

 

00 - General Information1023778011/25/2018 5:25:58 PMContents NCDOT CONCRETE FIELD TECHNICIAN SCHOOL PRE-EXAM NCDOT CONCRETE FIELD TECHNICIAN SCHOOL PRE-EXAM ANSWER KEY https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Nathan Garcia
04 - Field Test Procedures and Standards102377829/21/2016 2:15:24 AMTEMPERATURE FOR FRESHLY MIXED CONCRETE (ASTM C-1064) 1. Run temperature test on first load and when cylinders or beams are made The probe shall be surrounded by at least 3 inches https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Nathan Garcia
04 - Field Test Procedures and Standards102377849/21/2016 2:13:30 AMThe equipment needed to run the slump test is shown above The slump cone, a tamping rod, a scoop, a ruler, and a non-absorbent surface that is stable and level https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Nathan Garcia
01 - Components of Concrete1023779810/24/2016 1:17:06 PMContents PORTLAND CEMENT CEMENT TYPES ​ ​ CEMENT PROPERTIES https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Ted Naylor
02 - NCDOT Materials and Tests Letters and Policies102377729/27/2016 6:46:52 PMPROCEDURES FOR USE OF THE 4” X 8” PLASTIC MOLDS I. Preparing the 4” X 8” plastic molds for reuse This aids in separation of the mold from the concrete cylinder and helps https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Nathan Garcia
02 - NCDOT Materials and Tests Letters and Policies102377759/30/2016 5:43:23 PMNCDOT III (e) Date January 2, 2002 Subject Concrete Mix Design New Numbering Scheme Replace previous 10 character mixture ID with new 14 https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Ted Naylor
02 - NCDOT Materials and Tests Letters and Policies102377766/4/2019 7:55:29 PMThe concrete producer submits a mix design on M&T Form 312U and includes supporting documentation for the mix to the Materials and Tests Unit by sending an email to https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Nathan Garcia
04 - Field Test Procedures and Standards102377839/21/2016 2:14:41 AMSAMPLING FRESHLY MIXED CONCRETE (ASTM C-172) 1. Upon arrival of the concrete on the project the inspector checks the batch ticket to verify the project number and class of https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Nathan Garcia
04 - Field Test Procedures and Standards102377859/21/2016 2:06:35 AMDENSITY (UNIT WEIGHT) TEST ASTM C-138 The equipment needed to run the unit weight test is shown above A scale, a unit weight bucket, a tamping rod, a scoop, a rubber https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Nathan Garcia
00 - General Information1023778811/13/2018 9:25:37 PMObtaining the NCDOT / ACI Certification All Students must have a passing grade on both the written (Part 1) and Field Performance (Part 2) examinations as described herein https://connect.ncdot.gov/resources/Materials/Lists/ConcreteFieldTechStudyGuide/AllItems.aspxFalseSystem Account;Nathan Garcia

 Related Documents

 

 

2021 Aggregate QCQA Program Manual128807037/19/2021 9:07:38 PM7/19/2021 9:07:38 PMThe Aggregate Quality Control/Quality Assurance Program is designed to allow aggregate producers the responsibility for controlling the quality of material they produce, and to STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx110https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{A1790172-F3A7-49F2-BBD0-2D69F0EE269E}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Appendices RFID Tag Parameters Plastic Pipe43830077/29/2021 2:06:30 PM7/29/2021 2:06:30 PMRFID Tag Parameters for use on Plastic Pipe Dimensions: Must be a minimum size of 4.5”x 1”x .017”, with the option of being larger Material: .002’thick Polyester; total tag STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{408C6070-5C87-49E9-8D2F-841EC53428F2}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Appendices RFID Tag Parameters Concrete Pipe43830087/29/2021 2:04:33 PM7/29/2021 2:04:33 PMRFID Tag Parameters for use on Concrete Pipe Material: .003" thick Polyester for subsurface printing Additional polyester layers total .2” Tag must be slotted on either end and STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{0AAE2503-EFF1-4B08-B0DB-347CDA734F28}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
Appendices RFID Tag Parameters Metal Pipe43830097/29/2021 2:05:25 PM7/29/2021 2:05:25 PMRFID Tag Parameters for use on Metal Pipe Dimensions: Must be a minimum size of 2.875”x 1.375”x .085”, with the option of being larger Material: .002" thick Polyester label adhered STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{171B1A84-FA51-4F1C-B39E-88494C296DF1}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
085 SRW 2016 annual facility audit102379164/20/2016 5:23:10 PM4/20/2016 5:23:10 PMSegmental Retaining Wall Units Annual Facility Audit The review of documentation and collection of samples will confirm the facility meets all NCDOT standards, and is in compliance STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{29633B8D-F180-44B9-936A-5078CCB5283C}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2004_10_09_HDPE QC102379184/19/2016 3:06:37 PM4/19/2016 3:06:37 PM STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION MATERIALS & TESTS STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{583B1CCF-4372-49DF-807B-933B76F87EA4}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2004_10_14_Joining Dissimilar Pipe Materal102379194/22/2016 1:41:03 PM4/22/2016 1:41:03 PMMICHAEL F. EASLEY PO BOX 25201, RALEIGH, NC 27611-5201 W. LYNDO TIPPETT Questions have arisen concerning the joining of dissimilar pipe materials such as STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{C75C43FF-7E90-4611-85A1-6B08589407DB}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Cylinders102379205/10/2016 4:42:25 PM5/10/2016 4:42:25 PMSUBJECT: Making, Storing and Transporting Concrete Cylinders We continue to see improperly made, stored and cured concrete cylinders delivered to the Materials and Tests STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{A67ABC69-09C1-4B97-9240-EA5FA0387872}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2010_Concrete_Min_Sampling102379219/27/2016 6:53:59 PM9/27/2016 6:53:59 PMSTS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{6703AE45-A589-4CE7-ABF8-D67DC1E0EFD2}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515
2012 QMS Asphalt Manual102379223/20/2013 1:55:38 PM3/20/2013 1:55:38 PMIt is intended to serve as a basic introduction to asphalt construction for the new technician as well as a reference source to those with considerable experience STS_ListItem_DocumentLibraryhttps://connect.ncdot.gov/resources/Materials/MaterialsResources/Forms/Default.aspx0https://connect.ncdot.govpdfFalsepdfhttps://connect.ncdot.gov/resources/Materials{47DDF430-69EC-42A0-8278-D7F938D35636}~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js1515

Was this page helpful?